# US 2024/0003252 A1 · Continuous mining and delayed filling mining method for deep ore body masonry structure

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0003252 A1
- Document ID: US20240003252A1
- Status: Published application
- Kind: A1
- Application number: 17/897,788
- Filed: 2022-08-29
- Published: 2024-01-04
- Earliest claimed: 2022-07-04
- Assignees: Shandong Gold Mining Co., Ltd.
- Applicants: Shandong Gold Mining Co., Ltd.
- Inventors: Mingde Zhu; Zaitao Liu; Chao Peng; Huanxin Liu; Yingjie Hao; Kuikui Hou; Yantian Yin; Zhihai An; Haoqin Zhang; Guilin Li; Xingquan Liu; Zhen Liu
- Web page: https://patentgrep.com/patent/US20240003252A1

## CPC

- E21C 41/22: for ores, e.g. mining placers
- B65G 43/00: Control devices, e.g. for safety, warning or fault-correcting
- E21C 41/16: Methods of underground mining (winning machines therefor E21C25/00 - E21C39/00); Layouts therefor
- E21F 13/02: {Transport of mined mineral} in galleries
- E21F 15/005: {characterised by the kind or composition of the backfilling material}
- B65G 15/24: in tandem
- E21C: MINING OR QUARRYING
- B65G: TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS (packaging B65B; handling thin or filamentary materials, e.g. paper sheets or thread, B65H; cranes B66C; portable mobile or lifting or hauling appliances, e.g. hoists, B66D; devices for lifting or lowering goods for loading or unloading purposes, e.g. fork-lift trucks, B66F9/00; emptying bottles, jars, casks, barrels or similar containers, not otherwise provided for, B67C9/00; delivering or transferring liquids B67D; filling or discharging vessels for liquefied, solidified or compressed gases F17C; pipe-line systems for fluids F17D)
- E21F: SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS

## Abstract

A continuous mining and delayed filling mining method for a deep ore body masonry structure is provided, comprising: dividing an ore body into ore blocks along a trend, internally dividing each ore block into stopes with square masonry structures, and reserving a rib pillar between the ore blocks; arranging an ore block conveyor belt gallery and a stope conveyor belt gallery at the lower parts of the ore blocks, arranging ore block crossheading and stope crossheading at the upper parts of the ore blocks, mining the stopes in the sequence from the foot wall to the hanging wall. In accordance with the present disclosure, adverse effects caused by deep high geo-stress and high geo-temperature on mining operation can be effectively overcome. The method has the advantages of low carbon and environmental protection, safety of recovery operation, high mechanization of stope operation, low labor intensity of manual operation and the like.

## Claims

### Claim 1

A continuous mining and delayed filling mining method for a deep ore body masonry structure, comprising the following steps:
(1) ore block and stop arrangement: dividing an ore body into ore blocks along a trend, internally dividing each ore block into strips, and internally dividing each strip into stopes with square masonry structures, and reserving a rib pillar between the ore blocks;
(2) preliminary mining design arrangement and construction: horizontally constructing an ore block conveyor belt gallery in the rib pillar from a sub-level haulage roadway at the middle section to the boundary of the hanging wall of the ore body, and constructing a stope conveyor belt gallery along the trend from the ore block conveyor belt gallery so as to connect the stopes on the same strip in the trend direction; horizontally constructing ore block crossheading in the rib pillar from the sub-level haulage roadway at the upper middle section, and constructing stope crossheading from the ore block crossheading in the trend so as to connect the stopes on the same strip along the trend direction, wherein the ore blocks at both sides of the rib pillar share one ore block conveyor belt gallery and the ore block crossheading, the ore block conveyor belt gallery is in communication with the end part ore block crossheading through a service raise, and the ore block conveyor belt gallery communicates with an ore drop shaft; and
(3) ore block mining and filling: mining the stops in the sequence from the foot wall to the hanging wall, that is, first mining the stops in the strip close to the foot wall, and then mining the stopes in the strip close to the hanging wall, wherein the stopes in the same strip are mined in a retreating manner from the side away from the ore block conveyor belt gallery to the side of the ore block conveyor belt gallery, and stopes in the corresponding strips on both sides of the rib pillar are subjected to mining and filling in a staggered manner; during stope mining, firstly, performing full-section expanding brush on the stope crossheading in a mining stope range to form an upper operation chamber, constructing, by a raise boring machine, a slot raise at the center of the upper operation chamber to be in communication with the stop conveyor belt gallery at the lower parts of the stope, and constructing, by a down-the-hole drill, a downward medium-depth hole around the slot raise; installing an ore drawing funnel at the bottom of the slot raise, installing conveyor belts in the stope conveyor belt gallery and the ore block conveyor belt gallery, wherein a material receiving end of the conveyor belt is located on the lower part of the ore drawing funnel of the mining stope, and a discharging end of the conveyor belt is located at the ore drop shaft; filling detonator explosives into the downward medium-depth hole in the upper operation chamber of the stope; performing millisecond subsection blasting for ore breaking, drawing the caved ore onto the conveyor belt through the ore drawing funnel and conveying the caved ore to the ore drop shaft through the conveyor belt, constructing filling retaining walls at the end parts of the stope conveyor belt gallery and the stope crossheading after the blasting ore drawing of the stope is completed and filling the stope, and repeating the steps until the stopes in the ore block are completely mined and filled.

### Claim 2 (depends on 1)

The continuous mining and delayed filling mining method for the deep ore body masonry structure according to claim 1, wherein the ore block has a length of 50 m to 60 m, and a width of the thickness of the ore body, the stope has a plane size of 6 m×6 m to 10 m×10 m, and the rib pillar has a width of 8 m to 10 m.

### Claim 3 (depends on 1)

The continuous mining and delayed filling mining method for the deep ore body masonry structure according to claim 1, wherein the ore drawing funnel, the conveyor belt and ore drawing equipment at the lower part of the ore drop shaft are subjected to intelligent linkage closed-loop control, are started and stopped at the same time during ore drawing of the stope.

### Claim 4 (depends on 1)

The continuous mining and delayed filling mining method for the deep ore body masonry structure according to claim 1, wherein the hole bottom of the downward medium-length hole is arranged in an inverted cone shape by taking the bottom of the slot raise as the center; the hole bottom gradually rises from inside to outside, and a conical funnel bottom structure is formed at the lower part of the stope after blasting.

### Claim 5 (depends on 1)

The continuous mining and delayed filling mining method for the deep ore body masonry structure according to claim 1, wherein during stope filling, a filling body in a lime-sand ratio larger than or equal to 1:8 is adopted for filling.

### Claim 6 (depends on 4)

The continuous mining and delayed filling mining method for the deep ore body masonry structure according to claim 4, wherein the hole bottom of the downward medium-depth hole is arranged in an inverted cone shape, and the conical inclined face has an inclined angle of 50° to 55°.