# US 2024/0003225 A1 · Method of generating a drill hole sequence plan and drill hole sequence planning equipment

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0003225 A1
- Document ID: US20240003225A1
- Status: Published application
- Kind: A1
- Application number: 18/218,511
- Filed: 2023-07-05
- Published: 2024-01-04
- Earliest claimed: 2013-02-27
- Assignees: Technological Resources Pty. Limited
- Applicants: Technological Resources Pty. Limited
- Inventors: Florian Oppolzer
- Web page: https://patentgrep.com/patent/US20240003225A1

## CPC

- E21B 41/00: Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B 7/02: Drilling rigs characterised by means for land transport {with their own drive}, e.g. skid mounting or wheel mounting
- E21B 7/022: {Control of the drilling operation; Hydraulic or pneumatic means for activation or operation (control circuits for drilling masts E21B15/045)}
- E21B 43/30: Specific pattern of wells, e.g. optimising the spacing of wells
- E21B 44/00: Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

Drill hole sequence planning equipment 14 includes a position determining module 18 for determining an initial location of a mobile drill rig 12. A selection module 24 selects a destination location for the drill rig 12. A corridor establishment module 26 establishes a corridor between the initial location of the drill rig 12 and its destination location, the corridor having a selected width. A processing unit 28 is responsive to the modules 18, 24 and 26 for selecting a hole location of each hole within the corridor to be drilled by the drill rig 12 sequentially as it moves from its initial location to its destination location.

## Claims

### Claim 1

A method of controlling a mobile drill rig, the method including:
providing, by a navigation unit, location information of the mobile drill rig to a position determining module;
determining, by the position determining module, an initial location of the mobile drill rig;
establishing, by a corridor establishment module, a corridor between the initial location of the drill rig and a destination location, the corridor having a selected width, the width being configured based on a desired number of blast holes falling within the corridor;
selecting a hole location of each hole of a plurality of holes within the corridor to be drilled by the mobile drill rig sequentially as it moves from the initial location to the destination location;
generating a drill hole sequence plan based on the selected hole locations; and
providing the drill hole sequence plan to a controller of the mobile drill rig so that the controller, using the location information from the navigation unit, controls automated tramming of the drill rig to the selected hole locations sequentially.

### Claim 2 (depends on 1)

The method of claim 1 which includes an operator manually selecting a width of the corridor.

### Claim 3 (depends on 1)

The method of claim 1 which includes performing a distance check to see if a hole location falls within, or within a configurable distance from, the corridor.

### Claim 4 (depends on 1)

The method of claim 1 which includes selecting an end hole location as the destination location of the mobile drill rig.

### Claim 5 (depends on 1)

The method of claim 1 which includes generating a start position of the corridor at a location which is spaced from the initial location of the mobile drill rig.

### Claim 6 (depends on 1)

The method of claim 1 further including selecting the destination location based on a pre-loaded blast hole pattern.

### Claim 7 (depends on 1)

The method of claim 1 including the further step of causing the mobile drill rig, which is responsive to the drill rig controller, to drill a hole automatically at each hole location sequentially along a tramming path as the mobile drill rig traverses the corridor.

### Claim 8

Drill hole equipment which includes:
a navigation unit which receives data from various input devices and which generates location information of a mobile drill rig;
a processing unit in communication with the navigation unit and responsive to the location information to determine an initial location of the mobile drill rig;
a corridor establishment module for establishing a corridor between the initial location of the drill rig and a destination location, the corridor having a selected width, the width being configured based on a desired number of blast holes falling within the corridor;
a user interface in communication with the navigation unit, the position determining module and the corridor establishment module, via which a hole location of each hole of a plurality of holes is selected within the corridor to be drilled by the mobile drill rig sequentially as it moves from the initial location to the destination location, the processing unit further generating a drill hole sequence plan based on the selected hole locations; and
a communications link to provide the drill hole sequence plan to a controller of the mobile drill rig so that the controller, using the location information from the navigation unit, controls automated tramming of the drill rig to the selected hole locations sequentially.
