# US 2024/0003108 A1 · Tailings deposition

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2024/0003108 A1
- Document ID: US20240003108A1
- Status: Published application
- Kind: A1
- Application number: 18/369,564
- Filed: 2023-09-18
- Published: 2024-01-04
- Earliest claimed: 2019-03-08
- Assignees: Anglo American Technical & Sustainability Services Ltd
- Applicants: Anglo American Technical & Sustainability Services Ltd.
- Inventors: Anthony Owen FILMER; Daniel John ALEXANDER; Julian Jeremy SOLES; Philip Duncan NEWMAN
- Web page: https://patentgrep.com/patent/US20240003108A1

## CPC

- C02F 11/14: with addition of chemical agents
- E02B 11/00: Drainage of soil, e.g. for agricultural purposes {(draining sports grounds E01C13/083; for consolidating foundation soil, e.g. sand drain piles E02D3/10)}
- B03B 5/30: using heavy liquids or suspensions
- B09B 1/00: Dumping solid waste
- C02F 11/16: using drying or composting beds
- C02F 2103/10: from quarries or from mining activities
- C02F: TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE (separation in general B01D; special arrangements on waterborne vessels of installations for treating water, waste water or sewage, e.g. for producing fresh water, B63J; adding materials to water to prevent corrosion C23F; treating radioactively-contaminated liquids G21F9/04; regeneration of reactants for recirculation into processes, see the relevant places for the processes)
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- B03B: SEPARATING SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS
- B09B: DISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR

## Abstract

THIS invention relates to a method of disposing of residues from the comminution and processing of ores. The method includes the steps of classifying the processing residues into a water permeable sand fraction and a tailings fraction and depositing the tailings fraction and the sand fraction to form a multilayer structure contained by at least one containment wall (14) with the sand fraction forming continuous channels (12) through the tailings fraction (10) to allow water contained in the tailings and sand to flow by gravity, through the sand channels, to water discharge points (16), and recovering the water (18) from the water discharge points.

## Claims

### Claim 1

A mine tailings dewatering site for disposing and recovering water from residues from the comminution and processing of ores comprising:
a multilayer structure contained by the containment wall, said multilayer structure comprising tailings fractions comprising particles with a p80 of less than 150 microns and sand fractions comprising sand particles with a p80 of greater than 150 microns, with the sand fractions forming continuous channels to water discharge points through the tailings fractions;
wherein air access points are provided at the sand channels, to allow water contained in the tailings fractions and sand to flow by gravity through the sand channels to said water discharge points, from which the water may be recovered.

### Claim 2 (depends on 1)

The mine tailings dewatering site claimed in claim 1, wherein the sand fraction comprises sand particles with a p80 of greater than 300 microns.

### Claim 3 (depends on 2)

The mine tailings dewatering site claimed in claim 2, wherein the sand fraction comprises sand particles with a p80 of greater than 400 microns.

### Claim 4 (depends on 1)

The mine tailings dewatering site claimed in claim 1, wherein the sand fraction is free-draining.

### Claim 5

The mine tailings dewatering site claimed in 1, wherein at least 50% of the sand residue is in the particle size range from 0.1 to 1 mm.

### Claim 6 (depends on 5)

The mine tailings dewatering site claimed in claim 5, wherein at least 70% of the sand residue is in the particle size range from 0.1 to 1 mm.

### Claim 7 (depends on 6)

The mine tailings dewatering site claimed in claim 6, wherein at least 90% of the sand residue is in the particle size range from 0.1 to 1 mm.

### Claim 8 (depends on 1)

The mine tailings dewatering site claimed in claim 1, wherein the sand residue contains less than 25% sub 0.75 mm material.

### Claim 9 (depends on 8)

The mine tailings dewatering site claimed in claim 8, wherein the sand residue contains less than 15% sub 0.75 mm material.

### Claim 10 (depends on 9)

The mine tailings dewatering site claimed in claim 9, wherein the sand residue contains less than 10% sub 0.75 mm material.

### Claim 11 (depends on 1)

The mine tailings dewatering site claimed in claim 1, wherein a containment wall located at a water recovery end of the structure is water permeable and water drains from the discharge points through the wall.

### Claim 12 (depends on 1)

The mine tailings dewatering site claimed in claim 1, wherein a containment wall at a water recovery end of the structure is not water permeable and water is removed from the structure by pumping from a central water discharge point.

### Claim 13 (depends on 1)

The mine tailings dewatering site claimed claim 1, wherein air access points are provided for the sand channels, either at a deposition end of the structure or by any other means of connection to the air.

### Claim 14 (depends on 1)

The mine tailings dewatering site claimed in claim 1, wherein the maximum distance from any point in the tailings to the nearest sand channel is less than 10 metres.

### Claim 15 (depends on 14)

The mine tailings dewatering site claimed in claim 14, wherein the maximum distance from any point in the tailings to the nearest sand channel is less than 3 metres.

### Claim 16 (depends on 15)

The mine tailings dewatering site claimed in claim 15, wherein the the maximum distance from any point in the tailings to the nearest sand channel is less than 2 metres.

### Claim 17 (depends on 1)

The mine tailings dewatering site claimed in any claim 1, wherein sand channels are connected vertically and laterally, to create a 3-dimensional matrix of permeable channels within the tailings.

### Claim 18 (depends on 1)

The mine tailings dewatering site claimed in claim 1, wherein the tailings fraction has a beaching angle of about 0.5% to 2%.

### Claim 19 (depends on 18)

The mine tailings dewatering site claimed in claim 18, wherein the tailings fraction has a beaching angle of about 0.5% to 1%.

### Claim 20 (depends on 19)

The mine tailings dewatering site claimed in claim 19, wherein the tailings fraction has a beaching angle of about 0.5%.

### Claim 21 (depends on 1)

The mine tailings dewatering site claimed in claim 1, wherein, the tailings layers are 1 to 10 m thick, and sand channels are on average 0.05 to 2 m thick.

### Claim 22 (depends on 21)

The mine tailings dewatering site claimed in claim 21, wherein the sand channels are 0.2 and 1 m thick.

### Claim 23 (depends on 22)

The mine tailings dewatering site claimed in claim 22, wherein the sand channels are between 0.3 and 0.7 m thick.

### Claim 24 (depends on 1)

The mine tailings dewatering site claimed in claim 1, wherein the sand fractions are deposited in discrete rows spaced apart, and tailings fractions are deposited sequentially in layers, to form tailings layers that are 1 to 10 m thick, and sand channels that are 0.05 to 2 m thick, and spaced apart by 2 to 10 m.

### Claim 25 (depends on 24)

The mine tailings dewatering site claimed in claim 24, wherein the sand fractions are deposited in discrete rows spaced apart, and tailings fractions are deposited sequentially in layers, to form tailings layers that are 1 to 10 m thick, and sand channels that 0.05 to 1 m thick, and spaced apart by 2 to 5 m.

### Claim 26 (depends on 1)

The mine tailings dewatering site claimed in claim 1, wherein sand is deposited such as to form vertical wicking drains in the tailings layers between upper and lower sand channels.

### Claim 27 (depends on 1)

The mine tailings dewatering site claimed in claim 1, the structure comprising internal and external sand bunds, and the bunds are subdivided to form separate containment paddocks.

### Claim 28 (depends on 1)

The mine tailings dewatering site claimed in claim 1, wherein the sand is generated by a coarse beneficiation process and the tailings is generated from conventional flotation of the ore.

### Claim 29 (depends on 28)

The mine tailings dewatering site claimed in claim 28, wherein the coarse beneficiation process is coarse particle flotation, coarse particle flotation, screening, gravity separation, electrostatic separation, and magnetic separation, typically coarse particle flotation.

### Claim 30 (depends on 29)

The mine tailings dewatering site claimed in claim 29, wherein the coarse beneficiation process is coarse particle flotation.

### Claim 31 (depends on 1)

The mine tailings dewatering site claimed in claim 1, wherein the sand is generated from sand heap leaching, and the tailings is generated from conventional agitation leaching.