Scheduling beamforming communications based on a number of communication devices in each beam
AssigneeTelefonaktiebolaget LM Ericsson (publ)
InventorZaigham KAZMI
Life of this patent
Estimating the term…
Loading patent…
AssigneeTelefonaktiebolaget LM Ericsson (publ)
InventorZaigham KAZMI
Estimating the term…
A network node configured to communicate with a plurality of communication devices in a communications network via a plurality of beams can schedule communications based on the number of communication devices in each beam. The network node can determine a number of communication devices of the plurality of communication devices that are in a beam of the plurality of beams. The network node can determine a scheduling priority of a communication device of the plurality of communication devices based on the number of communication devices that are in the beam, the communication device being in the beam. The network node can select the beam based on the scheduling priority of the communication device. The network node can, responsive to selecting the beam, schedule communication with the communication device via the beam.
A method of operating a network node configured to communicate with a plurality of communication devices in a communications network via a plurality of beams, the method comprising:
A network node configured to communicate with a plurality of communication devices in a communications network via a plurality of beams, the network node comprising:
A network node configured to communicate with a plurality of communication devices in a communications network via a plurality of beams, the network node adapted to perform operations comprising:
A computer program comprising program code to be executed by processing circuitry of a network node configured to communicate with a plurality of communication devices in a communications network via a plurality of beams, whereby execution of the program code causes the network node to perform operations comprising:
19-20. (canceled)
The computer program of claim 21, wherein determining the first scheduling priority further comprises determining the first scheduling priority based on the number of communication devices in the beam relative to the number of communication devices in each beam of the plurality of beams.
Dependencies are inferred from the claim text.