# US 2023/0419254 A1 · Processing messages in a multi-tier environment

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0419254 A1
- Document ID: US20230419254A1
- Status: Published application
- Kind: A1
- Application number: 17/850,694
- Filed: 2022-06-27
- Published: 2023-12-28
- Earliest claimed: 2022-06-27
- Assignees: Sap SE
- Applicants: Sap SE
- Inventors: Venkata Tummala; Margherita Monni; Sowmya Sampath; Vanishree Malagi
- Web page: https://patentgrep.com/patent/US20230419254A1

## CPC

- G06Q 10/0875: Itemisation or classification of parts, supplies or services, e.g. bill of materials
- G06Q 10/0631: Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

In an example embodiment, a multi-tier solution is provided in a system that will solve the visibility and bottleneck identification issues faced by manufacturers who produce finished items in a system while the same or separate system is used to procure one or more components used to produce the finished items. More particularly, the multi-tier solution uses multi-tier data to give the user a view of a finished item material and all of its components in one screen/view.

## Claims

### Claim 1

A system comprising:
at least one hardware processor; and
memory storing an application executable by the at least one hardware processor of the system to perform operations comprising:
obtaining a first data structure and a second data structure, generated by a first system, the first data structure containing hierarchical data regarding a first finished item and one or more components of the first finished item, the second data structure containing hierarchical data regarding a second finished item and one or more components of the second finished item;
receiving a first message regarding the first finished item;
in response to the receiving the first message and a determination that the first message corresponds to a finished item, creating a first mini-data structure and adding all of the one or more components of the first finished item from the first data structure into the first mini-data structure;
receiving a second message regarding a particular component of the one or more components of the second finished item;
in response to the receiving the second message and a determination that the second message corresponds to a component, creating a second mini-data structure and adding only the particular component from the second data structure into the second mini-data structure; and
causing rendering of a screen by obtaining planning information corresponding to the first mini-data structure and the second mini-data structure and causing rendering of the planning information in a single view of a user interface.

### Claim 2 (depends on 1)

The system of claim 1, wherein the first message includes planning information regarding the first finished item; and
wherein the operations further comprise saving the planning information regarding the first finished item in a database.

### Claim 3 (depends on 2)

The system of claim 2, wherein the database is an in-memory database.

### Claim 4 (depends on 2)

The system of claim 2, wherein the operations further comprise:
receiving a third message regarding the first finished item; and
updating the saved planning information regarding the first finished item with information from the third message.

### Claim 5 (depends on 1)

The system of claim 1, wherein the operations further comprise:
receiving a fourth message regarding a second component of the second finished item;
in response to the receiving of the fourth message, updating the second mini-data structure to include the second component of the second finished item from the second data structure.

### Claim 6 (depends on 1)

The system of claim 1, wherein the planning information includes inventory levels for finished items and components of finished items.

### Claim 7 (depends on 1)

The system of claim 1, wherein the first data structure is a first Bill of Material (BOM) data structure, the second data structure is a second BOM data structure, the first and second messages are product activity messages, the first mini-data structure is a first mini-BOM data structure, the second mini-data structure is a second mini-BOM data structure, and the first system is a first Enterprise Resource Planning system.

### Claim 8

A computerized method comprising:
obtaining a first data structure and a second data structure, generated by a first system, the first data structure containing hierarchical data regarding a first finished item and one or more components of the first finished item, the second data structure containing hierarchical data regarding a second finished item and one or more components of the second finished item;
receiving a first message regarding the first finished item;
in response to the receiving the first message and a determination that the first message corresponds to a finished item, creating a first mini-data structure and adding all of the one or more components of the first finished item from the first data structure into the first mini-data structure;
receiving a second message regarding a particular component of the one or more components of the second finished item;
in response to the receiving the second message and a determination that the second message corresponds to a component, creating a second mini-data structure and adding only the particular component from the second data structure into the second mini-data structure; and
causing rendering of a screen by obtaining planning information corresponding to the first mini-data structure and the second mini-data structure and causing rendering of the planning information in a single view of a user interface.

### Claim 9 (depends on 8)

The method of claim 8, wherein the first message includes planning information regarding the first finished item; and
wherein the method further comprises saving the planning information regarding the first finished item in a database.

### Claim 10 (depends on 9)

The method of claim 9, wherein the database is an in-memory database.

### Claim 11 (depends on 9)

The method of claim 9, further comprising:
receiving a third message regarding the first finished item; and
updating the saved planning information regarding the first finished item with information from the third message.

### Claim 12 (depends on 8)

The method of claim 8, further comprising:
receiving a fourth message regarding a second component of the second finished item;
in response to the receiving of the fourth message, updating the second mini-data structure to include the second component of the second finished item from the second data structure.

### Claim 13 (depends on 8)

The method of claim 8, wherein the planning information includes inventory levels for finished items and components of finished items.

### Claim 14 (depends on 8)

The method of claim 8, wherein the planning information includes projected usage of finished items and components of finished items.

### Claim 15

A non-transitory machine-readable storage medium comprising instructions, which when implemented by one or more machines, cause the one or more machines to perform operations comprising:
obtaining a first data structure and a second data structure, generated by a first system, the first data structure containing hierarchical data regarding a first finished item and one or more components of the first finished item, the second data structure containing hierarchical data regarding a second finished item and one or more components of the second finished item;
receiving a first message regarding the first finished item;
in response to the receiving the first message and a determination that the first message corresponds to a finished item, creating a first mini-data structure and adding all of the one or more components of the first finished item from the first data structure into the first mini-data structure;
receiving a second message regarding a particular component of the one or more components of the second finished item;
in response to the receiving the second message and a determination that the second message corresponds to a component, creating a second mini-data structure and adding only the particular component from the second data structure into the second mini-data structure; and
causing rendering of a screen by obtaining planning information corresponding to the first mini-data structure and the second mini-data structure and causing rendering of the planning information in a single view of a user interface.

### Claim 16 (depends on 15)

The non-transitory machine-readable storage medium of claim 15, wherein the first message includes planning information regarding the first finished item; and
wherein the operations further comprise saving the planning information regarding the first finished item in a database.

### Claim 17 (depends on 16)

The non-transitory machine-readable storage medium of claim 16, wherein the database is an in-memory database.

### Claim 18 (depends on 16)

The non-transitory machine-readable storage medium of claim 16, wherein the operations further comprise:
receiving a third message regarding the first finished item; and
updating the saved planning information regarding the first finished item with information from the third message.

### Claim 19 (depends on 15)

The non-transitory machine-readable storage medium of claim 15, wherein the operations further comprise:
receiving a fourth message regarding a second component of the second finished item;
in response to the receiving of the fourth message, updating the second mini-data structure to include the second component of the second finished item from the second data structure.

### Claim 20 (depends on 15)

The non-transitory machine-readable storage medium of claim 15, wherein the planning information includes inventory levels for finished items and components of finished items.
