# US 2023/0418351 A1 · Systems and methods for depassivation of a battery of an internet-of-things device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0418351 A1
- Document ID: US20230418351A1
- Status: Published application
- Kind: A1
- Application number: 18/339,469
- Filed: 2023-06-22
- Published: 2023-12-28
- Earliest claimed: 2022-06-22
- Applicants: Positioning Universal Inc.
- Inventors: Jorma Seppanen; Mark Wells; Greg Sutton
- Web page: https://patentgrep.com/patent/US20230418351A1

## CPC

- G06F 1/30: Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations (for resetting only G06F1/24)
- G01R 31/386: {using test-loads}
- G01R 31/392: Determining battery ageing or deterioration, e.g. state of health
- G06F 1/28: Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
- G16Y 20/30: relating to resources, e.g. consumed power
- G16Y 40/40: Maintenance of things
- H01M 10/425: {Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing (printed circuits H05K1/00)}
- H01M 10/48: Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte (constructional details of current conducting connections for detecting conditions inside cells or batteries, e.g. details of voltage sensing terminals, H01M50/569)
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02J 13/1337: {involving the use of Internet protocols}
- H01M 2010/4271: {Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing}
- Y02E 60/10: Energy storage using batteries
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G16Y: INFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
- H01M: PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

Embodiments of the present disclosure provide systems and methods for extending the operational life of battery-operated devices, such as an Internet-of-Things device, by adapting the device to monitor its' own battery condition, and in response to detecting conditions indicating passivation of the battery, execute a refresh cycle to restore battery capacity. In this way, the battery can be refreshed by running a series of oxidation ‘burn off’ cycles periodically during the device's lifetime.

## Claims

### Claim 1

A method for maintaining a battery in an Internet-of-Things (IoT) device, the method comprising:
determining, by a processor of the IoT device, whether to perform battery maintenance;
in response to determining to perform battery maintenance, performing, by the processor of the IoT device, a pre-check process on the battery of the IoT device;
determining, by the processor of the IoT device, based on results of performing the pre-check process, whether battery passivation is occurring on the battery of the IoT device; and
in response to determining battery passivation is occurring on the IoT device, performing, by the processor of the IoT device, a de-passivation process on the battery of the IoT device.

### Claim 2 (depends on 1)

The method of claim 1, further comprising providing, by the processor of the IoT device, to a remote monitoring system, results of at least one of the pre-check process or the de-passivation process.

### Claim 3 (depends on 2)

The method of claim 2, further comprising receiving, by the processor of the IoT device, from the remote monitoring system, updated parameters for at least one of the pre-check process or the de-passivation process.

### Claim 4 (depends on 1)

The method of claim 1, wherein determining to perform battery maintenance comprises determining whether a predefined period of time has passed.

### Claim 5 (depends on 1)

The method of claim 1, wherein determining to perform battery maintenance comprises receiving, from a remote monitoring system, an instruction to perform battery maintenance.

### Claim 6 (depends on 1)

The method of claim 1, wherein performing the pre-check process on the battery of the IoT device comprises:
initiating a burn-off process on the battery by applying a known load to the battery for a predetermined period of time;
detecting a voltage drop on the battery during the burn-off process;
determining whether the voltage drop on the battery during the burn-off process remains within a set of predefined limits; and
in response to determining the voltage drop of the battery during the burn-off process does not remain within the set of predefined limits, providing a result indicating that battery passivation is occurring on the battery.

### Claim 7 (depends on 1)

The method of claim 1, wherein performing the de-passivation process comprises:
performing a burn-off process on the battery by applying a known load to the battery;
measuring battery voltage during the burn-off process;
determining whether the battery voltage remains greater than a predefined target voltage for a predefined period of time; and
in response to determining the battery voltage remains greater than the predefined target voltage for the predefined period of time for the burn-off process, ending the de-passivation process.

### Claim 8 (depends on 7)

The method of claim 7, wherein performing the de-passivation process further comprises:
in response to determining the battery voltage does not remain greater than the predefined target voltage for the predefined period of time for the burn-off process, further determining whether a pre-determined maximum number of de-passivation cycles have been performed; and
in response to determining the pre-determined maximum number of de-passivation cycles have been performed, ending the de-passivation process.

### Claim 9 (depends on 8)

The method of claim 8, wherein performing the de-passivation process further comprises:
in response to determining the pre-determined maximum number of de-passivation cycles have not yet been performed, pausing the burn-off process on the battery for a predetermined period of time.

### Claim 10 (depends on 9)

The method of claim 9, wherein performing the de-passivation process further comprises, after the predetermined period of time for pausing the burn-off process on the battery has expired, repeating the performing of the burn-off process on the battery and the measuring of the battery voltage during the burn-off process until determining the battery voltage remains greater than the predefined target voltage for the predefined period of time for the burn-off process or until determining the pre-determined maximum number of de-passivation cycles have been performed.

### Claim 11

An Internet-of-Things (IoT) device comprising:
a processor; and
a memory coupled with and readable by the processor and storing therein a set of instructions which, when executed by the processor, causes the processor to:
determining whether to perform battery maintenance;
in response to determining to perform battery maintenance, performing a pre-check process on the battery of the IoT device;
determining based on results of performing the pre-check process, whether battery passivation is occurring on the battery of the IoT device; and
in response to determining battery passivation is occurring on the IoT device, performing a de-passivation process on the battery of the IoT device.

### Claim 12 (depends on 11)

The IoT device of claim 11, further comprising providing, to a remote monitoring system, results of at least one of the pre-check process or the de-passivation process.

### Claim 13 (depends on 12)

The IoT device of claim 12, further comprising receiving, from the remote monitoring system, updated parameters for at least one of the pre-check process or the de-passivation process.

### Claim 14 (depends on 11)

The IoT device of claim 11, wherein determining to perform battery maintenance comprises determining whether a predefined period of time has passed.

### Claim 15 (depends on 11)

The IoT device of claim 11, wherein determining to perform battery maintenance comprises receiving, from a remote monitoring system, an instruction to perform battery maintenance.

### Claim 16 (depends on 11)

The IoT device of claim 11, wherein performing the pre-check process on the battery of the IoT device comprises:
initiating a burn-off process on the battery by applying a known load to the battery for a predetermined period of time;
detecting a voltage drop on the battery during the burn-off process;
determining whether the voltage drop on the battery during the burn-off process remains within a set of predefined limits; and
in response to determining the voltage drop of the battery during the burn-off process does not remain within the set of predefined limits, providing a result indicating that battery passivation is occurring on the battery.

### Claim 17 (depends on 11)

The IoT device of claim 11, wherein performing the de-passivation process comprises:
performing a burn-off process on the battery by applying a known load to the battery;
measuring battery voltage during the burn-off process;
determining whether the battery voltage remains greater than a predefined target voltage for a predefined period of time; and
in response to determining the battery voltage remains greater than the predefined target voltage for the predefined period of time for the burn-off process, ending the de-passivation process.

### Claim 18 (depends on 17)

The IoT device of claim 17, wherein performing the de-passivation process further comprises:
in response to determining the battery voltage does not remain greater than the predefined target voltage for the predefined period of time for the burn-off process, further determining whether a pre-determined maximum number of de-passivation cycles have been performed; and
in response to determining the pre-determined maximum number of de-passivation cycles have been performed, ending the de-passivation process.

### Claim 19 (depends on 18)

The IoT device of claim 18, wherein performing the de-passivation process further comprises:
in response to determining the pre-determined maximum number of de-passivation cycles have not yet been performed, pausing the burn-off process on the battery for a predetermined period of time.

### Claim 20 (depends on 19)

The IoT device of claim 19, wherein performing the de-passivation process further comprises, after the predetermined period of time for pausing the burn-off process on the battery has expired, repeating the performing of the burn-off process on the battery and the measuring of the battery voltage during the burn-off process until determining the battery voltage remains greater than the predefined target voltage for the predefined period of time for the burn-off process or until determining the pre-determined maximum number of de-passivation cycles have been performed.
