# US 2023/0418349 A1 · Input current limiting for redundant power supply loss on modular platforms

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0418349 A1
- Document ID: US20230418349A1
- Status: Published application
- Kind: A1
- Application number: 17/851,334
- Filed: 2022-06-28
- Published: 2023-12-28
- Earliest claimed: 2022-06-28
- Assignees: Dell Products L.P.
- Applicants: Dell Products L.P.
- Inventors: Craig A. Klein; Geoff A. Dillon; Alexander J. Hoganson
- Web page: https://patentgrep.com/patent/US20230418349A1

## CPC

- G06F 1/263: {Arrangements for using multiple switchable power supplies, e.g. battery and AC (G06F1/30 takes precedence)}
- G06F 1/28: Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
- G06F 1/30: Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations (for resetting only G06F1/24)
- G06F 11/2015: {Redundant power supplies (power supply failure G06F1/30)}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

An information handling system includes first and second power supplies, a chassis BMC, and a sled. The power supplies each assert a power good indication when the power supply is providing power on a power rail. The chassis BMC receives the power good indications and asserts a loss of redundancy indication when one of the power good indications is deasserted. The sled includes a sled BMC and a host processing system. The sled receives the loss of redundancy indication and in response, asserts a processor over temperature indication to the host processing system. When both power good indications are asserted, the chassis BMC directs the sled BMC to operate the host processing system in accordance with a normal operation sled current limit. When one of the power good indications is deasserted, the chassis BMC directs the sled BMC to operate the host processing system in accordance with a reduced power operation sled current limit. The reduced power operation sled current limit is a lower limit than the normal operation sled current limit.

## Claims

### Claim 1

An information handling system, comprising:
a first power supply unit configured to assert a first power good indication when the first power supply is providing power on a power rail of the information handling system;
a second power supply unit configured to assert a second power good indication when the second power supply is providing power on the power rail;
a chassis Baseboard Management Controller (BMC) configured to receive the first and second power good indications and to assert a loss of redundancy indication when one of the first and second power good indications is deasserted; and
a first sled including a first sled BMC and a first host processing system, the first sled configured to receive the loss of redundancy indication and to assert a first processor over temperature indication to the first host processing system in response to receiving the loss of redundancy indication;
wherein when both the first and second power good indications are asserted, the chassis BMC directs the first sled BMC to operate the first host processing system in accordance with a normal operation sled current limit; and
wherein when one of the first and second power good indications is deasserted, the chassis BMC directs the first sled BMC to operate the first host processing system in accordance with a reduced power operation sled current limit, the reduced power operation sled current limit being a lower limit than the normal operation sled current limit.

### Claim 2 (depends on 1)

The information handling system of claim 1, wherein the first sled BMC is configured to receive a first input current limit (ICL).

### Claim 3 (depends on 2)

The information handling system of claim 2, wherein the chassis BMC is further configured to receive the first ICL, and to calculate the normal operation sled current limit based upon the first ICL.

### Claim 4 (depends on 3)

The information handling system of claim 3, wherein the normal operation sled current limit is determined as:
CL−H=(ICL1−Overhead)/N, where CL−H is the normal operation sled current limit, ICL1 is the first ICL, Overhead is an amount of current associated with an overhead operation of the information handling system, and N is a number of sleds in the information handling system.

### Claim 5 (depends on 4)

The information handling system of claim 4, wherein the chassis BMC is further configured to receive a maximum output current for the first and second power supplies.

### Claim 6 (depends on 5)

The information handling system of claim 5, wherein the reduced power operation sled current limit is determined as:
CL−L=(PSMax−Overhead)/N. where CL−L is the reduced power operation sled current limit and PSMax is the maximum output current.

### Claim 7 (depends on 1)

The information handling system of claim 1, further comprising a second sled including a second sled BMC and a second host processing system, the second sled configured to receive the loss of redundancy indication and to assert a second processor over temperature indication to the second host processing system in response to receiving the loss of redundancy indication.

### Claim 8 (depends on 7)

The information handling system of claim 7, wherein the chassis BMC is further configured to provide the first ICL to the second sled BMC.

### Claim 9 (depends on 7)

The information handling system of claim 7, wherein the second sled BMC is configured to receive a second ICL.

### Claim 10 (depends on 9)

The information handling system of claim 9, wherein the chassis BMC is further configured to determine that the first ICL is different from the second ICL, to select the second ICL, and to provide the second ICL to the first sled BMC.

### Claim 11

A method, comprising:
asserting, by a first power supply of an information handling system, a first power good indication when the first power supply is providing power on a power rail of the information handling system;
asserting, by a second power supply unit of the information handling system, a second power good indication when the second power supply is providing power on the power rail;
receiving, by a chassis Baseboard Management Controller (BMC) of the information handling system, the first and second power good indications;
asserting, by the chassis BMC, a loss of redundancy indication when one of the first and second power good indications is deasserted; and
receiving, by a first sled of the information handling system, the loss of redundancy indication;
asserting, by the first sled, a first processor over temperature indication to a first host processing system of the first sled in response to receiving the loss of redundancy indication;
determining, by the chassis BMC, that both the first and second power good indications are asserted;
directing, by the chassis BMC, a first sled BMC of the first sled to operate the first host processing system in accordance with a normal operation sled current limit when both the first and second power good indications are asserted;
determining, by the chassis BMC, that one of the first and second power good indications is deasserted; and
directing, by the chassis BMC, the first sled BMC to operate the first host processing system in accordance with a reduced power operation sled current limit when one of the first and second power good indications is deasserted, the reduced power operation sled current limit being a lower limit than the normal operation sled current limit.

### Claim 12 (depends on 11)

The method of claim 11, further comprising receiving, by the first sled BMC, a first input current limit (ICL).

### Claim 13 (depends on 12)

The method of claim 12, further comprising:
receiving, by the chassis BMC, the first ICL; and
calculating the normal operation sled current limit based upon the first ICL.

### Claim 14 (depends on 13)

The method of claim 13, wherein the normal operation sled current limit is determined as:
CL−H=(ICL1−Overhead)/N, where CL−H is the normal operation sled current limit, ICL1 is the first ICL, Overhead is an amount of current associated with an overhead operation of the information handling system, and N is a number of sleds in the information handling system.

### Claim 15 (depends on 14)

The method of claim 14, further comprising receiving, by the chassis BMC, a maximum output current for the first and second power supplies.

### Claim 16 (depends on 5)

The method of claim 5, wherein the reduced power operation sled current limit is determined as:
CL−L=(PSMax−Overhead)/N. where CL−L is the reduced power operation sled current limit and PSMax is the maximum output current.

### Claim 17 (depends on 11)

The method of claim 11, further comprising:
receiving, by a second sled of the information handling system, the loss of redundancy indication; and
asserting, by the second sled, a second processor over temperature indication to a second host processing system of the second sled in response to receiving the loss of redundancy indication.

### Claim 18 (depends on 17)

The method of claim 17, further comprising providing, by the chassis BMC, the first ICL to the second sled BMC.

### Claim 19 (depends on 17)

The method of claim 17, further comprising:
receiving, by a second sled BMC of the second sled, a second ICL;
determining, by the chassis BMC. that the first ICL is different from the second ICL;
selecting the second ICL; and
providing the second ICL to the first sled BMC.

### Claim 20

An information handling system, comprising:
a first power supply unit configured to assert a first power good indication when the first power supply is providing power on a power rail of the information handling system;
a second power supply unit configured to assert a second power good indication when the second power supply is providing power on the power rail;
a chassis Baseboard Management Controller (BMC) configured to receive the first and second power good indications and to assert a loss of redundancy indication when one of the first and second power good indications is deasserted; and
a sled including a sled BMC, a host processing system, and a Complex Programmable Logic Device (CPLD), wherein the CPLD is configured to receive the loss of redundancy indication and to assert a first processor over temperature indication to the first host processing system in response to receiving the loss of redundancy indication;
wherein when both the first and second power good indications are asserted, the chassis BMC directs the sled BMC to operate the host processing system in accordance with a normal operation sled current limit, and when one of the first and second power good indications is deasserted, the chassis BMC directs the sled BMC to operate the host processing system in accordance with a reduced power operation sled current limit, the reduced power operation sled current limit being a lower limit than the normal operation sled current limit.