# US 2023/0411966 A1 · A method for improved power ramping in a hybrid power plant

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0411966 A1
- Document ID: US20230411966A1
- Status: Published application
- Kind: A1
- Application number: 17/914,704
- Filed: 2021-03-05
- Published: 2023-12-21
- Earliest claimed: 2020-03-26
- Assignees: Vestas Wind Systems A/S
- Applicants: Vestas Wind Systems A/S
- Inventors: Mads Rajczyk Skjelmose; Henrik Møller; Kouroush Nayebi
- Web page: https://patentgrep.com/patent/US20230411966A1

## CPC

- H02J 3/46: Controlling the sharing of generated power between the generators, sources or networks
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 3/381: {Dispersed generators}
- H02J 3/48: Controlling the sharing of active power
- H02J 2101/24: Photovoltaics
- H02J 2101/28: Wind energy
- H02J 2101/40: Hybrid power plants, i.e. a plurality of different generation technologies being operated at one power plant
- Y02E 10/56: Power conversion systems, e.g. maximum power point trackers
- Y02E 10/76: Power conversion electric or electronic aspects
- Y02E 70/30: Systems combining energy storage with energy generation of non-fossil origin
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

The invention relates to a method for providing power ramp rate (RR) control of a hybrid power plant (100) with a plurality of energy assets (EA1, EA2, EA3) including wind turbine generators (WTG1, WTG2, WTG3) and possibly solar power units (PV1, PV2, PV3, 102), and an energy storage unit (ESU), Each energy asset has a ramp rate capability (RRC_i) defined as the highest possible ramp rate at a given time, and the method includes receiving from each energy asset the corresponding ramp rate capability, and taking into account the plurality of ramp rate capabilities from the energy assets when calculating the power setpoint (Pset_i) to each energy asset, so as to improve the power ramp rate (RR) control of the hybrid power plant (100).

## Claims

### Claim 1

A method for providing power ramp rate control of a hybrid power plant, the hybrid power plant being connected to an electrical grid, the hybrid power plant comprising a plurality of energy assets comprising:
a plurality of first energy assets, wherein the first energy assets comprise a wind turbine generator;
at least one second energy asset, the second energy asset being different from a wind turbine generator, preferably said second energy asset comprise a solar power unit, and
at least one third energy asset comprises an energy storage unit, preferably a battery energy storage system,
wherein the hybrid power plant further comprises a power plant controller arranged to communicate with said plurality of energy assets, the power plant controller being arranged to receive a power reference defining a power to be delivered to the electrical grid and calculating therefrom, and dispatching, a power setpoint to each energy asset, each energy asset having an individual ramp rate which adds to a power ramp rate of the hybrid power plant;
wherein each energy asset further has a ramp rate capability defined as the highest possible ramp rate at a given time; and
wherein the power plant controller is arranged for:
receiving from each energy asset the corresponding ramp rate capability; and
taking into account the plurality of ramp rate capabilities from the energy assets when calculating the power setpoint to each energy asset, so as to improve the power ramp rate control of the hybrid power plant.

### Claim 2 (depends on 1)

The method of claim 1, wherein the power plant controller (PPC, 120) is taking into account the available power from each of the energy assets when calculating the power setpoint to each energy assets so as to improve the power ramp rate control of the hybrid power plant.

### Claim 3 (depends on 1)

The method of claim 1, wherein the power plant controller has a desired power ramp rate to be delivered to the electrical grid, the power plant controller further performing a comparison between the desired power ramp rate to be delivered and the present ramp rate from the hybrid power plant, said comparison being also applied when taking into account said ramp rate capability of each energy assets and for calculating the power setpoint to each energy asset.

### Claim 4 (depends on 3)

The method of claim 3, wherein the power plant controller has said desired power ramp rate to be delivered to the electrical grid, said desired power ramp rate comprises a measure indicative of:
a minimum value of the desired power ramp rate;
a maximum value of the desired power ramp rate; and/or
an interval of the desired power ramp rate.

### Claim 5 (depends on 3)

The method of claim 3, wherein the power plant controller takes the plurality of ramp rate capabilities from the energy assets into account by compensating:
a first sub-group of energy assets delivering power with no, or insufficient, ramp rate capability in relation to the desired power ramp rate;
with a second sub-group of energy assets having an excess ramp rate capability in relation to the desired power ramp rate.
when calculating the power setpoint to each energy asset.

### Claim 6 (depends on 5)

The method of claim 5, wherein the power setpoint (Pset_i) to the second sub-group of energy assets is calculated according to pre-defined prioritizing distribution scheme, or a proportional distribution scheme according to the ramp rate capability for each energy asset with excess ramp rate capability.

### Claim 7 (depends on 1)

The method of claim 1, wherein the power plant controller is further:
receiving from each energy asset a signal regarding a limit of the energy asset being approached, said limit being related to:
the ability to produce and/or absorb power;
changing power output with a desired ramp rate; and/or
a stable power output of the hybrid power plant; and
taking into account the plurality of said limits from the energy assets when calculating the power setpoint for each energy asset.

### Claim 8 (depends on 7)

The method of claim 7, wherein the power plant controller is further estimating, or predicting, a limit time when said limit is reached for each energy asset, and taking said limit time into account when calculating the power setpoint for each energy asset.

### Claim 9 (depends on 5, 7)

The method of claim 7, when dependent on claim 5, wherein the power plant controller is further compensating:
said first sub-group of energy assets before they reach their respective limits with
said second sub-group of energy assets having excess ramp rate capability when calculating the power setpoint to each energy asset,
and thereby improving the power ramp rate control of the hybrid power plant.

### Claim 10 (depends on 7)

The method of claim 7, wherein the power plant controller is compensating said first sub-group of energy assets before they reach their respective limits with said second sub-group of energy assets by gradually reducing the power output from said first sub-group of energy assets, and gradually increasing the power output from said second sub-group of energy assets, preferably the compensating is performed before said limit time is reached in a substantially continuous manner and/or in balanced manner between the said first and said second sub-group of energy assets so as to ensure a continuous ramp rate for the hybrid power plant to the extent required by a grid code of said electric grid.

### Claim 11 (depends on 7)

The method of claim 7, wherein the limit of the energy asset being approached is an inherent limit of the energy asset being substantially independent of external parameters or conditions, preferably the limit being related to the maximum energy storage capacity of the energy storage unit and/or a maximum power production capacity of the first and/or second energy assets.

### Claim 12 (depends on 7)

The method of claim 7, wherein the limit of the energy asset being approached is an external limit of the energy asset related to predicted or expected power production from said plurality of first energy assets and/or the second energy assets, preferably predicted from weather forecasts, more preferably local weather forecast or predictions for the location of the hybrid power plant.

### Claim 13

A hybrid power plant connected to an associated electrical grid for producing power to said electrical grid, the hybrid power plant comprising a plurality of energy assets comprising:
a plurality of first energy assets, wherein the first energy assets comprise a wind turbine generator;
at least one second energy asset, the second energy asset being different from a wind turbine generator, preferably said second energy asset comprise a solar power unit; and
at least one third energy asset comprises an energy storage unit, preferably a battery energy storage system,
wherein the hybrid power plant further comprises a power plant controller arranged to communicate with said plurality of energy assets, the power plant controller being arranged to receive a power reference defining a power to be delivered to the electrical grid and calculating therefrom, and dispatching, a power setpoint to each energy asset, each energy asset having an individual ramp rate which adds to a power ramp rate of the hybrid power plant;
wherein each energy asset further has a ramp rate capability defined as the highest possible ramp rate at a given time; and
wherein the power plant controller is arranged for:
receiving from each energy asset the corresponding ramp rate capability; and
taking into account the plurality of ramp rate capabilities from the energy assets when calculating the power setpoint to each energy asset, so as to improve the power ramp rate control of the hybrid power plant.

### Claim 14

A power plant controller for controlling an associated hybrid power plant connected to an associated electrical grid, the hybrid power plant being connected to an electrical grid, the hybrid power plant comprising a plurality of energy assets comprising:
a plurality of first energy assets, wherein the first energy asset comprise a wind turbine generator;
at least one second energy asset, the second energy asset being different from a wind turbine generator, preferably said second energy asset comprise a solar power unit; and
at least one third energy asset comprises an energy storage unit, preferably a battery energy storage system,
the power plant controller being arranged to communicate with said plurality of energy assets, the power plant controller being arranged to receive a power reference defining a power to be delivered to the electrical grid and calculating therefrom, and dispatching, a power setpoint to each energy asset, each energy asset having an individual ramp rate which adds to a power ramp rate of the hybrid power plant, wherein each energy asset further has a ramp rate capability defined as the highest possible ramp rate at a given time, and
wherein the power plant controller is arranged for:
receiving from each energy asset the corresponding ramp rate capability; and
taking into account the plurality of ramp rate capabilities from the energy assets when calculating the power setpoint to each energy asset, so as to improve the power ramp rate control of the hybrid power plant.

### Claim 15

(canceled)

### Claim 16

A computer program product which, when executed, configures a computer system having data storage to perform an operation for providing power ramp rate control of a hybrid power plant, the hybrid power plant being connected to an electrical grid and comprising a plurality of energy assets, including: a plurality of first energy assets including a wind turbine generator; at least one second energy asset exclusive of a wind turbine generator; and at least one third energy asset comprising an energy storage unit; and wherein the operation, comprises:
receiving a power reference defining a power to be delivered to the electrical grid;
calculating from the power reference, and dispatching, a power setpoint to each energy asset, each energy asset having an individual ramp rate which adds to a power ramp rate of the hybrid power plant; wherein each energy asset further has a ramp rate capability defined as the highest possible ramp rate at a given time;
receiving from each energy asset the corresponding ramp rate capability; and
taking into account the plurality of ramp rate capabilities from the energy assets when calculating the power setpoint to each energy asset, so as to improve the power ramp rate control of the hybrid power plant.

### Claim 17 (depends on 16)

The computer program product of claim 16, wherein the second energy asset comprises a solar power unit.

### Claim 18 (depends on 16)

The computer program product of claim 16, wherein the third energy asset comprises a battery energy storage system.