# US 2023/0411961 A1 · Method for implementing fast power response and new energy power plant

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0411961 A1
- Document ID: US20230411961A1
- Status: Published application
- Kind: A1
- Application number: 18/240,449
- Filed: 2023-08-31
- Published: 2023-12-21
- Earliest claimed: 2021-03-02
- Assignees: Huawei Digital Power Technologies Co., Ltd.
- Applicants: Huawei Digital Power Technologies Co., Ltd.
- Inventors: Shuchao WANG; Yanbai SHEN; Yanzhong ZHANG
- Web page: https://patentgrep.com/patent/US20230411961A1

## CPC

- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/381: {Dispersed generators}
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 3/48: Controlling the sharing of active power
- H02J 3/50: Controlling the sharing of reactive power
- H02J 13/1321: {using a wired telecommunication network or a data transmission bus}
- H02J 2101/24: Photovoltaics
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

This application discloses a method for implementing a fast power response and a power plant. The method is applied to a power plant-end power control apparatus, and includes determining a whole-plant reactive power target value and/or a whole-plant active power target value of the power plant. The method also includes determining, based on the whole-plant reactive power target value and/or the whole-plant active power target value, a second power control instruction readable to each photovoltaic inverter or power conversion system in the power plant. The method further includes delivering, through a subarray controller or a subarray communication device over an Ethernet network and/or a field bus network, the second power control instruction to each photovoltaic inverter or power conversion system indicated by address identifier information carried in the second power control instruction, so that each photovoltaic inverter or power conversion system makes a fast power response based on the second power control instruction.

## Claims

### Claim 1

A method for implementing a fast power response, applied to a power plant-end power control apparatus in a new energy power plant, wherein the power plant comprises at least two subarrays, each of the subarrays comprising a power control instruction processing and forwarding apparatus and at least three power control instruction execution apparatuses, wherein the method comprises:
determining at least one of a whole-plant reactive power target value or a whole-plant active power target value of the power plant based on a first power control instruction delivered by an upper-level system or an acquired voltage analog signal and current analog signal of a grid-tied point of the power plant at a current moment;
determining, based on at least one of the whole-plant reactive power target value or the whole-plant active power target value, a second power control instruction readable to each power control instruction execution apparatus in each subarray in the power plant, wherein the second power control instruction indicates a power target value of each power control instruction execution apparatus existing when at least one of the whole-plant reactive power target value or the whole-plant active power target value is reached; and
transparently transmitting the second power control instruction to each power control instruction execution apparatus through the respective power control instruction processing and forwarding apparatus in each subarray in the power plant, so that each power control instruction execution apparatus makes a power response based on the second power control instruction.

### Claim 2 (depends on 1)

The method according to claim 1, wherein determining a whole-plant reactive power target value of the power plant based on a first power control instruction delivered by an upper-level system or an acquired voltage analog signal of a grid-tied point of the power plant at a current moment comprises:
if the first power control instruction delivered by the upper-level system comprises the whole-plant reactive power target value, determining the whole-plant reactive power target value of the power plant based on the first power control instruction; or
acquiring the voltage analog signal of the grid-tied point of the power plant at the current moment, and processing the voltage analog signal of the grid-tied point at the current moment based on an instantaneous voltage amplitude calculation algorithm, to determine an instantaneous voltage amplitude of the grid-tied point at the current moment; and determining the whole-plant reactive power target value of the power plant based on the instantaneous voltage amplitude of the grid-tied point at the current moment.

### Claim 3 (depends on 1)

The method according to claim 1, wherein determining a whole-plant active power target value of the power plant based on a first power control instruction delivered by an upper-level system or an acquired voltage analog signal and current analog signal of a grid-tied point of the power plant at a current moment comprises:
if the first power control instruction delivered by the upper-level system comprises the whole-plant active power target value, determining the whole-plant active power target value of the power plant based on the first power control instruction; or
acquiring the voltage analog signal and the current analog signal of the grid-tied point of the power plant at the current moment, processing the voltage analog signal and the current analog signal of the grid-tied point at the current moment based on an instantaneous amplitude calculation algorithm, to determine instantaneous active power and an instantaneous voltage amplitude of the grid-tied point at the current moment, and determining a frequency value based on the instantaneous voltage amplitude; and determining the whole-plant active power target value of the power plant based on the instantaneous active power at the current moment and the frequency value.

### Claim 4 (depends on 1)

The method according to claim 1, wherein:
the power target value of each power control instruction execution apparatus is a power target absolute value, a power target percentage value, a variation absolute value, or a variation percentage value,
the power target percentage value is a percentage value between the power target absolute value and rated power of the power control instruction execution apparatus,
the variation absolute value is an absolute difference between the power target absolute value and power of the power control instruction execution apparatus at the current moment, and
the variation percentage value is a percentage value between the variation absolute value and the rated power of the power control instruction execution apparatus.

### Claim 5 (depends on 1)

The method according to claim 1, wherein the second power control instruction carries address identifier information of each power control instruction execution apparatus, and the address identifier information comprises at least one of an internet protocol (IP) address, a unicast media access control (MAC) address, a multicast or broadcast MAC address, or a character string corresponding to a target power control instruction execution apparatus.

### Claim 6 (depends on 1)

The method according to claim 1, wherein transparently transmitting the second power control instruction to each power control instruction execution apparatus through the respective power control instruction processing and forwarding apparatus in each subarray in the power plant comprises:
delivering the second power control instruction to the respective power control instruction processing and forwarding apparatus in each subarray in the power plant, so that the power control instruction processing and forwarding apparatus directly delivers, through a communication network chip, the second power control instruction to a target power control instruction execution apparatus in the subarray corresponding to the power control instruction processing and forwarding apparatus, wherein the target power control instruction execution apparatus is a power control instruction execution apparatus indicated by address identifier information carried in the second power control instruction.

### Claim 7 (depends on 1)

The method according to claim 1, wherein:
the power control instruction processing and forwarding apparatus comprises a subarray controller or a subarray communication device;
the subarray controller is a device that is installed in the subarray and that matches a step-up transformer in the subarray, and the subarray controller is any one or more of a subarray data acquisition apparatus, an all-in-one smart box-type transformer measurement and control apparatus, a communication management apparatus, or a protocol conversion apparatus;
the subarray communication device is any one or more of a network switch, a gateway machine, an optical fiber repeater, a bus repeater, or a bus extension apparatus; and
the power control instruction execution apparatus comprises a photovoltaic inverter or a power conversion system.

### Claim 8 (depends on 1)

The method according to claim 1, wherein at least one of Ethernet network communication or field bus network communication is performed between the power plant-end power control apparatus and each power control instruction execution apparatus;
the Ethernet network communication is any one of generic object oriented substation event GOOSE communication or user datagram protocol (UDP) communication; and
the field bus network communication is any one of controller area network (CAN) communication, Ethernet for control automation technology (EtherCAT) communication, or open source real-time communication technology Ethernet Powerlink communication.

### Claim 9 (depends on 1)

The method according to claim 1, wherein before determining the whole-plant reactive power target value or the whole-plant active power target value of the power plant, the method further comprises:
acquiring the voltage analog signal of the grid-tied point of the power plant at the current moment, processing the voltage analog signal of the grid-tied point at the current moment based on an instantaneous voltage amplitude calculation algorithm, to determine an instantaneous voltage amplitude of the grid-tied point at the current moment, and determining a frequency value based on the instantaneous voltage amplitude;
determining at least one of whole-plant reactive power or whole-plant active power of the power plant at the current moment based on the instantaneous voltage amplitude of the grid-tied point at the current moment and the frequency value; and
determining whether at least one of the whole-plant reactive power or the whole-plant active power of the power plant at the current moment falls outside a preset interval.

### Claim 10

A new energy power plant, comprising:
a power plant-end power control apparatus and at least two subarrays, wherein each of the subarrays comprises a power control instruction processing and forwarding apparatus and at least three power control instruction execution apparatuses, wherein:
the power plant-end power control apparatus is configured to determine at least one of a whole-plant reactive power target value or a whole-plant active power target value of the power plant based on a first power control instruction delivered by an upper-level system or an acquired voltage analog signal and current analog signal of a grid-tied point of the power plant at a current moment;
the power plant-end power control apparatus is further configured to: determine, based on the at least one of the whole-plant reactive power target value or the whole-plant active power target value, a second power control instruction readable to each power control instruction execution apparatus in each subarray in the power plant, and deliver the second power control instruction to the respective power control instruction processing and forwarding apparatus in each subarray in the power plant, wherein the second power control instruction indicates a power target value of each power control instruction execution apparatus existing when the at least one of the whole-plant reactive power target value or the whole-plant active power target value are/is reached;
the respective power control instruction processing and forwarding apparatus in each subarray in the power plant is configured to transparently transmit the second power control instruction to each power control instruction execution apparatus; and
each power control instruction execution apparatus is configured to make a power response based on the second power control instruction.

### Claim 11 (depends on 10)

The power plant according to claim 10, wherein when determining the whole-plant reactive power target value of the power plant based on the first power control instruction delivered by the upper-level system or the acquired voltage analog signal of the grid-tied point of the power plant at the current moment, the power plant-end power control apparatus is configured to:
if the first power control instruction delivered by the upper-level system comprises the whole-plant reactive power target value, determine the whole-plant reactive power target value of the power plant based on the first power control instruction; or
acquire the voltage analog signal of the grid-tied point of the power plant at the current moment, and process the voltage analog signal of the grid-tied point at the current moment based on an instantaneous voltage amplitude calculation algorithm, to determine an instantaneous voltage amplitude of the grid-tied point at the current moment s and determine the whole-plant reactive power target value of the power plant based on the instantaneous voltage amplitude of the grid-tied point at the current moment.

### Claim 12 (depends on 10)

The power plant according to claim 10, wherein when determining the whole-plant active power target value of the power plant based on the first power control instruction delivered by the upper-level system or the acquired voltage analog signal and current analog signal of the grid-tied point of the power plant at the current moment, the power plant-end power control apparatus is configured to:
if the first power control instruction delivered by the upper-level system comprises the whole-plant active power target value, determine the whole-plant active power target value of the power plant based on the first power control instruction; or
acquire the voltage analog signal and the current analog signal of the grid-tied point of the power plant at the current moment, process the voltage analog signal and the current analog signal of the grid-tied point at the current moment based on an instantaneous amplitude calculation algorithm, to determine instantaneous active power and an instantaneous voltage amplitude of the grid-tied point at the current moment, and determine a frequency value based on the instantaneous voltage amplitude, and determine the whole-plant active power target value of the power plant based on the instantaneous active power at the current moment and the frequency value.

### Claim 13 (depends on 10)

The power plant according to claim 10, wherein:
the power target value of each power control instruction execution apparatus is a power target absolute value, a power target percentage value, a variation absolute value, or a variation percentage value,
the power target percentage value is a percentage value between the power target absolute value and rated power of the power control instruction execution apparatus,
the variation absolute value is an absolute difference between the power target absolute value and power of the power control instruction execution apparatus at the current moment, and
the variation percentage value is a percentage value between the variation absolute value and the rated power of the power control instruction execution apparatus.

### Claim 14 (depends on 10)

The power plant according to claim 10, wherein the second power control instruction carries address identifier information of each power control instruction execution apparatus, and the address identifier information comprises at least one of an internet protocol (IP) address, a unicast media access control (MAC) address, a multicast or broadcast MAC address, and a character string corresponding to a target power control instruction execution apparatus.

### Claim 15 (depends on 10)

The power plant according to claim 10, wherein when transparently transmitting the second power control instruction to each power control instruction execution apparatus, the respective power control instruction processing and forwarding apparatus in each subarray in the power plant is configured to:
deliver, through a communication network chip, the second power control instruction to a target power control instruction execution apparatus in the subarray corresponding to the power control instruction processing and forwarding apparatus, wherein the target power control instruction execution apparatus is a power control instruction execution apparatus indicated by address identifier information carried in the second power control instruction.

### Claim 16 (depends on 10)

The power plant according to claim 10, wherein:
the power control instruction processing and forwarding apparatus comprises a subarray controller or a subarray communication device;
the subarray controller is a device that is installed in the subarray and that matches a step-up transformer in the subarray, and the subarray controller is any one or more of a subarray data acquisition apparatus, an all-in-one smart box-type transformer measurement and control apparatus, a communication management apparatus, or a protocol conversion apparatus;
the subarray communication device is any one or more of a network switch, a gateway machine, an optical fiber repeater, a bus repeater, or a bus extension apparatus; and
the power control instruction execution apparatus comprises a photovoltaic inverter or a power conversion system.

### Claim 17 (depends on 10)

The power plant according to claim 10 operable such that at least one of Ethernet network communication or field bus network communication is performed between the power plant-end power control apparatus and each power control instruction execution apparatus; wherein:
the Ethernet network communication is any one of generic object oriented substation event GOOSE communication or user datagram protocol (UDP) communication; and
the field bus network communication is any one of controller area network (CAN) communication, Ethernet for control automation technology (EtherCAT) communication, or open source real-time communication technology Ethernet Powerlink communication.

### Claim 18 (depends on 10)

The power plant according to claim 10, wherein the power plant-end power control apparatus is further configured to:
acquire the voltage analog signal of the grid-tied point of the power plant at the current moment, process the voltage analog signal of the grid-tied point at the current moment based on an instantaneous voltage amplitude calculation algorithm, to determine an instantaneous voltage amplitude of the grid-tied point at the current moment, and determine a frequency value based on the instantaneous voltage amplitude;
determine at least one of whole-plant reactive power or whole-plant active power of the power plant at the current moment based on the instantaneous voltage amplitude of the grid-tied point at the current moment and the frequency value; and
determine whether at least one of the whole-plant reactive power or the whole-plant active power of the power plant at the current moment falls outside a preset interval.