# US 2023/0411952 A1 · Devices for monitoring and protecting power circuits

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0411952 A1
- Document ID: US20230411952A1
- Status: Published application
- Kind: A1
- Application number: 18/036,071
- Filed: 2021-11-05
- Published: 2023-12-21
- Earliest claimed: 2020-11-09
- Assignees: Safran Electrical & Power
- Applicants: Safran Electrical & Power
- Inventors: Vincent CHAPERON; Damien ELMAALOUF
- Web page: https://patentgrep.com/patent/US20230411952A1

## CPC

- H02H 3/347: using summation current transformers
- H02H 3/335: {the main function being self testing of the device}
- H02H: EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS (indicating or signalling undesired working conditions G01R, e.g. G01R31/00, G08B; locating faults along lines G01R31/08; emergency protective devices H01H)

## Abstract

A device for monitoring and protecting equipment powered by at least one solid-state power controller (SSPC) including at least one current measurement circuit having a current measuring transformer receiving at a primary at least three phases of a three-phase power supply of the equipment, a measuring and testing module including a controller for measuring a current at a secondary Im, representative of a differential current Id at the primary, and a channel for injecting current into said transformer, the channel having a current Iinj generator controlled by an output of the controller and connected to an injection winding on the transformer, the injection winding including a number of turns Nin so that the current Iinj produces in said measurement windings a test current Im of said secondary in the absence of current at the primary.

## Claims

### Claim 1

A device for monitoring and protecting equipment powered by at least one solid-state power controller called SSPC (5, 6, 7), said device including at least one current measurement circuit comprising:
a current measuring transformer (8) receiving at a primary at least three phases (1, 2, 3) of a three-phase power supply of the equipment or the phase and the neutral of a single-phase power supply of the equipment and provided at a secondary with at least two windings (13, 14) for measuring the current at the primary,
a measuring and testing module (9) including a measuring and testing controller (9a) provided with at least one analog input (10a, 11a) connected to at least one of said measurement windings (13, 14) by a measurement channel (10, 11) for measuring a current at the secondary Im, representative of a differential current Id at the primary and provided with a measurement program and a digital channel (16) for communication with said SSPC for controlling a switch of said SSPC in the event that said current Id exceeds a given threshold;
wherein said module (9) includes a channel for injecting current into said transformer, said channel comprising a current Iinj generator controlled by an output of the measuring and testing controller (9a) and connected to an injection winding (15) on said transformer, said injection winding including a number of turns Ninj adapted so that the current Iinj produces in said measurement windings (13, 14) a test current Im of said secondary in the absence of current at the primary and said module (9) includes a test program adapted to control a current injection in parallel with a current measurement;
and wherein said two measurement windings (13, 14) at the secondary are such that a first measurement winding (13) is adapted for a measurement of a leakage current at the primary in a range 0 to 100 milliamps and a second measurement winding (14) is adapted for a measurement of a leakage current at the primary in a range of 0 to 2 amps.

### Claim 2 (depends on 1)

The device according to claim 1, wherein the device includes three SSPC modules, the transformer receiving the three phases of a three-phase power supply derived from said three SSPC modules and the neutral of the equipment, said current at the primary Id is a vector sum of the currents of said three phases and of the neutral and wherein said controller is programmed to proceed with one or more current measurement(s) by means of the first measurement winding and order the switching off of the switches of said three SSPC modules on detection of a current IdB at the primary representative of a threshold called low-level GFI threshold in the range of 20 milliamps to 40 milliamps.

### Claim 3 (depends on 1)

The device according to claim 1, wherein the device includes three SSPC modules, the transformer is designed to receive the three phases derived from said three SSPC modules and the neutral of a three-phase power supply of the equipment, said primary current Id being the vector sum of the currents of said three phases and of the neutral, said controller is programmed to proceed with a serial connection of said first measurement winding and second measurement winding, carry out one or more current measurement(s) by means of the first measurement winding and the second measurement winding in series and order the switching off of the switches of said three SSPC modules on detection of a current IdB at the primary representative of a threshold called low-level GFI threshold in the range of 20 milliamps to 40 milliamps.

### Claim 4 (depends on 1)

The device according to claim 1, wherein the device includes three SSPC modules, the transformer is designed to receive the three phases of a three-phase power supply of the equipment derived from said three SSPC modules with or without the neutral, said primary current Id is the vector sum of the currents of said three phases and wherein said controller is programmed to proceed with one or more current measurement(s) by means of the second measurement winding and order the switching off of the switches of said three SSPC modules on detection of a current IdH at the primary higher than a so-called high-level GFI threshold in the range of 1 amp to 2 amps.

### Claim 5 (depends on 1)

The device according to claim 1, wherein the device includes an SSPC module, the transformer is designed to receive the phase and the neutral of a single-phase power supply of the equipment, wherein said current at the primary Id is the difference between the phase current and the neutral current and wherein said controller is either programmed to proceed with one or more current measurement(s) by means of the first measurement winding and order the switching off of the switches of the SSPC on detection of a current IdB at the primary representative of a so-called low-level GFI threshold in the range of 20 milliamps to 40 milliamps or programmed to proceed with one or more current measurement(s) by means of the second measurement winding, or of the first and second measurement winding(s) connected in series, and order the switching off of the switch of the SSPC module on detection of a current IdH at the primary higher than a so-called high-level GFI threshold in the range of 1 amp to 2 amps.

### Claim 6 (depends on 1)

The device according to claim 1, wherein the current generator is configured to inject an alternating current with a frequency of ten to fifty times higher than the frequency of the current controlled by the SSPC(s).

### Claim 7 (depends on 1)

A method for measuring current by means of the device of according to claim 1, comprising a self-test sequence for which at least one injection of current representative of one or more given primary current threshold(s) on said injection winding, for which a measurement of the currents at each of said first measurement winding and second measurement winding is carried out and in that the measuring and testing module emits an order for switching off the switches of the SSPC module(s) in case of non-detection of a measurement current on at least either one of said first measurement winding and second measurement winding during said current injection.

### Claim 8 (depends on 7)

The method according to claim 7, further comprising, after the self-test sequence, successive current measurement sequences and the emission by the measuring and testing module of an order for switching off the switches of the SSPC modules if the current differential of the 3 phases supplied by the 3 channels of the SSPC modules and the neutral return is higher than a 30 mA threshold during two successive current measurements or if the sum of the currents of the 3 supply phases is non-zero and higher than a defined current level for a defined minimum period.

### Claim 9 (depends on 7)

The method according to claim 7, further comprising, after a self-test sequence, successive current measurement sequences and the emission by the measuring and testing module of an order for switching off the switches of the SSPC modules if the current differential between the phase and the neutral is higher than a defined threshold for two successive current measurements or for a defined minimum period.