# US 2023/0411645 A1 · Method for producing a membrane-electrode assembly

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0411645 A1
- Document ID: US20230411645A1
- Status: Published application
- Kind: A1
- Application number: 18/252,084
- Filed: 2021-11-12
- Published: 2023-12-21
- Earliest claimed: 2020-11-18
- Assignees: Robert Bosch GmbH
- Applicants: Robert Bosch GmbH
- Inventors: Andy Gottschalk; Robert Landvogt; Andreas Gehrold
- Web page: https://patentgrep.com/patent/US20230411645A1

## CPC

- H01M 8/0273: with sealing or supporting means in the form of a frame
- H01M 8/1004: characterised by membrane-electrode assemblies [MEA] (H01M8/12 takes precedence)
- H01M 8/2404: Processes or apparatus for grouping fuel cells
- H01M 8/242: comprising framed electrodes or intermediary frame-like gaskets (H01M8/2425, H01M8/244 take precedence)
- H01M 2008/1095: {Fuel cells with polymeric electrolytes}
- Y02E 60/50: Fuel cells
- Y02P 70/50: Manufacturing or production processes characterised by the final manufactured product
- H01M: PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A method for producing membrane-electrode assemblies (6) for a fuel cell unit (1) as a fuel cell stack (1), comprising the following steps: providing in each case one proton exchange membrane (5), providing in each case one first subgasket (53) as sealing layer (41), providing in each case one second subgasket (54) as sealing layer (41), arranging the in each case one proton exchange membrane (5) between the in each case first and in each case second subgasket (53, 54), connecting the in each case one proton exchange membrane (5) to the in each case first and/or in each case second subgasket (53, 54), such that in each case one layered inner region (38) of the in each case one proton exchange membrane (5) is enclosed by the in each case one first and second subgasket (53, 54) as sealing layers (41), wherein the proton exchange membranes (5), the first subgaskets (53), and the second subgaskets (54) are provided in that they are removed as proton exchange membrane strip (65), first subgasket strip (63), and second subgasket strip (64) from storage devices (58, 59, 60) and the arrangement of the proton exchange membranes (5) between the first and second subgaskets (53, 54) and the connection of the proton exchange membranes (5) to the first and/or second subgaskets (53, 54) are configured in the state of the first subgaskets (53) as first subgasket strip (63) and of the second subgasket (54) as second subgasket strip (64), such that, during the arrangement and connection, the first subgaskets (53) are arranged connected to one another on the first subgasket strip (63) and the second subgaskets (54) are arranged connected to one another on the second subgasket strip (64).

## Claims

### Claim 1

A method for producing membrane-electrode assemblies (6) for a fuel cell unit (1) as a fuel cell stack (1), comprising the following steps:
providing in each case one proton exchange membrane (5),
providing in each case one first subgasket (53) as a sealing layer (41),
providing in each case one second subgasket (54) as a sealing layer (41),
arranging the in each case one proton exchange membrane (5) between the in each case first and in each case second subgasket (53, 54),
connecting the in each case one proton exchange membrane (5) to the in each case first and/or in each case second subgasket (53, 54), such that in each case one layered inner region (38) of the in each case one proton exchange membrane (5) is enclosed by the in each case one first and second subgasket (53, 54) as sealing layers (41),
wherein
the proton exchange membranes (5), the first subgaskets (53), and the second subgaskets (54) are provided in that they are removed as a proton exchange membrane strip (65), a first subgasket strip (63), and a second subgasket strip (64) from storage devices (58, 59, 60) and the arrangement of the proton exchange membranes (5) between the first and second subgaskets (53, 54) and the connection of the proton exchange membranes (5) to the first and/or second subgaskets (53, 54) are configured in a state of the first subgaskets (53) as first subgasket strip (63) and of the second subgasket (54) as second subgasket strip (64), such that, during the arrangement and connection, the first subgaskets (53) are arranged connected to one another on the first subgasket strip (63) and the second subgaskets (54) are arranged connected to one another on the second subgasket strip (64).

### Claim 2 (depends on 1)

The method according to claim 1,
wherein
the first subgaskets (53) are removed from a first storage device (58) as first subgasket strip (63), the second subgaskets (54) are removed from a second storage device (59) as second subgasket strip (64), and the proton exchange membranes (5) are removed from a third storage device (60) as proton exchange membrane strip (65).

### Claim 3 (depends on 2)

The method according to claim 2,
wherein
the removal of the proton exchange membranes (5), the first subgaskets (53), and the second subgaskets (54) from the storage devices (58, 59, 60), the arrangement of the proton exchange membranes (5) between the first and second subgaskets (53, 54), and the connection of the proton exchange membranes (5) to the second subgaskets (53, 54) is carried out in a continuous process.

### Claim 4 (depends on 2)

The method according to claim 2,
wherein
the removal of the proton exchange membranes (5), the first subgaskets (53), and the second subgaskets (54) from the storage devices (58, 59, 60), the arrangement of the proton exchange membranes (5) between the first and second subgaskets (53, 54), and the connection of the proton exchange membranes (5) to the second subgaskets (53, 54) is carried out simultaneously.

### Claim 5 (depends on 2)

The method according to claim 2,
wherein
after the removal of the first subgaskets (53) from the first storage device (58), fluid openings (42) for process fluids are worked into the first subgaskets (53) as first subgasket strip (63), and, after the removal of the second subgasket (54) from the second storage device (59) fluid openings (42) for process fluids are worked into the second subgaskets (54) as second subgasket strip (64).

### Claim 6 (depends on 5)

The method according to claim 5,
wherein
the fluid openings (42) are worked into the first and second subgaskets (53, 54) as first and second subgasket strips (63, 64) before or after the arrangement of the proton exchange membranes (5) between the first and second subgaskets (53, 54) is carried out.

### Claim 7 (depends on 5)

The method according to claim 5,
wherein
after incorporation of the fluid openings (42) into the first and second subgaskets (53, 54), the first and second subgaskets (53, 54) are arranged as first and second subgasket strip (63, 64) on top of one another so as to align respective fluid openings (42) of the first and second subgaskets (53, 54).

### Claim 8 (depends on 2)

The method according to claim 2,
wherein
after the removal of the first subgaskets (53) from the first storage device (58), one perforation per respective opening (55) for the proton exchange membrane (5) is worked into the first subgaskets (53) as first subgasket strip (63) in a respective strip region (51), and after the removal of the second subgaskets (54) from the second storage device (59), one perforation per respective opening (55) for the proton exchange membrane (5) is worked into the second subgaskets (54) as second subgasket strip (64) in a respective strip region (51).

### Claim 9 (depends on 8)

The method according to claim 8,
wherein
the fluid openings (52) and the perforations for the openings (55) are continuously worked into the first and second subgaskets (53, 54) as first and second subgasket strips (63, 64) by separating devices (68, 70).

### Claim 10 (depends on 1)

The method according to claim 1,
wherein
before the arrangement of the proton exchange membranes (5) between the first and second subgaskets (53, 54) as first and second subgasket strip (63, 64), the proton exchange membrane (5) is cut off from the proton exchange membrane strip (65) for a respective membrane-electrode assembly (6), and a respective section (5) is cut off from the proton exchange membrane strip (60) as the respective proton exchange membrane (5) for the respective membrane-electrode assembly (6), and subsequently the arrangement of the respective proton exchange membrane (5) as the respectively cut-off section (5) between the first and second subgasket strip (63, 64) is carried out.

### Claim 11 (depends on 10)

The method according to claim 10,
wherein
at sub-regions of the first and second subgasket strip (63, 64) in a longitudinal direction (49) between the proton exchange membranes (5), no proton exchange membrane (5) is arranged.

### Claim 12 (depends on 10)

The method according to claim 10,
wherein
the separated sections (5) as the proton exchange membranes (5) are fixed on the first or second subgasket strip (63, 64) before being arranged between the first and second subgaskets (53, 54) as first and second subgasket strip (63, 64).

### Claim 13 (depends on 1)

The method according to claim 1,
wherein
after the arrangement of the proton exchange membranes (5) between the first and second subgaskets (53, 54) as first and second subgasket strip (63, 64) and the connection of the proton exchange membranes (5) to the first and/or second subgaskets (53, 54) as first and second subgasket strip (63, 64), the first and second subgasket strip (6) are separated, so that individually separate membrane-electrode assemblies (63, 64) are produced.

### Claim 14

A fuel cell unit (1) as a fuel cell stack (1) for electrochemically generating electrical energy, comprising fuel cells (2) arranged in a stacked manner, the fuel cells (2) comprising a respective proton exchange membrane (5), an anode (7), a cathode (8), a bipolar plate (10), and a gas diffusion layer (9), wherein the proton exchange membrane (5), the anode (7), and the cathode (8) form with a first and second subgasket (53, 54) a membrane-electrode assembly (6),
wherein
no catalyst layer (30) and/or no anode (7) and/or no cathode (8) is formed on the membrane-electrode assemblies (6) at an overlap region (56) between the first and second subgasket (53, 54) and the proton exchange membrane (5).

### Claim 15 (depends on 1)

A method for producing a fuel cell unit (1) as a fuel cell stack (1) for electrochemically generating electrical energy, with the following steps:
providing components (5, 6, 7, 8, 9, 10) of the fuel cells (2), including membrane-electrode assemblies (6), gas diffusion layers (9), and bipolar plates (10),
wherein the membrane-electrode assemblies (6) comprise a respective layered inner region (38) with a proton exchange membrane (5), an anode (7), and a cathode (8) and two respective sealing layers (41) as first and second subgaskets (53, 54), and the proton exchange membrane (5) is arranged between the anode (7) and cathode (8), and the sealing layers (41) enclosing the inner region (38) are configured as first and second subgaskets (53, 54).
stacking the components (5, 6, 7, 8, 9, 10) of the fuel cells (2) so that fuel cells (2) and a fuel cell unit (1) are formed,
wherein
the membrane-electrode assemblies (6) are provided by carrying out a method according to claim 1.

### Claim 16 (depends on 2)

The method according to claim 2, wherein the first subgaskets (53) are unwound from a first roll (58) as first subgasket strip (63), the second subgaskets (54) are unwound from a second roll (59) as second subgasket strip (64), and the proton exchange membranes (5) are unwound from a third roll (60) as proton exchange membrane strip (65).

### Claim 17 (depends on 5)

The method according to claim 5, wherein six fluid openings (42) are worked into the first subgaskets (53) in a fluid opening region (52), and wherein six fluid openings (42) are worked into the second subgaskets (54) in a fluid opening region (52).

### Claim 18 (depends on 6)

The method according to claim 6, wherein the fluid openings (42) are worked into the first and second subgaskets (53, 54) as first and second subgasket strips (63, 64) before the connection of the proton exchange membranes (5) to the first and/or second subgaskets (53, 54) is carried out.

### Claim 19 (depends on 9)

The method according to claim 9, wherein the separating devices (68, 70) are embossing rollers (69, 71).

### Claim 20 (depends on 12)

The method according to claim 12, wherein the separated sections (5) as the proton exchange membranes (5) are fixed on the first or second subgasket strip (63, 64) with a laminating roller (74).
