# US 2023/0410012 A1 · Project disaster warning method and system based on collaborative fusion of multi-physics monitoring data

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0410012 A1
- Document ID: US20230410012A1
- Status: Published application
- Kind: A1
- Application number: 18/091,663
- Filed: 2022-12-30
- Published: 2023-12-21
- Earliest claimed: 2022-06-16
- Assignees: Qingdao University of Technology
- Applicants: Qingdao University of Technology
- Inventors: Liming Zhang; Zhongyuan Liu; Yu Cong; Xiaoshan Wang; Zaiquan Wang; Fanxiu Chen; Jinfeng Cao
- Web page: https://patentgrep.com/patent/US20230410012A1

## CPC

- G06Q 10/0635: Risk analysis of enterprise or organisation activities
- G06F 18/25: Fusion techniques
- G06F 18/251: {of input or preprocessed data}
- G06N 3/0442: characterised by memory or gating, e.g. long short-term memory [LSTM] or gated recurrent units [GRU]
- G06N 3/08: Learning methods
- G06Q 50/265: {Personal security, identity or safety}
- Y02A 90/10: Information and communication technologies [ICT] supporting adaptation to climate change, e.g. for weather forecasting or climate simulation
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- Y02A: TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE

## Abstract

A project disaster warning method and system based on collaborative fusion of multi-physical field monitoring data is provided. The method includes: acquiring and preprocessing multi-sensor real-time monitoring data of potentially dangerous parts of a project structure; normalizing multi-physical field monitoring time sequence data to construct a normalized sample matrix; analyzing sensitivities of various physical field monitoring indicators to a safety state of a project by using a multivariate statistical method; guiding initialization training of a LSTM network according to the sensitivities, and obtaining output results of the LSTM network; obtaining basic probability assignments of various warning levels after fusion according to an improved D-S evidence theory based on Chebyshev distance, with the output results of the LSTM network as evidence inputs; determining disaster danger levels of the potentially dangerous parts of the project structure using a basic probability assignment-based decision method.

## Claims

### Claim 1

A project disaster warning method based on collaborative fusion of multi-physical field monitoring data, comprising:
acquiring and preprocessing multi-sensor real-time monitoring data of potentially dangerous parts of a project structure to obtain multi-physical field monitoring time sequence data;
performing normalization processing on the multi-physical field monitoring time sequence data to construct a normalized sample matrix;
analyzing sensitivities of various physical field monitoring indicators to a safety state of a project according to the normalized sample matrix, by using a multi variate statistical method;
guiding initialization training of a long short-term memory (LSTM) network according to the sensitivities of various physical field monitoring indicators to the safety state of the project, and obtaining output results of the LSTM network through a trained LSTM network;
obtaining basic probability assignments of various warning levels after fusion according to an improved D-S evidence theory based on Chebyshev distance-based, with the output results of the LSTM network as evidence inputs;
determining disaster danger levels of the potentially dangerous parts of the project structure according to the basic probability assignments of various warning levels after fusion, by using a basic probability assignment-based decision method.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the acquiring and preprocessing multi-sensor real-time monitoring data of potentially dangerous parts of a project structure to obtain multi-physical field monitoring time sequence data comprises:
acquiring the multi-sensor real-time monitoring data of the potentially dangerous parts of the project structure, wherein the multi-sensor real-time monitoring data is real-time monitoring data collected in time sequence by two or more of a strain sensor, a displacement sensor, a stress sensor, a wave velocity sensor, an osmotic pressure sensor, a temperature sensor, an acoustic emission sensor and an electromagnetic radiation sensor;
preprocessing the multi-sensor real-time monitoring data by wavelet analysis or mean value fitting method to remove abnormal or noise data and obtain the multi-physical field monitoring time sequence data.

### Claim 3 (depends on 2)

The method according to claim 2, wherein the performing normalization processing on the multi-physical field monitoring time sequence data to construct a normalized sample matrix comprises:
establishing, a sample data matrix X* according to the multi-physical field monitoring time sequence data, wherein various data columns Xi* the sample data matrix X* correspond to different physical field monitoring indicators i collected by different sensors; the physical field monitoring indicators i comprise strain, displacement, stress, wave velocity, osmotic pressure, temperature, acoustic emission, electromagnetic radiation;
performing normalization conversion on various data columns Xi* in the sample data matrix X* to obtain a normalized sample matrix X, wherein various data columns Xi in the normalized sample matrix X correspond to different physical field monitoring indicators i.

### Claim 4 (depends on 3)

The method according to claim 3, wherein the analyzing sensitivities of various physical field monitoring indicators to a safety state of a project according to the normalized sample matrix, by using a multi variate statistical method, comprises:
calculating a correlation coefficient matrix R according to the normalized sample matrix X;
calculating p non-negative characteristic roots {λ1, λ2, . . . , λp} according to the correlation coefficient matrix R, wherein p is a number of physical field monitoring indicators i;
determining cumulative contribution degrees Wq of first q common factors among p common factors according to the p non-negative characteristic roots {λ1, λ2, . . . , λp};
selecting main common factors Fq which reflect a safety state of the project structure according to a principle that the cumulative contribution degrees Wq are not less than 85%, and constructing a common factor matrix F;
calculating a factor load matrix A according to the common factor matrix F;
calculating weights Ti of various physical field monitoring indicators i in all main common factors according to the factor load matrix A;
calculating final weights τi of various physical field monitoring indicators i according to the cumulative contribution degrees Wq and the weights Ti corresponding to various physical field monitoring indicators i, wherein the final weights τi reflect the sensitivities of various physical field monitoring indicators i to the safety state of the project.

### Claim 5 (depends on 4)

The according to claim 4, wherein the guiding initialization training of a LSTM network according to the sensitivities of various physical field monitoring indicators to the safety state of the project, and obtaining output results of the LSTM network through a trained LSTM network comprises:
training the LSTM network with the sensitivities τi of various physical field monitoring indicators i to the safety state of the project as initialization weights of the LSTM network and the normalized sample matrix corresponding to various physical field monitoring indicators i as a sample set, by using a sigmoid function as a network activation function, to obtain the trained LSTM network;
performing feature-level fusion through the trained LSTM network to obtain the output results of the LSTM network.

### Claim 6 (depends on 5)

The method according to claim 5, wherein the obtaining basic probability assignments of various warning levels after fusion according to an improved D-S evidence theory based on Chebyshev distance, with the output results of the LSTM network as evidence inputs, comprises:
calculating, with the output results of the LSTM network as basic probability assignments of warning levels of various evidence bodies, a Chebyshev distance dBPA(mi,mj) between an evidence body mi and an evidence body mj;
calculating a new conflict coefficient k′ between the evidence body mi and the evidence body mj according to the Chebyshev distance dBPA(mi,mj);
obtaining basic probability assignments m(A), m(A) and m(C) of various warning levels after fusion based on the new conflict coefficient k′, according to the improved D-S evidence theory based on the Chebyshev distance, wherein the various warning levels comprise a stable period, a development period and an alarm period; m(A), m(B) and m(C) are basic probability assignments in the stable period, the development period and the alarm period, respectively.

### Claim 7

A project disaster warning system based on collaborative fusion of multi-physical field monitoring data, comprising:
a data acquisition and preprocessing module, configured to acquire and preprocess multi-sensor real-time monitoring data of potentially dangerous parts of a project structure to obtain multi-physical field monitoring time sequence data;
a normalization processing module, configured to perform normalization processing on the multi-physical field monitoring time sequence data to construct a normalized sample matrix;
a multi-physical field data-level fusion module, configured to analyze sensitivities of various physical field monitoring indicators to a safety state of a project according to the normalized sample matrix, by using a multivariate statistical method;
a multi-physical field feature-level fusion module, configured to guiding initialization training of a LSTM network according to the sensitivities of various physical field monitoring indicators to the safety state of the project, and obtain output results of the LSTM network through a trained LSTM network;
a multi-physical field data decision fusion module, configured to obtain basic probability assignments of various warning levels after fusion according to an improved D-S evidence theory based on Chebyshev distance, with the output results of the LSTM network as evidence inputs;
a disaster danger level evaluation module, configured to determine disaster danger levels of the potentially dangerous parts of the project structure according to the basic probability assignments of various warning levels after fusion, by using a basic probability assignment-based decision method.

### Claim 8 (depends on 7)

The system according to claim 7, wherein the data acquisition and preprocessing module comprises:
a data acquisition unit, configured to acquire the multi-sensor real-time monitoring data of the potentially dangerous parts of the project structure, wherein the multi-sensor real-time monitoring data is real-time monitoring data collected in time sequence by two or more of a strain sensor, a displacement sensor, a stress sensor, a wave velocity sensor, an osmotic pressure sensor, a temperature sensor, an acoustic emission sensor and an electromagnetic radiation sensor;
a data preprocessing unit, configured to preprocess the multi-sensor real-time monitoring data by wavelet analysis or mean value fitting method to remove abnormal or noise data and obtain the multi-physical field monitoring time sequence data.

### Claim 9 (depends on 8)

The system according to claim 8, wherein the normalization processing module comprises:
a sample data matrix establishment unit, configured to establish a sample data matrix X* according to the multi-physical field monitoring time sequence data, wherein various data columns Xi* in the sample data matrix X* correspond to different physical field monitoring indicators i collected by different sensors; the physical field monitoring indicators i comprises train, displacement, stress, wave velocity, osmotic pressure, temperature, acoustic emission, electromagnetic radiation;
a normalization conversion unit, configured to perform normalization conversion on various data columns Xi* in the sample data matrix X* to obtain the normalized sample matrix X, wherein various data columns Xi in the normalized sample matrix X correspond to various physical field monitoring indicators i.

### Claim 10 (depends on 9)

The system according to claim 9, wherein the multi-physical field data-level fusion module comprises:
a correlation coefficient matrix calculation unit, configured to calculate a correlation coefficient matrix R according, to the normalized sample matrix X;
a non-negative characteristic root calculation unit, configured to calculate p non-negative characteristic roots {λ1, λ2, . . . , λp} according to the correlation coefficient matrix R, wherein p is a number of physical field monitoring indicators i;
a cumulative contribution degree calculation unit; configured to determine cumulative contribution degrees Wq of first q common factors among p common factors according to the p non-negative characteristic roots {λ1, λ2, . . . , λp};
a main common factor selection unit, configured to select main common factors Fq which reflect a safety state of the project structure according to a principle that the cumulative contribution degrees Wq are not less than 85%, and construct a common factor matrix F;
a factor load matrix calculation unit, configured to calculate a factor load matrix A according to the common factor matrix F;
a weight calculation unit, configured to calculate Ti weights of various physical field monitoring indicators i in all main common factors according to the factor load matrix A;
a final weight calculation unit, configured to calculate final weights τi of various physical field monitoring indicators i according to the cumulative contribution degrees Wq and the weights Ti corresponding to various physical field monitoring indicators i, wherein the final weights τi reflect the sensitivities of various physical field monitoring indicators i to the safety state of the project.