# US 2023/0409995 A1 · Production planning optimization for automotive accessory installation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0409995 A1
- Document ID: US20230409995A1
- Status: Published application
- Kind: A1
- Application number: 17/842,569
- Filed: 2022-06-16
- Published: 2023-12-21
- Earliest claimed: 2022-06-16
- Assignees: Toyota Motor North America, Inc.; Toyota Jidosha Kabushiki Kaisha
- Applicants: Toyota Motor North America, Inc.
- Inventors: Nick S. Wu; Anthony D. Sanor
- Web page: https://patentgrep.com/patent/US20230409995A1

## CPC

- G06Q 10/06311: {Scheduling, planning or task assignment for a person or group}
- G06Q 10/06316: {Sequencing of tasks or work}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Systems and methods for production planning optimization for automotive accessory installation are provided. A method includes generating, by a processor, a vehicle identification number (VIN) work pool including a list of available VINs based on one or more VIN lists and a list of VIN exclusions. The method further includes calculating, by the processor, a line target work pool based on available resources. The method further includes calculating, by the processor, one or more production target work pools based on the VIN work pool and the line target work pool. The method further includes selecting, by the processor, a VIN from the VIN work pool for assignment to an assembly schedule based on an age of the VIN and a degree of the VIN satisfying the line target work pool, and the one or more production target work pools. Associated systems are also provided.

## Claims

### Claim 1

A method of determining a schedule for final assembly of vehicles, the method comprising:
generating, by a processor, a vehicle identification number (VIN) work pool comprising a list of available VINs based on one or more VIN lists and a list of VIN exclusions;
calculating, by the processor, a line target work pool based on available resources;
calculating, by the processor, one or more production target work pools based on the VIN work pool and the line target work pool; and
selecting, by the processor, a VIN from the VIN work pool for assignment to an assembly schedule based on an age of the VIN and a degree of the VIN satisfying the line target work pool and the one or more production target work pools.

### Claim 2 (depends on 1)

The method of claim 1, wherein the selecting comprises applying a stepwise approach to determine the VIN with the oldest age that satisfies the line target work pool and the one or more production target work pools.

### Claim 3 (depends on 2)

The method of claim 2, wherein the stepwise approach is based on a narrow-to-broad criteria determination.

### Claim 4 (depends on 1)

The method of claim 1, wherein:
the one or more production target work pools comprises a plurality of production target work pools; and
the selecting comprises applying a stepwise approach to determine the VIN with the oldest age that satisfies a greatest number of the line target work pool and the plurality of production target work pools.

### Claim 5 (depends on 4)

The method of claim 4, wherein the line target work pool and the plurality of production target work pools are calculated based on a Heijunka production principle.

### Claim 6 (depends on 1)

The method of claim 1, wherein the selecting further comprises:
removing the selected VIN from the VIN work pool; and
updating the line target work pool and the one or more production target work pools based on the removal of the selected VIN from the VIN work pool.

### Claim 7 (depends on 1)

The method of claim 1, wherein the calculating the one or more production target work pools comprises calculating, by the processor, at least one of:
an install time target work pool;
a region target work pool;
a dealer target work pool; or
a vehicle model/trim target work pool.

### Claim 8 (depends on 1)

The method of claim 1, further comprising iteratively selecting, by the processor, one or more additional VINs from the VIN work pool until a production target is met.

### Claim 9 (depends on 1)

The method of claim 1, wherein the line target work pool and the one or more production target work pools are defined for a scheduling period.

### Claim 10 (depends on 1)

The method of claim 1, wherein:
the one or more VIN lists comprise a list of ground-aged vehicles and a list of vessel-bound vehicles; and
a priority is given to the list of ground-aged vehicles in selecting the VIN for assignment to the assembly schedule.

### Claim 11

A system for implementing a scheduling process for final assembly of vehicles, the system comprising:
a processor configured to perform operations comprising:
generate a vehicle identification number (VIN) work pool comprising a list of available VINs based on one or more VIN lists and a list of VIN exclusions,
calculate a line target work pool based on available resources,
calculate one or more production target work pools based on the VIN work pool and the line target work pool, and
select a VIN from the VIN work pool for assignment to an assembly schedule based on an age of the VIN and a degree of the VIN satisfying the line target work pool and the one or more production target work pools.

### Claim 12 (depends on 11)

The system of claim 11, wherein the processor is configured to apply a stepwise approach to determine the VIN with the oldest age that satisfies the line target work pool and the one or more production target work pools.

### Claim 13 (depends on 12)

The system of claim 12, wherein the stepwise approach is based on a narrow-to-broad criteria determination.

### Claim 14 (depends on 11)

The system of claim 11, wherein:
the one or more production target work pools comprises a plurality of production target work pools; and
the processor is configured to apply a stepwise approach to determine the VIN with the oldest age that satisfies a greatest number of the line target work pool and the plurality of production target work pools.

### Claim 15 (depends on 14)

The system of claim 14, wherein the line target work pool and the plurality of production target work pools are calculated based on a Heijunka production principle.

### Claim 16 (depends on 11)

The system of claim 11, wherein the processor is configured to:
remove the selected VIN from the VIN work pool; and
update the line target work pool and the one or more production target work pools based on the removal of the selected VIN from the VIN work pool.

### Claim 17 (depends on 11)

The system of claim 11, wherein the one or more production target work pools comprises at least one of:
an install time target work pool;
a region target work pool;
a dealer target work pool; or
a vehicle model/trim target work pool.

### Claim 18 (depends on 11)

The system of claim 11, wherein the processor is configured to iteratively select one or more additional VINs from the VIN work pool until a production target is met.

### Claim 19 (depends on 11)

The system of claim 11, wherein the line target work pool and the one or more production target work pools are defined for a scheduling period.

### Claim 20 (depends on 11)

The system of claim 11, wherein:
the one or more VIN lists comprise a list of ground aged vehicles and a list of vessel-bound vehicles; and
a priority is given to the list of ground aged vehicles in selecting the VIN for assignment to the assembly schedule.