# US 2023/0409916 A1 · Methods and systems for training a machine learning model with measurement data captured during manufacturing process

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0409916 A1
- Document ID: US20230409916A1
- Status: Published application
- Kind: A1
- Application number: 17/842,041
- Filed: 2022-06-16
- Published: 2023-12-21
- Earliest claimed: 2022-06-16
- Assignees: Robert Bosch GmbH
- Applicants: Robert Bosch GmbH
- Inventors: Filipe J. CABRITA CONDESSA; Devin T. WILLMOTT; Ivan BATALOV; João D. SEMEDO; Wan-Yi LIN; Jeremy KOLTER; Jeffrey THOMPSON
- Web page: https://patentgrep.com/patent/US20230409916A1

## CPC

- G06N 3/045: Combinations of networks
- G06N 3/084: Backpropagation, e.g. using gradient descent
- G06N 3/088: Non-supervised learning, e.g. competitive learning
- G06N 3/042: Knowledge-based neural networks; Logical representations of neural networks
- G06N 3/044: Recurrent networks, e.g. Hopfield networks
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

Methods and systems for training a machine learning model with measurement data captured during a manufacturing process. Measurement data regarding a physical characteristic of a plurality of manufactured parts is received as measured by a plurality of sensors at various manufacturing stations. A time-series dynamics machine learning model encodes the measurement data into a latent space having a plurality of nodes. Each node is associated with the measurement data of one of the manufactured parts and at one of the manufacturing stations. A batch of the measurement data can be built, the batch include a first node and a first plurality of nodes immediately connected to the first node via first edges, and measured in time earlier than the first node. A prediction machine learning model can predict measurements of a first of the manufactured parts based on the latent space of the batch of nodes.

## Claims

### Claim 1

A computer-implemented method of training a machine learning model with measurement data captured during a manufacturing process, the method comprising:
receiving measurement data regarding a physical characteristic of a plurality of manufactured parts as measured by a plurality of sensors at various manufacturing stations;
via a time-series dynamics machine learning model, encoding the measurement data into a latent space having a plurality of nodes, each node associated with the measurement data of one of the manufactured parts as measured at one of the manufacturing stations;
via a prediction machine learning model, determining a predicted measurement of a first of the manufactured parts at a first of the manufacturing stations based on the latent space of at least some of the measurement data not including the measurement data corresponding to the first manufactured part at the first manufacturing station;
via the machine learning model, comparing the prediction measurement of the first manufactured part to the measurement data of the first manufactured part at the first manufacturing station;
based on a difference between the prediction measurements and the actual measurement data, updating parameters of the machine learning model until convergence; and
based upon the convergence, outputting a trained machine learning model with the updated parameters.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, further comprising:
batching the measurement data for processing by the prediction machine learning model, wherein the batching includes building a batch of nodes that are immediately connected to a first node via an edge and timestamped prior to the first node.

### Claim 3 (depends on 2)

The computer-implemented method of claim 2, wherein the step of predicting is performed on the batch of nodes.

### Claim 4 (depends on 2)

The computer-implemented method of claim 2, wherein the batching further includes selecting additional nodes for the batch, wherein the additional nodes include all nodes associated with the first manufactured part timestamped prior to the first node.

### Claim 5 (depends on 4)

The computer-implemented method of claim 4, wherein the additional nodes do not include all nodes associated with the first manufacturing station timestamped prior to the first node.

### Claim 6 (depends on 1)

The computer-implemented method of claim 1, wherein the measurement data is multimodal measurement data, and the predicted measurement is a multimodal predicted measurement.

### Claim 7 (depends on 1)

The computer-implemented method of claim 1, further comprising:
utilizing an embedding neural network to embed the measurement data into an array configured for execution by the time-series dynamics machine learning model.

### Claim 8

A system of training a machine learning model with measurement data captured during a manufacturing process, the system comprising:
a plurality of sensors located at a plurality of manufacturing stations, each sensor configured to produce measurement data indicating a physical characteristic of a plurality of manufactured parts passing through a respective one of the manufacturing stations,
at least one processor programmed to:
execute a time-series dynamics machine learning model to encode the measurement data into a latent space having a plurality of nodes, each node associated with the measurement data of one of the manufactured parts as measured at one of the manufacturing stations,
execute a prediction machine learning model to determine a predicted measurement of a first of the manufactured parts at a first of the manufacturing stations based on the latent space of at least some of the measurement data not including the measurement data corresponding to the first manufactured part at the first manufacturing station,
compare the prediction measurement of the first manufactured part to the measurement data of the first manufactured part measured at the first manufacturing station,
based on a difference between the prediction measurements and the actual measurement data, updating parameters of the machine learning model until convergence, and
based upon the convergence, output a trained machine learning model with the updated parameters.

### Claim 9 (depends on 8)

The system of claim 8, wherein the at least one processor is further programmed to:
build a batch of the measurement data for processing by the prediction machine learning model, wherein the batch includes selected nodes that are immediately connected to a first node via an edge and timestamped prior to the first node.

### Claim 10 (depends on 9)

The system of claim 9, wherein the at least one processor is further programmed to execute the predicting machine learning model with the batch of nodes.

### Claim 11 (depends on 9)

The system of claim 9, wherein the building of the batch further includes selecting additional nodes for the batch, wherein the additional nodes include all nodes associated with the first manufactured part timestamped prior to the first node.

### Claim 12 (depends on 11)

The system of claim 11, wherein the additional nodes do not include all nodes associated with the first manufacturing station timestamped prior to the first node.

### Claim 13 (depends on 8)

The system of claim 8, wherein the measurement data is multimodal measurement data, and the predicted measurement is a multimodal predicted measurement.

### Claim 14 (depends on 8)

The system of claim 8, wherein the at least one processor is further programmed to:
execute an embedding neural network to embed the measurement data into an array configured for execution by the time-series dynamics machine learning model.

### Claim 15

A computer-implemented method of training a machine learning model with measurement data captured during a manufacturing process, the method comprising:
receiving measurement data regarding a physical characteristic of a plurality of manufactured parts as measured by a plurality of sensors at various manufacturing stations;
via a time-series dynamics machine learning model, encoding the measurement data into a latent space having a plurality of nodes, each node associated with the measurement data of one of the manufactured parts as measured at one of the manufacturing stations;
batching the measurement data to build a batch including a first plurality of nodes that are immediately connected to a first node via first edges and measured in time earlier than the first node, and a second plurality of nodes wherein each of the second plurality of nodes are immediately connected to, and measured in time earlier than, a respective one of the first plurality of nodes via second edges; and
via a prediction machine learning model, determining a predicted measurement of a first of the manufactured parts at a first of the manufacturing stations based on the latent space of the batch of nodes.

### Claim 16 (depends on 15)

The computer-implemented method of claim 15, further comprising:
via the machine learning model, comparing the prediction measurement of the first manufactured part to the measurement data of the first manufactured part at the first manufacturing station;
based on a difference between the prediction measurements and the actual measurement data, updating parameters of the machine learning model until convergence; and
based upon the convergence, outputting a trained machine learning model.

### Claim 17 (depends on 16)

The computer-implemented method of claim 16, wherein the batching further includes selecting additional nodes for the batch, wherein the additional nodes include all nodes associated with the first manufactured part measured in time prior to the first node.

### Claim 18 (depends on 17)

The computer-implemented method of claim 17, wherein the additional nodes do not include all nodes associated with the first manufacturing station measured in time prior to the first node.

### Claim 19 (depends on 16)

The computer-implemented method of claim 16, wherein the measurement data is multimodal measurement data, and the predicted measurement is a multimodal predicted measurement.

### Claim 20 (depends on 15)

The computer-implemented method of claim 15, further comprising:
utilizing an embedding neural network to embed the measurement data into an array configured for execution by the time-series dynamics machine learning model.
