# US 2023/0408985 A1 · Apparatus and method for calculating asset capability using model predictive control and/or industrial process optimization

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0408985 A1
- Document ID: US20230408985A1
- Status: Published application
- Kind: A1
- Application number: 18/321,929
- Filed: 2023-05-23
- Published: 2023-12-21
- Earliest claimed: 2022-06-17
- Assignees: Honeywell International Inc.
- Applicants: Honeywell International Inc.
- Inventors: Pernell NORDH; Joseph LU; Yanling WU
- Web page: https://patentgrep.com/patent/US20230408985A1

## CPC

- G05B 13/0205: {not using a model or a simulator of the controlled system}
- G05B 17/02: electric
- G05B 13/027: {using neural networks only}
- G05B 13/042: {in which a parameter or coefficient is automatically adjusted to optimise the performance}
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

Various embodiments described herein relate to calculating asset capability using model predictive control and/or industrial process optimization. In this regard, an optimization request to optimize an industrial process that produces an industrial process product is received. In response to the optimization request, asset modeling data is obtained from one or more asset performance management systems for an asset associated with the industrial process. Also in response to the optimization request, one or more real-time operating limits for the industrial process are adjusted based at least in part on the asset modeling data obtained from the one or more asset performance management systems. Furthermore, a control signal configured based at least in part on the one or more real-time operating limits is transmitted to a controller configured for optimization associated with the industrial process that produces the industrial process product.

## Claims

### Claim 1

A system, comprising:
one or more processors;
a memory; and
one or more programs stored in the memory, the one or more programs comprising instructions configured to:
receive an optimization request to optimize an industrial process that produces an industrial process product; and
in response to the optimization request for the industrial process:
obtain asset modeling data from one or more asset performance management systems for an asset associated with the industrial process;
adjust one or more real-time operating limits for the industrial process based at least in part on the asset modeling data obtained from the one or more asset performance management systems; and
transmit a control signal configured based at least in part on the one or more real-time operating limits to a controller configured for optimization associated with the industrial process that produces the industrial process product.

### Claim 2 (depends on 1)

The system of claim 1, the one or more programs further comprising instructions configured to:
modify one or more proxy limits for the industrial process based on the asset modeling data obtained from the one or more asset performance management systems.

### Claim 3 (depends on 1)

The system of claim 1, the one or more programs further comprising instructions configured to:
configure the control signal based on a comparison between the adjusted one or more real-time operating limits and multivariate control criteria for the industrial process.

### Claim 4 (depends on 1)

The system of claim 1, the one or more programs further comprising instructions configured to:
obtain asset operational data from one or more asset performance management systems for the asset associated with the industrial process; and
adjust the one or more real-time operating limits for the industrial process based at least in part on the asset operational data obtained from the one or more asset performance management systems.

### Claim 5 (depends on 1)

The system of claim 1, the one or more programs further comprising instructions configured to:
obtain asset model configuration data from one or more asset performance management systems for the asset associated with the industrial process; and
adjust the one or more real-time operating limits for the industrial process based at least in part on the asset model configuration data obtained from the one or more asset performance management systems.

### Claim 6 (depends on 1)

The system of claim 1, the one or more programs further comprising instructions configured to:
obtain asset model output data from one or more asset performance management systems for the asset associated with the industrial process; and
adjust the one or more real-time operating limits for the industrial process based at least in part on the asset model output data obtained from the one or more asset performance management systems.

### Claim 7 (depends on 1)

The system of claim 1, the one or more programs further comprising instructions configured to:
obtain first-principles model data from one or more asset performance management systems for the asset associated with the industrial process; and
adjust the one or more real-time operating limits for the industrial process based at least in part on the first-principles model data obtained from the one or more asset performance management systems.

### Claim 8 (depends on 1)

The system of claim 1, the one or more programs further comprising instructions configured to:
obtain data-driven model data from a regression model configured for the asset associated with the industrial process; and
adjust the one or more real-time operating limits for the industrial process based at least in part on the data-driven model data obtained from the one or more asset performance management systems.

### Claim 9 (depends on 1)

The system of claim 1, the one or more programs further comprising instructions configured to:
obtain data-driven model data from a neural network model configured for the asset associated with the industrial process; and
adjust the one or more real-time operating limits for the industrial process based at least in part on the data-driven model data obtained from the one or more asset performance management systems.

### Claim 10

A method, comprising:
at a device with one or more processors and a memory:
receiving an optimization request to optimize an industrial process that produces an industrial process product; and
in response to the optimization request for the industrial process:
obtaining asset modeling data from one or more asset performance management systems for an asset associated with the industrial process;
adjusting one or more real-time operating limits for the industrial process based at least in part on the asset modeling data obtained from the one or more asset performance management systems; and
transmitting a control signal configured based at least in part on the one or more real-time operating limits to a controller configured for optimization associated with the industrial process that produces the industrial process product.

### Claim 11 (depends on 10)

The method of claim 10, the adjusting the one or more real-time operating limits for the industrial process comprising modifying one or more proxy limits for the industrial process based on the asset modeling data obtained from the one or more asset performance management systems.

### Claim 12 (depends on 10)

The method of claim 10, further comprising:
configuring the control signal based on a comparison between the adjusted one or more real-time operating limits and optimization criteria for the industrial process.

### Claim 13 (depends on 10)

The method of claim 10, further comprising:
configuring the control signal based on a comparison between the adjusted one or more real-time operating limits and multivariate control criteria for the industrial process.

### Claim 14 (depends on 10)

The method of claim 10, further comprising in response to the optimization request for the industrial process:
obtaining asset operational data from one or more asset performance management systems for the asset associated with the industrial process; and
adjusting the one or more real-time operating limits for the industrial process based at least in part on the asset operational data obtained from the one or more asset performance management systems.

### Claim 15 (depends on 10)

The method of claim 10, further comprising in response to the optimization request for the industrial process:
obtaining asset model configuration data from one or more asset performance management systems for the asset associated with the industrial process; and
adjusting the one or more real-time operating limits for the industrial process based at least in part on the asset model configuration data obtained from the one or more asset performance management systems.

### Claim 16 (depends on 10)

The method of claim 10, further comprising in response to the optimization request for the industrial process:
obtaining asset model output data from one or more asset performance management systems for the asset associated with the industrial process; and
adjusting the one or more real-time operating limits for the industrial process based at least in part on the asset model output data obtained from the one or more asset performance management systems.

### Claim 17 (depends on 10)

The method of claim 10, further comprising in response to the optimization request for the industrial process:
obtaining first-principles model data from one or more asset performance management systems for the asset associated with the industrial process; and
adjusting the one or more real-time operating limits for the industrial process based at least in part on the first-principles model data obtained from the one or more asset performance management systems.

### Claim 18 (depends on 10)

The method of claim 10, further comprising in response to the optimization request for the industrial process:
obtaining data-driven model data from a regression model configured for the asset associated with the industrial process; and
adjusting the one or more real-time operating limits for the industrial process based at least in part on the data-driven model data obtained from the one or more asset performance management systems.

### Claim 19 (depends on 10)

The method of claim 10, further comprising in response to the optimization request for the industrial process:
obtaining data-driven model data from a neural network model configured for the asset associated with the industrial process; and
adjusting the one or more real-time operating limits for the industrial process based at least in part on the data-driven model data obtained from the one or more asset performance management systems.

### Claim 20

A non-transitory computer-readable storage medium comprising one or more programs for execution by one or more processors of a device, the one or more programs including instructions which, when executed by the one or more processors, cause the device to:
receive an optimization request to optimize an industrial process that produces an industrial process product; and
in response to the optimization request for the industrial process:
obtain asset modeling data from one or more asset performance management systems for an asset associated with the industrial process;
adjust one or more real-time operating limits for the industrial process based at least in part on the asset modeling data obtained from the one or more asset performance management systems; and
transmit a control signal configured based at least in part on the one or more real-time operating limits to a controller configured for optimization associated with the industrial process that produces the industrial process product.
