# US 2023/0408151 A1 · Systems and methods for geothermal energy storage

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0408151 A1
- Document ID: US20230408151A1
- Status: Published application
- Kind: A1
- Application number: 18/026,541
- Filed: 2021-07-16
- Published: 2023-12-21
- Earliest claimed: 2020-09-16
- Assignees: Fervo Energy Company
- Applicants: Fervo Energy Company
- Inventors: Jack Norbeck; Timothy Latimer; Christian Gradl
- Web page: https://patentgrep.com/patent/US20230408151A1

## CPC

- F24T 10/20: using underground water as working fluid; using working fluid injected directly into the ground, e.g. using injection wells and recovery wells
- F03G 4/02: with direct {working} fluid contact
- F03G 4/072: {Controlling or monitoring}
- F24T 2010/56: {Control arrangements}
- Y02E 10/10: Geothermal energy
- Y02P 80/10: Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
- F24T: GEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
- F03G: SPRING, WEIGHT, INERTIA OR LIKE MOTORS; MECHANICAL-POWER PRODUCING DEVICES OR MECHANISMS, NOT OTHERWISE PROVIDED FOR OR USING ENERGY SOURCES NOT OTHERWISE PROVIDED FOR (arrangements in connection with power supply in vehicles from force of nature B60K16/00; electric propulsion with power supply in vehicles from force of nature B60L8/00)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A method and system may be used for storing energy in a geothermal system and recovering both the stored energy as well as thermal energy on demand. The geothermal system may include injection and production wells that are hydraulically coupled in a geothermal energy reservoir that behaves as a confined reservoir system with thermal energy transferring to fluid injected into the injection well and removed via the production well. Injection flow rate, injection pressure, production flow rate, production backpressure, or fluid residence time may be managed to control energy consumption or energy generation profiles of the geothermal system. During an energy storage mode, the injection flow rate exceeds the production flow rate thereby storing energy in the geothermal reservoir. During an energy recovery mode, production backpressure is reduced thereby releasing the stored energy and electricity is generated by removing the thermal energy from the fluid in a heat engine.

## Claims

### Claim 1

A method for shifting geothermal energy production from a lower demand period to a higher demand period, the method comprising:
injecting fluid into a confined geothermal reservoir system using an injection well;
producing fluid from the confined geothermal reservoir system using a production well hydraulically coupled to the injection well;
generating electric power at a baseline level by removing heat from the produced fluid;
modifying flow properties of fluid in the injection well or the production well to enter a charging period, wherein charging period net electric power generation is less than the baseline level; and
in response to the charging period ending, modifying the flow properties in the injection well or the production well to enter a discharging period, wherein discharging period net electric power generation is greater than the baseline level.

### Claim 2 (depends on 1)

The method of claim 1, further comprising creating the confined geothermal reservoir system by:
identifying a low-permeability geothermal formation;
drilling into the low-permeability formation;
installing the injection well and the production well with injection intervals and production intervals located within the low-permeability formation; and
performing a well stimulation treatment on at least one of the wells that results in hydraulically coupling the injection and production wells via a plurality of fractures disposed in the geothermal energy reservoir;
wherein the plurality of fractures are a primary flow path between the injection and production wells and wherein the low-permeability formation surrounding the fractures prevents fluid leakoff.

### Claim 3 (depends on 2)

The method of claim 2, wherein the low-permeability formation has a permeability of less than about 0.1 millidarcy.

### Claim 4 (depends on 2)

The method of claim 2, wherein the well stimulation treatment is performed using at least one of a plug-and-perforate style stimulation treatment technique, a sliding-sleeve style stimulation treatment technique, an open-hole packer technique, a diverter technique, or using a proppant material to increase or maintain hydraulic conductivity of the fractures.

### Claim 5 (depends on 2)

The method of claim 2, wherein the fluid injected using the injection well is modified with an additive to further reduce or prevent fluid leakoff from the fractures into the surrounding the low-permeability reservoir.

### Claim 6 (depends on 1)

The method of claim 1, further comprising creating the confined geothermal reservoir system by:
identifying a permeable geothermal formation;
drilling into the permeable geothermal formation; and
installing a well placement pattern of injection wells and production wells;
wherein hydraulic potential fields and fluid flow fields that arise during well operations cause artificial flow boundaries to form that prevent fluid leakoff.

### Claim 7 (depends on 6)

The method of claim 6, wherein the permeable geothermal formation has a permeability of greater than about 0.1 millidarcy.

### Claim 8 (depends on 6)

The method of claim 6, wherein the well placement pattern includes at least one of a five-spot pattern of vertical wells, a line-drive pattern of vertical wells, a five-spot pattern of horizontal wells, a line-drive pattern of horizontal wells, a triplet well pattern of horizontal wells, or a wine-rack pattern of horizontal wells.

### Claim 9 (depends on 6)

The method of claim 6, wherein the well placement pattern involves a set of wells spaced concentrically, with each concentric ring alternating between injection wells and production wells.

### Claim 10 (depends on 6)

The method of claim 6, wherein the well placement pattern additionally includes a reservoir engineering well operations plan that induces artificial flow boundaries to cause levels of fluid leakoff below a specified level.

### Claim 11 (depends on 6)

The method of claim 6, wherein well productivity and geothermal reservoir permeability are further augmented by performing a well stimulation treatment.

### Claim 12 (depends on 6)

The method of claim 6, wherein the well placement pattern includes at least one of an inverted five-spot pattern, a 7-spot pattern, or a 9-spot well pattern.

### Claim 13 (depends on 1)

The method of claim 1, further comprising creating the confined geothermal reservoir system by:
identifying a bounded geothermal formation;
drilling into the bounded geothermal formation; and
installing a geothermal energy system of injection and production wells;
wherein a geothermal reservoir boundary of the bounded geothermal formation prevents fluid leakoff.

### Claim 14 (depends on 13)

The method of claim 13, wherein the bounded geothermal formation is comprised of low-permeability or impermeable faults that define the geothermal reservoir boundary.

### Claim 15 (depends on 13)

The method of claim 13, wherein the bounded geothermal formation is comprised of low-permeability or impermeable formations above, below, or adjacent to the bounded geothermal formation that define the geothermal reservoir boundary.

### Claim 16 (depends on 13)

The method of claim 13, wherein the bounded geothermal formation is comprised of a combination of low-permeability or impermeable faults and low-permeability or impermeable formations above, below, or adjacent to the bounded geothermal formation that define the geothermal reservoir boundary.

### Claim 17 (depends on 13)

The method of claim 13, wherein well productivity and geothermal reservoir permeability are further augmented by performing a well stimulation treatment.

### Claim 18 (depends on 1)

The method of claim 1, wherein a reduction in net electric power generation during the charging period acts as an energy storage device consuming electricity from the electric grid.

### Claim 19 (depends on 1)

The method of claim 1, wherein an increase in net electric power generation during the discharging period acts as an energy storage device delivering electricity to the electric grid.

### Claim 20 (depends on 1)

The method of claim 1, wherein electricity is generated from thermal energy recovered from the produced fluid using an Organic Rankine Cycle generator system.

### Claim 21 (depends on 20)

The method of claim 20, wherein a ramping rate during the charging or discharging periods is about 15% of nominal power plant capacity per minute of the Organic Rankine Cycle generator system.

### Claim 22 (depends on 20)

The method of claim 20, wherein the charging period or discharging period is optimized to take advantage of inherent variability in thermal-to-electric conversion efficiency of the Organic Rankine Cycle generator system, the inherent variability caused by fluctuations in local ambient air temperature conditions.

### Claim 23 (depends on 22)

The method of claim 22, wherein the charging period or discharging period is optimized to take advantage of daily fluctuations in local ambient air temperature conditions.

### Claim 24 (depends on 22)

The method of claim 22, wherein the charging period or discharging period is optimized to take advantage of seasonal fluctuations in local ambient air temperature conditions.

### Claim 25 (depends on 22)

The method of claim 22, wherein historic temperature measurements are used in optimizing the charging or discharging period.

### Claim 26 (depends on 1)

The method of claim 1, wherein minimal fluid leakoff is less than about 15% of a total production rate of the geothermal energy system.

### Claim 27 (depends on 1)

The method of claim 1, wherein the geothermal energy system comprises a plurality of injection wells and a plurality of production wells disposed in the confined geothermal reservoir system.

### Claim 28 (depends on 1)

The method of claim 1, wherein the injection well or the production well, or both the injection well and the production well include a horizontal well section.

### Claim 29 (depends on 1)

The method of claim 1, wherein the injection well, the production well, or both the injection well and the production well include a deviated well section.

### Claim 30 (depends on 1)

The method of claim 1, wherein the charging period is optimized to store power from the electric grid for at least 4 hours and discharge the stored power to the electric grid at a round trip efficiency of at least 80%.

### Claim 31 (depends on 1)

The method of claim 1, wherein the charging period is optimized to store power from the electric grid for at least 8 hours and discharge the stored power to the electric grid at a round trip efficiency of at least 70%.

### Claim 32 (depends on 1)

The method of claim 1, wherein the charging period is optimized to store power from the electric grid for at least 24 hours and discharge the stored power to the electric grid at a round trip efficiency of at least 60%.

### Claim 33 (depends on 1)

The method of claim 1, wherein the charging period is optimized to store power from the electric grid for at least 200 hours and discharge the stored power to the electric grid at a round trip efficiency of at least 50%.

### Claim 34 (depends on 1)

The method of claim 1, wherein the charging period net electric power generation includes a component related to an amount of power required to pump the fluid down the injection well that acts as a parasitic load that reduces the charging period net electric power generation.

### Claim 35 (depends on 34)

The method of claim 34, further comprising:
installing a choke valve on the injection well; and
tightening the valve during the charging period to cause an injection pressure in the fluid to increase, to cause the parasitic load due to the injection pump to increase, to cause a rate of charging to increase, and to cause an amount of energy stored from the electricity grid to increase.

### Claim 36 (depends on 1)

The method of claim 1, wherein modifying the flow properties of the production well during the charging period includes reducing or curtailing a production flow rate, resulting in a decrease in charging period net electric power generation.

### Claim 37 (depends on 1)

The method of claim 1, wherein the charging period net electricity generation is negative.

### Claim 38 (depends on 1)

The method of claim 1, wherein combined net electric power generation including the charging and discharging period is about equal to the baseline level.

### Claim 39 (depends on 1)

The method of claim 1, wherein flow properties of at least one of the injection well or production well are modified to optimize a round trip efficiency of the charging and discharging periods.

### Claim 40 (depends on 1)

The method of claim 1, wherein modifying the flow properties includes using a control system to automatically modify the flow properties.

### Claim 41 (depends on 1)

The method of claim 1, further comprising inducing a thermosiphon effect by changing temperature or density of the fluid in the injection well or the production well to facilitate pumping of the fluid and reduce a parasitic pumping load.

### Claim 42 (depends on 1)

The method of claim 1, wherein modifying the flow properties of the fluid in the injection well or the production well to enter a charging period comprises injecting an amount of the fluid into the injection well that is greater than an amount of the fluid removed by the production well, thereby increasing hydraulic pressure in the geothermal energy reservoir, deforming the plurality of fractures or porous medium that comprises the reservoir by working against stresses in the geothermal energy reservoir, and storing energy in the geothermal energy reservoir in a form of hydraulic pressure or elastic potential energy.

### Claim 43 (depends on 1)

The method of claim 1, wherein changing the flow properties of the fluid in the injection well or the production well to enter a discharging period comprises alleviating choking of the production well to reduce backpressure.

### Claim 44

A system for shifting geothermal energy production from a period of lower energy production to a period of higher energy production at a geothermal energy system, the system comprising:
an injection well configured to receive fluid and inject the fluid into a confined geothermal reservoir system;
a production well hydraulically coupled to the injection well, and configured to produce fluid from the confined geothermal reservoir system;
an Organic Rankine Cycle generator system configured to generate electric power at a baseline level by removing heat from the produced fluid;
a control valve configured to:
modify flow properties of fluid in the injection well or the production well to enter a charging period, wherein charging period net electric power generation is less than the baseline level; and
in response to the charging period ending, modify the flow properties in the injection well or the production well to enter a discharging period, wherein discharging period net electric power generation is greater than the baseline level.

### Claim 45 (depends on 44)

The system of claim 44, further comprising an artificial lift system comprising a gas introduction system for introduction of gas into the production well to facilitate fluid flow through the production well.

### Claim 46 (depends on 44)

The system of claim 44, further comprising a fiber optic sensor disposed in the injection well or in the production well, the fiber optic sensor configured to sense fluid flow therethrough.

### Claim 47 (depends on 44)

The system of claim 44, further comprising a choking element hydraulically coupled to the production well, configured to create a backpressure in the production well.

### Claim 48 (depends on 44)

The system of claim 44, wherein the production well is configured to operate without a submersible pump or line shaft pump.