Risk early warning method and system for hydrogen leakage
AssigneeBeijing Institute of Technology
InventorsJianwei LI, Zhonghao TIAN, Xinming WAN, Hongwen HE, Fengchun SUN, Wenjun GUO, Zhanxin MAO
Life of this patent
Estimating the term…
Loading patent…
AssigneeBeijing Institute of Technology
InventorsJianwei LI, Zhonghao TIAN, Xinming WAN, Hongwen HE, Fengchun SUN, Wenjun GUO, Zhanxin MAO
Estimating the term…
The present disclosure relates to a risk early warning method and system for hydrogen leakage, and relates to the field of hydrogen leakage. The method includes: obtaining ventilation information of a hydrogen-related area; carrying out grid division on a pipeline system of the hydrogen-related area to obtain a gridded pipeline system; determining a risk coefficient corresponding to each grid of the gridded pipeline system according to leakage sources of the pipeline system; determining a high-risk region by means of a jet cone model according to the risk coefficients; determining a medium-risk region, a low-risk region and a safe region according to the risk coefficients and the ventilation information; and carrying out risk early warning according to the high-risk region, the medium-risk region, the low-risk region and the safe region.
1-8. (canceled)
A risk early warning method for hydrogen leakage, comprising:
A risk early warning system for hydrogen leakage, comprising:
Dependencies are inferred from the claim text.