Work method, work system and work program
AssigneeYanmar Holdings Co., Ltd.
InventorsKoji MIYAKE, Kenta ONISHI
Life of this patent
Estimating the term…
Abstract
An acquisition processing unit obtains a plant interval of agricultural materials. A setting processing unit sets a work starting reference position, which is a reference position for setting a work starting position where supply work of the agricultural materials is started, and sets the work starting position corresponding to each of a plurality of work routes on the basis of the plant interval and the work starting reference position.
Claims12
A work method for supplying agricultural materials to a field by a work vehicle, the work method comprising:
- obtaining a supply interval of the agricultural materials;
- setting a work starting reference position that is a reference position for setting a work starting position where supply work of the agricultural materials is started;
- and
- setting the work starting position corresponding to each of a plurality of work routes based on the supply interval and the work starting reference position.
A work system for supplying agricultural materials to a field by a work vehicle, the work system comprising:
- an acquisition processing unit configured to obtain a supply interval of the agricultural materials;
- and
- a setting processing unit configured to:
- set a work starting reference position that is a reference position for setting a work starting position where supply work of the agricultural materials is started;
- and
- set the work starting position corresponding to each of a plurality of work routes based on the supply interval and the work starting reference position.
A work program for supplying agricultural materials to a field by a work vehicle, the work program configured to cause one or more processors to perform operations comprising:
- obtaining a supply interval of the agricultural materials;
- setting a work starting reference position that is a reference position for setting a work starting position where supply work of the agricultural materials is started;
- and
- setting the work starting position corresponding to each of a plurality of work routes based on the supply interval and the work starting reference position.
Dependencies are inferred from the claim text.