# US 2023/0390725 A1 · Chemical Production

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0390725 A1
- Document ID: US20230390725A1
- Status: Published application
- Kind: A1
- Application number: 18/266,955
- Filed: 2021-12-10
- Published: 2023-12-07
- Earliest claimed: 2020-12-14
- Assignees: BASF SE
- Applicants: BASF SE
- Inventors: Christian Andreas Winkler; Hans Rudolph; Michael Hartmann; Markus Rautenstrauch; Yuan En Huang; Sebastian Wandernoth; Nataliya Yakut
- Web page: https://patentgrep.com/patent/US20230390725A1

## CPC

- B01J 19/0033: {Optimalisation processes, i.e. processes with adaptive control systems (adaptive control systems per se G05B13/00)}
- G05B 19/41875: {characterised by quality surveillance of production}
- B01J 19/004: {Multifunctional apparatus for automatic manufacturing of various chemical products (sequential reactions B01J19/0046)}
- B01J 2219/00207: other than of the reactor heat exchange system
- B01J 2219/0022: calculating difference
- B01J 2219/0024: other than of the reactor or heat exchange system
- B01J 2219/00243: Mathematical modelling
- G05B 2219/31472: Graphical display of process
- G05B 2219/32199: If number of errors grow, augment sampling rate for testing
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- B01J: CHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

The present teachings relate to a method for monitoring and/or controlling a production process for manufacturing at least one industrial product at an industrial plant comprising at least one equipment by processing at least one input, the method comprising: receiving, via an input inter-face, real-time process data from the equipment; determining, via the computing unit, a subset of the real-time process data; providing as output data the subset of the real-time process data. The present teachings also relate to a system, a use, and a software product.

## Claims

### Claim 1

A method for monitoring and/or controlling a production process for manufacturing a chemical product at an industrial plant, the industrial plant comprising at least one equipment, and the product being manufactured by processing, via the equipment, at least one input material using the production process, the method at least partially being performed via a computing unit, wherein the method comprising:
receiving, via an input interface, real-time process data from the equipment;
determining, via the computing unit, a subset of the real-time process data; the subset of the real-time process data being indicative of the process parameters and/or equipment operating conditions that the input material is processed under,
providing as output data, via an output interface, the subset of the real-time process data.

### Claim 2 (depends on 1)

The method of claim 1, wherein the method further comprises:
computing, via the computing unit, at least one performance parameter of the chemical product related to the input material, the computing being performed based on the subset of the real-time process data and historical process data.

### Claim 3 (depends on 2)

The method of claim 2, wherein the output data include the at least one performance parameter.

### Claim 4 (depends on 1)

The method of claim 1, wherein the method further comprises:
providing, via an interface, an object identifier comprising input material data; wherein the input material data is indicative of one or more properties of the input material.

### Claim 5 (depends on 4)

The method of claim 4, wherein the method further comprises:
appending, to the object identifier, the subset of the real-time process data.

### Claim 6 (depends on 4)

The method of claim 4, wherein the method further comprises:
appending, to the object identifier, the at least one performance parameter.

### Claim 7 (depends on 1)

The method of claim 1, wherein the input material for the processing via the equipment is divided into at least two packages wherein the size of a package is fixed or is determined based on an input material weight or amount, for which considerably constant process parameters or equipment operation parameters can be provided by the equipment.

### Claim 8 (depends on 1)

The method of claim 1, wherein the processing of the at least two packages is managed by means of corresponding data objects, each of which at least including an object identifier.

### Claim 9 (depends on 1)

The method of claim 1, wherein a data object is generated in response to a trigger signal being provided via the equipment.

### Claim 10 (depends on 9)

The method of claim 9, wherein the trigger signal is provided in response to the output of a corresponding sensor being arranged at each of an equipment unit of the equipment.

### Claim 11 (depends on 1)

The method of claim 1, wherein the equipment comprises a plurality of physically separated equipment zones, such that the output data comprise sub-sets of the real-time process data from each of the equipment zones and/or at least one performance parameter computed at each of the equipment zones.

### Claim 12 (depends on 1)

The method of claim 1, wherein the output data form a time-dependent data stream.

### Claim 13 (depends on 1)

The method of claim 1, wherein the output data and/or the time-dependent data stream are/is provided to a human machine interface (“HMI”) system.

### Claim 14 (depends on 13)

The method of claim 13, wherein the HMI system is at least partially a display device.

### Claim 15 (depends on 13)

The method of claim 13, wherein the HMI system is at least partially an augmented reality (“AR”) and/or virtual reality (“VR”) device.

### Claim 16 (depends on 13)

The method of claim 13, wherein the HMI system is at least partially an audio device.

### Claim 17

(canceled)

### Claim 18 (depends on 1)

A system for monitoring and/or controlling a production process, the system being configured to perform the method of claim 1.

### Claim 19 (depends on 1)

A computer program, or a non-transitory computer readable medium storing the program, comprising instructions which, when the program is executed by a suitable computing, cause the computing unit to carry out the method of claim 1.
