# US 2023/0362251 A1 · Method and apparatus for managing iot device, and server and storage medium thereof

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0362251 A1
- Document ID: US20230362251A1
- Status: Published application
- Kind: A1
- Application number: 17/774,659
- Filed: 2020-11-04
- Published: 2023-11-09
- Earliest claimed: 2019-11-05
- Assignees: Envision Digital International Pte.Ltd.; Shanghai Envision Digital Co., Ltd.
- Applicants: Envision Digital International Pte.Ltd.; Shanghai Envision Digital Co., Ltd.
- Inventors: Jian TANG; Lang MING
- Web page: https://patentgrep.com/patent/US20230362251A1

## CPC

- G05B 19/418: Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G16Y 30/00: IoT infrastructure
- G16Y 40/35: Management of things, i.e. controlling in accordance with a policy or in order to achieve specified objectives
- H04L 41/044: comprising hierarchical management structures
- H04L 41/0893: Assignment of logical groups to network elements
- H04L 41/12: Discovery or management of network topologies
- H04L 67/12: specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
- G05B 2219/31397: Instrument information management, subset of process management
- G05B 2219/31406: Data management, shop management, memory management
- H04W 4/70: Services for machine-to-machine communication [M2M] or machine type communication [MTC]
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G16Y: INFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

The present disclosure provides a method and apparatus for managing an IoT device. The method includes: acquiring device information and logic information of the IoT device, wherein the logic information is intended to indicate a logical attribute of the IoT device; generating a tree topology based on the device information and the logic information of the IoT device, wherein the tree topology comprises at least two layers of asset nodes, leaf nodes of the at least two layers of asset nodes being device asset nodes, non-leaf nodes being the device asset nodes or logical asset nodes, the device asset node corresponding to the IoT device, and the logical asset node corresponding to the logical attribute of the IoT device; and acquiring an ordered tree topology by sorting asset nodes in a same hierarchy in the tree topology.

## Claims

### Claim 1

A method for managing an Internet of Things (IoT) device, comprising:
acquiring device information and logic information of the IoT device, wherein the logic information is intended to indicate a logical attribute of the IoT device;
generating a tree topology based on the device information and the logic information of the IoT device, wherein the tree topology comprises at least two layers of asset nodes, leaf nodes of the at least two layers of asset nodes being device asset nodes, non-leaf nodes being the device asset nodes or logical asset nodes, the device asset node corresponding to the IoT device, and the logical asset node corresponding to the logical attribute of the IoT device; and
acquiring an ordered tree topology by sorting asset nodes in a same hierarchy in the tree topology.

### Claim 2 (depends on 1)

The method according to claim 1, wherein acquiring the ordered tree topology by sorting the asset nodes in the same hierarchy in the tree topology comprises:
acquiring the ordered tree topology by sorting the asset nodes in the same hierarchy based on an order of locations of the IoT devices; or
acquiring the ordered tree topology by sorting the asset nodes in the same hierarchy based on an order of importance of the IoT devices.

### Claim 3 (depends on 1)

The method according to claim 1, wherein a sequence number difference between adjacent asset nodes is a fixed value A, A being an integer greater than one; and
the method further comprises:
receiving a node insert instruction, wherein the node insert instruction is intended to indicate that T1 asset nodes are inserted between an M1th asset node and an (M1+1)th asset node of an N1th layer of the tree topology, and
assigning sequence numbers to the inserted T1 asset nodes based on a difference between a sequence number of the M1th asset node and a sequence number of the (M1+1)th asset node.

### Claim 4 (depends on 3)

The method according to claim 3, wherein assigning the sequence numbers to the inserted T1 asset nodes based on the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node comprises:
when the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node is greater than T1, assigning sequence numbers to the inserted T1 asset nodes by using sequence numbers between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset ode.

### Claim 5 (depends on 4)

The method according to claim 4, wherein assigning the sequence numbers to the inserted T1 asset nodes based on the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node comprises:
when the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node is less than T1, calculating a difference between the sequence number of the M1th asset node and a sequence number of an (M1+1)th asset node until the difference between the sequence number of the M1th asset node and the sequence number of the (M1+i)th asset node is greater than T1+i−1;
inserting the T1 asset nodes between the M1th asset node and the (M1+1)th asset node; and
adjusting the sequence numbers of the (M1+1)th asset node to an (M1+i−1)th asset node by using sequence numbers between the sequence number of the M1th asset node and the sequence number of the (M1+i)th asset node and assigning sequence numbers to the inserted T1 asset nodes;
where i is an integer greater than one.

### Claim 6 (depends on 1)

The method according to claim 1, wherein a sequence number difference between adjacent asset nodes is a fixed value A, A being an integer greater than one; and
the method further comprises:
receiving a node delete instruction, wherein the node delete instruction is intended to indicate that T2 asset nodes are deleted from an N2th layer of the tree topology; and
deleting the T2 asset nodes of the N2th layer, and eliminating sequence numbers of the T2 asset nodes.

### Claim 7 (depends on 1)

The method according to claim 1, wherein a sequence number difference between adjacent asset nodes is a fixed value A, A being an integer greater than one; and
the method further comprises:
receiving a node move instruction, wherein the node move instruction is intended to indicate that T3 asset nodes of an N3th layer are moved into between an M3th asset data node and an (M3+1)th asset data node of the N3th layer;
deleting the T3 asset nodes of the N3th layer, and eliminating sequence numbers of the T3 asset nodes; and
assigning sequence numbers to the inserted T3 asset nodes based on a difference between a sequence number of the M3th asset node and a sequence number of the (M3+1)th asset node.

### Claim 8

A server, comprising:
a memory storing at least one executable instruction therein; and
a processor coupled to the memory:
wherein the at least one executable instruction, when loaded and executed by the processor, causes the processor to perform a method comprising:
acquiring device information and logic information of the IoT device, wherein the logic information is intended to indicate a logical attribute of the IoT device;
generating a tree topology based on the device information and the logic information of the IoT device, wherein the tree topology comprises at least two layers of asset nodes, leaf nodes of the at least two layers of asset nodes being device asset nodes, non-leaf nodes being the device asset nodes or logical asset nodes, the device asset node corresponding to the IoT device, and the logical asset node corresponding to the logical attribute of the IoT device; and
acquiring an ordered tree topology by sorting asset nodes in a same hierarchy in the tree topology.

### Claim 9 (depends on 8)

The server according to claim 8, wherein acquiring the ordered tree topology by sorting the asset nodes in the same hierarchy in the tree topology comprises:
acquiring the ordered tree topology by sorting the asset nodes in the same hierarchy based on an order of locations of the IoT devices; or
acquiring the ordered tree topology by sorting the asset nodes in the same hierarchy based on an order of importance of the IoT devices.

### Claim 10 (depends on 8)

The server according to claim 8, wherein a sequence number difference between adjacent asset nodes is a fixed value A, A being an integer greater than one; and
the method further comprises:
receiving a node insert instruction, wherein the node insert instruction is intended to indicate that T1 asset nodes are inserted between an M1th asset node and an (M1+1)th asset node of an N1th layer of the tree topology; and
assigning sequence numbers to the inserted T1 asset nodes based on a difference between a sequence number of the M1th asset node and a sequence number of the (M1+1)th asset node.

### Claim 11 (depends on 10)

The server according to claim 10, wherein assigning the sequence numbers to the inserted T1 asset nodes based on the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node comprises:
when the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node is greater than T1, assigning sequence numbers to the inserted T1 asset nodes by using sequence numbers between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node.

### Claim 12 (depends on 11)

The server according to claim 11, wherein assigning the sequence numbers to the inserted T1 asset nodes based on the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node comprises:
when the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node is less than T1, calculating a difference between the sequence number of the M1th asset node and a sequence number of an (M1+1)th asset node until the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node is greater than T1+i−1;
inserting the T1 asset nodes between the M1th asset node and the (M1+1)h asset node; and
adjusting the sequence numbers of the (M1+1)th asset node to an (M1+i−1)th asset node by using sequence numbers between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node and assigning sequence numbers to the inserted T1 asset nodes;
where i is an integer greater than one.

### Claim 13 (depends on 8)

The server according to claim 8, wherein a sequence number difference between adjacent asset nodes is a fixed value A, A being an integer greater than one; and
the method further comprises:
receiving a node delete instruction, wherein the node delete instruction is intended to indicate that T2 asset nodes are deleted from an N2th layer of the tree topology; and
deleting the T2 asset nodes of the N2th layer, and eliminating sequence numbers of the T2 asset nodes:
or
the method further comprises:
receiving a node move instruction, wherein the node move instruction is intended to indicate that T3 asset nodes of an N3th layer are moved into between an M3th asset data node and an (M3+1)th asset data node of the N3th layer;
deleting the T3 asset nodes of the Nth layer, and eliminating sequence numbers of the T3 asset nodes; and
assigning sequence numbers to the inserted T3 asset nodes based on a difference between a sequence number of the M3th asset node and a sequence number of the (M3+1)th asset ode.

### Claim 14

A computer-readable storage medium storing at least one executable instruction therein;
wherein the at least one executable instruction, when loaded and executed by a processor, causes the processor to perform a method comprising:
acquiring device information and logic information of the IoT device, wherein the logic information is intended to indicate a logical attribute of the IoT device;
generating a tree topology based on the device information and the logic information of the IoT device, wherein the tree topology comprises at least two layers of asset nodes, leaf nodes of the at least two layers of asset nodes being device asset nodes, non-leaf nodes being the device asset nodes or logical asset nodes, the device asset node corresponding to the IoT device, and the logical asset node corresponding to the logical attribute of the IoT device; and
acquiring an ordered tree topology by sorting asset nodes in a same hierarchy in the tree topology.

### Claim 15 (depends on 14)

The computer-readable storage medium according to claim 14, wherein acquiring the ordered tree topology by sorting the asset nodes in the same hierarchy in the tree topology comprises:
acquiring the ordered tree topology by sorting the asset nodes in the same hierarchy based on an order of locations of the IoT devices; or
acquiring the ordered tree topology by sorting the asset nodes in the same hierarchy based on an order of importance of the IoT devices.

### Claim 16 (depends on 14)

The computer-readable storage medium according to claim 14, wherein a sequence number difference between adjacent asset nodes is a fixed value A, A being an integer greater than one; and
the method further comprises:
receiving a node insert instruction, wherein the node insert instruction is intended to indicate that T1 asset nodes are inserted between an M1th asset node and an (M1+1)th asset node of an N1th layer of the tree topology; and
assigning sequence numbers to the inserted T1 asset nodes based on a difference between a sequence number of the M1th asset node and a sequence number of the (M1+1)th asset node.

### Claim 17 (depends on 16)

The computer-readable storage medium according to claim 16, wherein assigning the sequence numbers to the inserted T1 asset nodes based on the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node comprises:
when the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node is greater than T1, assigning sequence numbers to the inserted T1 asset nodes by using sequence numbers between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node.

### Claim 18 (depends on 17)

The computer-readable storage medium according to claim 17, wherein assigning the sequence numbers to the inserted T1 asset nodes based on the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node comprises:
when the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node is less than T1, calculating a difference between the sequence number of the M1th asset node and a sequence number of an (M1+1)th asset node until the difference between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node is greater than T1+i−1;
inserting the T1 asset nodes between the M1th asset node and the (M1+1)th asset node; and
adjusting the sequence numbers of the (M1+1)th asset node to an (M1+i−1)th asset node by using sequence numbers between the sequence number of the M1th asset node and the sequence number of the (M1+1)th asset node and assigning sequence numbers to the inserted T1 asset nodes;
where i is an integer greater than one.

### Claim 19 (depends on 14)

The computer-readable storage medium according to claim 14, wherein a sequence number difference between adjacent asset nodes is a fixed value A, A being an integer greater than one; and
the method further comprises:
receiving a node delete instruction, wherein the node delete instruction is intended to indicate that T2 asset nodes are deleted from an N2th layer of the tree topology; and
deleting the T2 asset nodes of the N2th layer, and eliminating sequence numbers of the T2 asset nodes;
or
the method further comprises:
receiving a node move instruction, wherein the node move instruction is intended to indicate that T3 asset nodes of an N3th layer are moved into between an M1th asset data node and an (M3+1)th asset data node of the N3th layer;
deleting the T3 asset nodes of the N3th layer, and eliminating sequence numbers of the T3 asset nodes; and
assigning sequence numbers to the inserted T3 asset nodes based on a difference between a sequence number of the M3th asset node and a sequence number of the (M3+1)th asset node.
