# US 2023/0341445 A1 · Power meter having multiple ethernet ports

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0341445 A1
- Document ID: US20230341445A1
- Status: Published application
- Kind: A1
- Application number: 18/341,183
- Filed: 2023-06-26
- Published: 2023-10-26
- Earliest claimed: 2004-10-25
- Applicants: EI Electronics LLC, d/b/a Electro Industries/Gauge Tech
- Inventors: Erran Kagan
- Web page: https://patentgrep.com/patent/US20230341445A1

## CPC

- G01R 21/133: by using digital technique
- G01D 4/002: {Remote reading of utility meters}
- G01D 4/004: {Remote reading of utility meters to a fixed location}
- G01D 2204/18: Remote displaying of utility meter readings
- G01D 2204/40: Networks; Topology
- G01D 2204/45: Utility meters networked together within a single building
- Y02B 70/30: Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y04S 20/242: Home appliances
- Y04S 20/30: Smart metering, e.g. specially adapted for remote reading
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G01D: MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A power meter or other electrical device is provided having two independent and communicatively isolated Ethernet ports. The first Ethernet port is addressable by a first unique identifier and is configured for enabling full access to the power meter via an internal LAN. This enables a LAN operator to remotely access the power meter via the internal LAN for performing metering functions, such as full telemetry, control and programming. The second Ethernet port is addressable by a second unique identifier and is configured for being connected to the Internet. Since the second Ethernet port is communicatively isolated from the first Ethernet port, a user can access the power meter via the Internet, but cannot access the internal LAN by connecting to the power meter via the Internet.

## Claims

### Claim 1

An electrical metering device comprising:
at least one power monitor configured for monitoring at least one parameter of an electrical distribution system;
a memory chip configured to store the at least one parameter;
a first communication port having a first unique identifier and configured for connecting to a first network;
a second communication port having a second unique identifier and configured for connecting to a second network; and
one or more processors configured for receiving data from the at least one monitoring component, storing the received data in the memory chip and transmitting at least a portion of the data to at least one of the first and second communication ports,
wherein the first communication port provides read/write access to the memory chip and the second communication port provides read-only access to the memory chip.

### Claim 2 (depends on 1)

The electrical metering device of claim 1, wherein the second communication port is communicatively isolated from the first communication port.

### Claim 3 (depends on 1)

The electrical metering device of claim 1, wherein the information accessible via. the second communication port is controlled by instructions provided via the first communication port.

### Claim 4 (depends on 1)

The electrical metering, device of claim 1, wherein information accessible via the second communication port is presented in a form of web pages viewable using at least one Internet browser.

### Claim 5 (depends on 1, 4)

The electrical metering device of claim 4, wherein the web pages are created using HTML or XML programming languages. The electrical metering device of claim 1, wherein the first communication port permits access to modify programmable instructions implemented by the processor and the second communication port is unable to access programmable instructions implemented by the processor.

### Claim 7 (depends on 1)

The electrical metering device of claim 1, wherein the memory chip is a flash memory chip. The electrical metering device of claim 1, wherein the power monitor measures current.

### Claim 9 (depends on 1)

The electrical metering device of claim 1, wherein the one or more processors are configured to receive instructions and create at least one webpage from data received from the power monitor.

### Claim 10

An electrical metering device comprising:
a housing having a pass-through aperture;
a faceplate having a display connected to the housing;
at least one power monitor positioned at least partially in the housing, the power monitor configured for monitoring at least one parameter of an electrical distribution system;
a memory chip positioned in the housing and configured to store the at least one parameter;
a first communication port connected to the housing and having a first unique identifier and configured for connecting to a first network;
a second communication port connected to the housing and having a second unique identifier and configured for connecting to a second network; and
one or more processors positioned in the housing, the one or more processors configured for receiving data from the at least one monitoring component, storing the received data in the memory chip and transmitting at least a portion of the data to at least one of the first and second communication ports,
wherein the first communication port provides access to the one or more processors and the second communication port does not provide access to the processor.

### Claim 11 (depends on 10)

The electrical metering device of claim 10, wherein the information accessible via the second communication port is controlled by instructions provided via the first communication port.

### Claim 12 (depends on 10)

The electrical metering device of claim 10, wherein the first communication port permits access to modify programmable instructions implemented by the processor.

### Claim 13 (depends on 10)

The electrical metering, device of claim 10 wherein the first communication port provides read/write access to the memory chip and the second communication port provides read-only access to the memory chip

### Claim 14 (depends on 10)

The electrical metering device of claim 10, wherein the memory chip is a flash memory chip.

### Claim 15 (depends on 10)

The electrical metering device of claim 10, wherein the power monitor measures current.

### Claim 16 (depends on 10)

The electrical metering device of claim 10, wherein the one or more processors are configured to receive instructions and create at least one webpage from data received from the power monitor.

### Claim 17

A method of providing selective access to a power meter comprising:
providing access over a first network through a first communication port having a first unique identifier to an electrical metering device, the electrical metering device having at least one power monitor configured for monitoring at least one parameter of an electrical distribution system, a memory chip configured to store the at least one parameter, and one or more processors configured for receiving data from the at least one monitoring component, storing the received data. in the memory chip and transmitting at least a portion of the data to the first communication port;
permitting a user to access the one or more processors through the first communication port to provide instructions to control data available through a second communication port over a second network different from the first network; and
providing read-only access of the data through the second communication port.

### Claim 18 (depends on 17)

The method of claim 17, further comprising permitting the user to set operational parameters of the power monitor through the first communication port.

### Claim 19 (depends on 17)

The method of claim 17, further comprising creating, by the one or more processors, a webpage based on user instructions, storing the webpage in the memory chip, and providing read-only access of the webpage through the second communication port.

### Claim 20 (depends on 19)

The method of claim 19, further comprising providing, through the webpage, hyperlinks to at least one other webpage stored in the memory chip.
