# US 2023/0338882 A1 · Variable installation in a gas flow channel

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0338882 A1
- Document ID: US20230338882A1
- Status: Published application
- Kind: A1
- Application number: 17/799,367
- Filed: 2021-02-09
- Published: 2023-10-26
- Earliest claimed: 2020-02-12
- Assignees: Munters Euroform GmbH
- Applicants: Munters Euroform GmbH
- Inventors: Peter Wandres
- Web page: https://patentgrep.com/patent/US20230338882A1

## CPC

- B01D 45/08: by impingement against baffle separators
- B01D 45/10: which are wetted
- B01D 53/14: by absorption
- B01D 53/1406: {Multiple stage absorption}
- F23J 15/04: using washing fluids {(scrubbers for removing solids only F23J15/022)}
- B01D: SEPARATION (separating solids from solids by wet methods B03B, B03D; by pneumatic jigs or tables B03B; by other dry methods B07; magnetic or electrostatic separation of solid materials from solid materials or fluids, separation by high-voltage electric fields B03C; centrifuges, vortex apparatus B04; presses per se for squeezing-out liquid from liquid-containing material B30B9/02; treatment of water C02F, e.g. softening by ion-exchange C02F1/42; {arrangements of air intake cleaners in gas turbine plants F02C7/05} ; arrangements or mounting of filters in air-conditioning, air-humidification or ventilation F24F13/28)
- F23J: REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES (combustion apparatus for consuming smoke or fumes, e.g. exhaust gases, F23G7/06)

## Abstract

An installation in a gas flow channel includes a first layer of rod-shaped elements positioned at a distance from one another along a plane transverse to a direction of gas flow and a second layer of rod-shaped elements offset relative to the first layer. The second layer of rod-shaped elements is positioned at a distance from one another along the plane transverse to the direction of gas flow. The of rod-shaped elements extend across the gas flow channel. The second layer is structured to move relative to the first layer to define at least one of: (i) one or more additional operating positions; and (ii) an out-of-phase position.

## Claims

### Claim at position 1

1-10. (canceled)

### Claim 11

An installation in a gas flow channel comprising:
a first layer comprising rod-shaped elements positioned at a distance from one another along a plane transverse to a direction of gas flow; and
a second layer comprising rod-shaped elements offset relative to the first layer and positioned at a distance from one another along the plane transverse to the direction of gas flow,
wherein the of rod-shaped elements are configured to extend across the gas flow channel, and
wherein the second layer is configured to move relative to the first layer to define at least one of: (i) one or more additional operating positions; and (ii) an out-of-phase position.

### Claim 12 (depends on 11)

The installation according to claim 11, wherein the second layer is configured to move in a direction parallel to the gas flow direction.

### Claim 13 (depends on 11)

The installation according to claim 11, wherein the second layer is configured to move in a vertical direction relative to the gas flow direction.

### Claim 14 (depends on 11)

The installation according to claim 11, wherein the installation is configured as a coalescer.

### Claim 15 (depends on 11)

The installation according to claim 11, wherein the installation is configured as a mass transfer tray.

### Claim 16 (depends on 11)

The installation according to claim 11, wherein the rod-shaped elements comprise a tubular shape.

### Claim 17 (depends on 11)

The installation according to claim 11, further comprising:
an apparatus configured to detect a parameter and transmit a signal; and
a control unit configured to process the signal received from the parameter detection apparatus and control movement of the second layer according to the signal.

### Claim 18 (depends on 17)

The installation according to claim 17, wherein the parameter is a parameter of the gas flow.

### Claim 19 (depends on 17)

The installation according to claim 17, wherein the control unit is configured to compare the signal received from the parameter detection apparatus with a predetermined threshold value before the movement of the second layer occurs.

### Claim 20 (depends on 11)

The installation according to claim 11, wherein the movement of the second layer is performed using one or more water-operated hydraulic cylinders.

### Claim 21 (depends on 20)

The installation according to claim 20, wherein the one or more water-operated hydraulic cylinders are coupled to a flushing apparatus.

### Claim 22

A flue gas scrubber system comprising:
a gas flow channel; and
an installation positioned in the gas flow channel and comprising,
a first layer of rod-shaped elements positioned at a distance from one another along a plane transverse to a direction of gas flow, and
a second layer of rod-shaped elements offset relative to the first layer and positioned at a distance from one another along the plane transverse to the direction of gas flow,
wherein the rod-shaped elements are configured to extend across the gas flow channel, and
wherein the second layer is configured to move relative to the first layer to define at least one of: (i) one or more additional operating positions; and (ii) an out-of-phase position.
