Work management system, method, and non-transitory computer-readable medium
AssigneeOMRON Corporation
InventorsShinji Kobayashi, Shinji Ueno
Life of this patent
Estimating the term…
Loading patent…
AssigneeOMRON Corporation
InventorsShinji Kobayashi, Shinji Ueno
Estimating the term…
In a workplace where a work is performed based on a previously-optimized work schedule, a decrease in productivity can be prevented while interference between a plurality of work subjects is avoided. A schedule management unit is configured to calculate a first margin time from an end time of a first work to a start time of a second work, the first work being allocated to a time period including a current time in the work schedule of a first work subject, the second work being scheduled next to the first work in the work schedule. When an interference condition is satisfied and the first margin time is longer than a specific reference time, the schedule management unit instructs the first work subject to take action of avoiding the second work subject.
A work management system comprising:
A method for managing a work schedule of a work subject based on movement information related to movement of each of a plurality of work subjects performing a work in a workplace,
A non-transitory computer-readable medium storing a program that manages a work schedule of a work subject based on movement information related to movement of each of a plurality of work subjects performing a work in a workplace,
Dependencies are inferred from the claim text.