# US 2023/0312251 A1 · Systems and methods for handling particulate material

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0312251 A1
- Document ID: US20230312251A1
- Status: Published application
- Kind: A1
- Application number: 18/121,501
- Filed: 2023-03-14
- Published: 2023-10-05
- Earliest claimed: 2022-04-04
- Assignees: Bowlin Enterprises, LLC
- Applicants: Bowlin Enterprises, LLC
- Inventors: Jon BOWLIN
- Web page: https://patentgrep.com/patent/US20230312251A1

## CPC

- B65G 11/083: {for bulk (B65G11/085 takes precedence)}
- B65G 65/32: Filling devices
- B65G 11/206: {for bulk}
- B65G 47/72: transferring materials in bulk from one conveyor to several conveyors, or vice versa
- B65G 69/181: {by means of sealed systems}
- B65G 69/182: {with aspiration means}
- E21B 43/2607: {Surface equipment specially adapted for fracturing operations}
- B65G: TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS (packaging B65B; handling thin or filamentary materials, e.g. paper sheets or thread, B65H; cranes B66C; portable mobile or lifting or hauling appliances, e.g. hoists, B66D; devices for lifting or lowering goods for loading or unloading purposes, e.g. fork-lift trucks, B66F9/00; emptying bottles, jars, casks, barrels or similar containers, not otherwise provided for, B67C9/00; delivering or transferring liquids B67D; filling or discharging vessels for liquefied, solidified or compressed gases F17C; pipe-line systems for fluids F17D)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A system for handling particulate material includes a chute. The chute includes a main conduit and first and second branch conduits that extend from the main conduit. The chute includes a flow adjuster configured to alter a flow distribution of the particulate material between the first and second branch conduits. In an example operation, first and second containers are placed onto a shuttle on a transfer conveyor. The transfer conveyor moves the shuttle with the first and second containers beneath the chute to place the first container under the first branch conduit and the second container under the second branch conduit. The containers are loaded with particulate material distributed through the chute. Then the containers are moved away from the chute.

## Claims

### Claim 1

A system for handling particulate material, the system comprising:
a chute including:
a main conduit;
a first branch conduit extending from the main conduit, and terminating at
a first spout; and
a second branch conduit extending from the main conduit, and terminating at a second spout;
a feed conveyor configured to discharge the particulate material into the main conduit;
a first lift disposed below the first spout, and configured to raise a first container toward the first spout;
a second lift disposed below the second spout, and configured to raise a second container toward the second spout; and
a transfer conveyor system configured to move the first and second containers between a first position away from the chute and a second position in which the first container is beneath the first spout and the second container is beneath the second spout.

### Claim 2 (depends on 1)

The system of claim 1, wherein the chute includes a flow adjuster configured to alter a flow distribution of the particulate material between the first and second branch conduits.

### Claim 3 (depends on 1)

The system of claim 1, wherein the transfer conveyor system extends from a first location at a first side of the chute to a second location beneath the chute, and comprises:
a first transfer conveyor disposed at the first location; and
a second transfer conveyor disposed at the second location and aligned with the first transfer conveyor.

### Claim 4 (depends on 1)

The system of claim 1, wherein the transfer conveyor system further comprises a shuttle including a base configured to receive the first and second containers.

### Claim 5 (depends on 4)

The system of claim 4, further comprising a discharge conveyor mounted below the shuttle.

### Claim 6 (depends on 1)

The system of claim 1, further comprising a dust extraction system, the dust extraction system including:
a dust collector;
a first exhaust line coupling the first spout to the dust collector;
a second exhaust line coupling the second spout to the dust collector;
a third exhaust line coupling the feed conveyor to the dust collector; and
a fan coupled to an exhaust of the dust collector, the fan configured to induce a flow of air through the first, second, and third exhaust lines towards the dust collector.

### Claim 7 (depends on 6)

The system of claim 6, wherein the dust extraction system further includes a return line coupled between the dust collector and the chute.

### Claim 8

A system for handling containers, the system comprising:
a frame;
a transfer conveyor mounted to the frame, and including a pair of parallel elongated channels;
a shuttle disposed on the transfer conveyor, and including:
a base configured to receive a container; and
a pair of channel keys extending from the base, each channel key projecting into a corresponding one of the pair of channels; and
a lift mounted to the frame, and including first and second lift units configured to raise a container off the base and lower the container onto the base.

### Claim 9 (depends on 8)

The system of claim 8, wherein the transfer conveyor further includes one of a driven chain, a driven track, or a driven cable disposed in each channel, and engaged with a corresponding one of the pair of channel keys.

### Claim 10 (depends on 8)

The system of claim 8, wherein each channel key includes a wheel disposed in the corresponding channel.

### Claim 11 (depends on 10)

The system of claim 10, wherein at least one of the wheels is powered to move the shuttle along the transfer conveyor.

### Claim 12 (depends on 8)

The system of claim 8, wherein the shuttle further includes:
an aperture through the base; and
a gate valve coupled to the base, and associated with the aperture.

### Claim 13 (depends on 8)

The system of claim 8, further comprising a discharge conveyor mounted to the frame below the shuttle.

### Claim 14 (depends on 8)

The system of claim 8, wherein at least one of the first and second lift units includes a load cell.

### Claim 15

A method of handling particulate material, the method comprising:
placing first and second containers onto a transfer conveyor system at a predetermined separation;
operating the transfer conveyor system to move the first container to a location beneath a first spout of a chute, and to move the second container to a location beneath a second spout of the chute;
lifting the first container off the transfer conveyor system and toward the first spout;
lifting the second container off the transfer conveyor system and toward the second spout;
discharging the particulate material from a feed conveyor into a main conduit of the chute;
diverting a first portion of the particulate material in the main conduit into a first branch conduit, and a second portion of the particulate material in the main conduit into a second branch conduit;
discharging the first portion into the first container through the first spout, and the second portion into the second container through the second spout;
monitoring a first weight of the particulate material in the first container and a second weight of the particulate material in the second container;
lowering the first and second containers back onto the transfer conveyor system; and
operating the transfer conveyor system to move the first and second containers away from the chute.

### Claim 16 (depends on 15)

The method of claim 15, wherein:
the first and second containers are placed onto the transfer conveyor system at a first location at a first side of the chute; and
operating the transfer conveyor system to move the first and second containers away from the chute includes moving the first and second containers to a second location at a second side of the chute opposite the first side.

### Claim 17 (depends on 15)

The method of claim 15, wherein:
the first and second containers are placed onto the transfer conveyor system at a container loading station at a side of the chute; and
operating the transfer conveyor system to move the first and second containers away from the chute includes moving the first and second containers back to the container loading station.

### Claim 18 (depends on 15)

The method of claim 15, wherein placing the first and second containers onto the transfer conveyor system comprises placing the first and second containers onto a shuttle.

### Claim 19 (depends on 18)

The method of claim 18, wherein operating the transfer conveyor system to move the first and second containers comprises moving the shuttle.

### Claim 20 (depends on 18)