# US 2023/0291459 A1 · Downlink Signal Reception with Antenna Panel Switching

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0291459 A1
- Document ID: US20230291459A1
- Status: Published application
- Kind: A1
- Application number: 18/319,250
- Filed: 2023-05-17
- Published: 2023-09-14
- Earliest claimed: 2019-09-27
- Assignees: Apple Inc.
- Applicants: Apple Inc.
- Inventors: Yushu Zhang; Dawei Zhang; Haitong Sun; Wei Zeng; Hong He; Yuchul Kim; Chunhai Yao; Haijing Hu
- Web page: https://patentgrep.com/patent/US20230291459A1

## CPC

- H04B 7/0828: {with delay elements in antenna paths}
- H04B 7/0874: {using subgroups of receive antennas}
- H04B 7/0691: {using subgroups of transmit antennas}
- H04B 7/06956: {using a selection of antenna panels}
- H04B 7/088: {using beam selection}
- H04L 5/0048: {Allocation of pilot signals, i.e. of signals known to the receiver (allocation of control signalling H04L5/0053; use of control signalling H04L5/0091)}
- H04W 72/12: Wireless traffic scheduling
- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- H04B: TRANSMISSION
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Apparatuses, systems, and methods for performing downlink signal reception with antenna panel switching in a wireless communication system. A cellular base station may receive an indication of an antenna panel activation delay from a wireless device. The cellular base station may select a scheduling offset for a transmission to the wireless device based at least in part on the antenna panel activation delay. The scheduling offset may be selected to be at least the length of the antenna panel activation delay if it is expected that the wireless device may perform antenna panel activation to receive the transmission. The cellular base station may schedule the transmission to the wireless device using the selected scheduling offset, and may perform the transmission to the wireless device at the selected scheduling offset after scheduling the transmission to the wireless device.

## Claims

### Claim 1

A user equipment (UE) device, comprising:
at least one antenna;
at least one radio coupled to the at least one antenna; and
a processor coupled to the at least one radio;
wherein the at least one antenna, the at least one radio, and the processor are configured to cause the UE device to:
report an indication for a beam switching delay, wherein the indication comprises a value;
receive a physical downlink control channel (PDCCH) triggering measurement of an aperiodic channel state information reference signal (A-CSI-RS) transmission at a scheduling offset;
when the scheduling offset is at least the value and the A-CSI-RS transmission is configured for repetition, apply a transmission configuration indictor (TCI) state configured for the A-CSI-RS transmission, and otherwise apply a default TCI state based on the TCI state for a control resource set (CORESET) with a lowest CORESET identifier (ID) in a latest one or more slots; and
receive the A-CSI-RS transmission based on the scheduling offset and the applied TCI state.

### Claim 2 (depends on 1)

The UE device of claim 1,
wherein the value is one of 224 or 336 symbols.

### Claim 3 (depends on 1)

The UE device of claim 1, wherein the UE device is further configured to:
provide an indication of a number of beam groups and a number of beams per beam group supported by the UE device.

### Claim 4 (depends on 3)

The UE device of claim 3,
wherein the scheduling offset is selected based at least in part on whether a number of scheduled channel state information reference signal (CSI-RS) resources of the A-CSI-RS transmission is above the number of beams per beam group supported by the UE device.

### Claim 5 (depends on 3)

The UE device of claim 3,
wherein the scheduling offset is selected such that at least the beam switching delay passes before the end of the aperiodic A-CSI-RS transmission to the UE device when a number of scheduled channel state information reference signal (CSI-RS) resources of the aperiodic CSI-RS transmission is above the number of beams per beam group supported by the UE device.

### Claim 6 (depends on 1)

The UE device of claim 1, wherein the UE device is further configured to, at a later time:
report an indication of an updated beam switching delay of the UE device.

### Claim 7 (depends on 1)

The UE device of claim 1,
wherein the UE device is configured to communicate using a 5th Generation (5G) New Radio (NR) radio access technology (RAT).

### Claim 8

An apparatus, comprising:
a processor configured to cause a user equipment (UE) device to:
report an indication for a beam switching delay, wherein the indication comprises a value;
receive a physical downlink control channel (PDCCH) triggering measurement of an aperiodic channel state information reference signal (A-CSI-RS) transmission at a scheduling offset;
when the scheduling offset is at least the value and the A-CSI-RS transmission is configured for repetition, apply a transmission configuration indictor (TCI) state configured for the A-CSI-RS transmission, and otherwise apply a default TCI state based on the TCI state for a control resource set (CORESET) with a lowest CORESET identifier (ID) in a latest one or more slots; and
receive the A-CSI-RS transmission based on the scheduling offset and the applied TCI state.

### Claim 9 (depends on 8)

The apparatus of claim 8,
wherein the value is one of 224 or 336 symbols.

### Claim 10 (depends on 8)

The apparatus of claim 8, wherein the processor is further configured to cause the UE device to:
provide an indication of a number of beam groups and a number of beams per beam group supported by the UE device.

### Claim 11 (depends on 10)

The apparatus of claim 10,
wherein the scheduling offset is selected based at least in part on whether a number of scheduled channel state information reference signal (CSI-RS) resources of the A-CSI-RS transmission is above the number of beams per beam group supported by the UE device.

### Claim 12 (depends on 10)

The apparatus of claim 10,
wherein the scheduling offset is selected such that at least the beam switching delay passes before the end of the aperiodic A-CSI-RS transmission to the UE device when a number of scheduled channel state information reference signal (CSI-RS) resources of the aperiodic CSI-RS transmission is above the number of beams per beam group supported by the UE device.

### Claim 13 (depends on 8)

The apparatus of claim 8, wherein the apparatus is further configured to cause the UE device to, at a later time:
report an indication of an updated beam switching delay of the UE device.

### Claim 14 (depends on 8)

The apparatus of claim 8,
wherein the UE device is configured to communicate using a 5th Generation (5G) New Radio (NR) radio access technology (RAT).

### Claim 15

A method, comprising:
by a user equipment (UE) device:
reporting an indication for a beam switching delay, wherein the indication comprises a value;
receiving a physical downlink control channel (PDCCH) triggering measurement of an aperiodic channel state information reference signal (A-CSI-RS) transmission at a scheduling offset;
when the scheduling offset is at least the value and the A-CSI-RS transmission is configured for repetition, applying a transmission configuration indictor (TCI) state configured for the A-CSI-RS transmission, and otherwise applying a default TCI state based on the TCI state for a control resource set (CORESET) with a lowest CORESET identifier (ID) in a latest one or more slots; and
receiving the A-CSI-RS transmission based on the scheduling offset and the applied TCI state.

### Claim 16 (depends on 15)

The method of claim 15,
wherein the value is one of 224 or 336 symbols.

### Claim 17 (depends on 15)

The method of claim 15, further comprising:
providing an indication of a number of beam groups and a number of beams per beam group supported by the UE device.

### Claim 18 (depends on 17)

The method of claim 17,
wherein the scheduling offset is selected based at least in part on whether a number of scheduled channel state information reference signal (CSI-RS) resources of the A-CSI-RS transmission is above the number of beams per beam group supported by the UE device.

### Claim 19 (depends on 15)

The method of claim 15, further comprising:
at a later time, report an indication of an updated beam switching delay of the UE device.

### Claim 20 (depends on 15)

The method of claim 15,
wherein the UE device is configured to communicate using a 5th Generation (5G) New Radio (NR) radio access technology (RAT).
