# US 2023/0279632 A1 · Poor foundation reinforcement system and reinforcement method based on underground concealed arch structures

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0279632 A1
- Document ID: US20230279632A1
- Status: Published application
- Kind: A1
- Application number: 18/110,159
- Filed: 2023-02-15
- Published: 2023-09-07
- Earliest claimed: 2022-03-01
- Assignees: Shandong University; Shandong Hi-Speed Group Co., Ltd.
- Applicants: Shandong University; Shandong Hi-speed Group Co. Ltd.
- Inventors: Renjuan Sun; Chuan Wang; Yanhua Guan; Yonghao Li; Peizhi Zhuang; Huaqiang Yuan; Hongzhi Zhang; Linglai Bu; Yifan Li; Yuhe Tian; Lin Wang
- Web page: https://patentgrep.com/patent/US20230279632A1

## CPC

- E02D 27/12: Pile foundations
- E02D 5/50: Piles comprising both precast concrete portions and concrete portions cast in situ {(E02D5/523 takes precedence)}
- E02D 29/16: Arrangement or construction of joints in foundation structures ({for hydraulic engineering E02B3/16}; sealing joints not restricted to foundation structures E04B1/68)
- E02D 2300/002: Concrete
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}

## Abstract

A poor foundation reinforcement system and a reinforcement method based on underground concealed arch structures are provided. The system and the method belong to the technical field of poor foundation treatment. The reinforcement system includes multiple columns of pile foundations arranged along a bridge direction. Multiple arch sheets are set in parallel between each two adjacent columns of pile foundations. Each arch sheet includes multiple high-pressure rotary jet piles arranged along the bridge. Each two adjacent arch sheets of the multiple arch sheets are connected by a micro-bending slab disposed on the two adjacent arch sheets, the multiple arch sheets are connected by the micro-bending slabs to together form an arch ring, and a construction joint is disposed between each two adjacent micro-bending slabs of the micro-bending slabs.

## Claims

### Claim 1

A poor foundation reinforcement system based on underground concealed arch structures, comprising: a plurality of columns of pile foundations, arranged along a bridge direction;
wherein each two adjacent columns of pile foundations of the plurality of columns of pile foundations are provided therebetween with a plurality of arch sheets in parallel, and each of the plurality of arch sheets comprises a plurality of high-pressure rotary jet piles arranged along the bridge direction;
wherein each two adjacent arch sheets of the plurality of arch sheets are connected by a micro-bending slab disposed on the two adjacent arch sheets, the plurality of arch sheets are connected by the micro-bending slabs to together form an arch ring for bearing a load on the arch ring, and a construction joint is disposed between each two adjacent micro-bending slabs of the micro-bending slabs;
wherein the plurality of arch sheets are arranged in parallel along a transverse bridge direction, lengths of high-pressure rotary jet piles of the plurality of arch sheets at a same position along the transverse bridge direction are the same, lengths of the plurality of high-pressure rotary jet piles of each of the plurality of arch sheets along the bridge direction are different from each other, and an arch axis of the plurality high-pressure rotary jet piles along the bridge direction is a catenary;
wherein the two adjacent columns of pile foundations of the plurality of columns of pile foundations and the arch ring are connected in an embedded manner, and high-pressure rotary jet piles on both sides of the arch ring are driven into and connected rigidly to the two adjacent columns of pile foundations of the plurality of columns of pile foundations;
wherein the micro-bending slab is a prefabricated reinforced concrete slab, and a lower part of the micro-bending slab facing toward the two adjacent arch sheets is arched; and
wherein the micro-bending slab is provided with longitudinal load-bearing steel bars and stirrups.

### Claim 2 (depends on 1)

The poor foundation reinforcement system based on underground concealed arch structures according to claim 1, wherein a diameter of each of the plurality of high-pressure rotary jet piles of each of the plurality of arch sheets is in a range of 0.6-0.8 meters (m).

### Claim 3 (depends on 2)

The poor foundation reinforcement system based on underground concealed arch structures according to claim 2, wherein a material of each of the plurality of high-pressure rotary jet piles forming the arch ring is an ordinary Portland cement with a strength grade not less than 42.5 megapascals (MPa).

### Claim 4 (depends on 1)

The poor foundation reinforcement system based on underground concealed arch structures according to claim 1, wherein each pile foundation of the plurality of columns of pile foundations is a high-pressure rotary jet pile;
for a soil layer with a thickness not greater than 35 m and having a rock formation in the soil layer, a bottom of the pile foundation is disposed on the rock formation; and
for the soil layer with a thickness greater than 35 m, the pile foundation is a friction pile.

### Claim 5 (depends on 4)

A reinforcement method for the poor foundation reinforcement system based on underground concealed arch structures according to claim 4, comprising:
step 1: pile foundation construction, comprising: determining a location of drilling holes, a diameter of the pile foundation, and a depth of the pile foundation into soil according to a construction design;
step 2: determining diameters of high-pressure rotary jet piles forming the arch ring, a number of the high-pressure rotary jet piles forming the arch ring disposed along the transverse bridge direction and a center distance of two high-pressure rotary jet piles of the high-pressure rotary jet piles, performing high-pressure rotary jet pile construction on the arch ring to make the arch axis of the arch ring to be the catenary;
step 3: connecting the pile foundations and the arch ring in the embedded manner, and using a drill machine to drive the high-pressure rotary jet piles on both sides of the arch ring into the pile foundation by a depth of 2 m to form a hingeless arch structure;
step 4: preparing the micro-bending slabs in factories, filling soil before installation of the micro-bending slabs, installing the micro-bending slabs after filling the soil, setting up the construction joint between each two adjacent micro-bending slabs, and filling concrete in the construction joint; and
step 5: paving bitumen pavement on the micro-bending slabs, adding crash barriers, and setting up road signs.

### Claim 6 (depends on 5)

The reinforcement method for the poor foundation reinforcement system based on underground concealed arch structures according to claim 5, wherein the performing high-pressure rotary jet pile construction in the step 2 comprises:
step 2.1: leveling a site, and performing surveying and setting out;
step 2.2: drilling holes using a method of pile jumping construction after determining a location, numbering the high-pressure rotary jet piles, every three of the high-pressure rotary jet piles along a length direction being a sequence, performing construction of a next sequence after completing construction of a same sequence;
step 2.3: cleaning the drilled holes; spraying cement after cleaning the drilled holes, wherein the cement is the ordinary Portland cement with a strength grade not less than 42.5 MPa and a density not less than 500 kg/m, a water cement ratio of cement paste of the ordinary Portland cement is 1:1; wherein a water pressure increases gradually to a predetermined pressure during drilling the holes; performing jet grouting using double pipe injection when the holes are drilled to a designated elevation; and grouting the cement paste and air simultaneously using a jet pump, wherein a pressure of the jet pump is not less than 20 MPa, and an air flow pressure is not less than 0.7 MPa;
step 2.4: stopping grouting the cement paste in case of grout spilling during the high-pressure rotary jet pile construction, and continue to perform the high-pressure rotary jet pile construction after initial setting of the cement paste; and
step 2.5: using an overall construction sequence to perform the high-pressure rotary jet pile construction, wherein the overall construction sequence comprising: constructing the pile foundations first, then constructing the arch sheets on both sides of the pile foundations, and finally constructing remaining arch sheets from the both sides of the pile foundations.