# US 2023/0276355 A1 · Energy saving management for communication networks

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0276355 A1
- Document ID: US20230276355A1
- Status: Published application
- Kind: A1
- Application number: 18/245,459
- Filed: 2021-08-30
- Published: 2023-08-31
- Earliest claimed: 2020-09-21
- Assignees: Elisa Oyj
- Applicants: Elisa Oyj
- Inventors: Simon HOLMBACKA
- Web page: https://patentgrep.com/patent/US20230276355A1

## CPC

- H04W 52/0206: {in access points, e.g. base stations}
- Y02D 30/70: in wireless communication networks
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

A computer implemented method for energy savings management for cells of a sector or a base station of a communication network. The sector or base station has co-located cells that operate on different frequency bands. The method is performed by obtaining a default energy savings plan that calls for fully shutting down at least one of the cells for a first time period and provides a first amount of energy savings; evaluating energy savings achievable by using partial shutdown in cells and determining a second time period of partial shutdown that is needed for achieving the first amount of energy savings; obtaining a third time period that is usable for energy savings actions; and choosing to use partial shutdown in the cells, if the second time period is shorter than the third time period, and else choosing to use the default energy saving plan.

## Claims

### Claim 1

A computer implemented method for energy savings management for cells of a sector or base station of a communication network, wherein the sector or base station comprises at least two co-located cells that operate on different frequency bands, the method comprising
obtaining default energy savings plan, wherein the default energy savings plan calls for fully shutting down at least one of the cells of the sector or base station for a first time period and provides a first amount of energy savings;
evaluating energy savings achievable by using partial shutdown in cells of the sector or base station and determining a second time period of partial shutdown that is needed for achieving the first amount of energy savings;
obtaining a third time period that is usable for energy savings actions; and
choosing to use partial shutdown in the cells of the sector or base station, if the second time period is shorter than the third time period, and else choosing to use the default energy savings plan.

### Claim 2 (depends on 1)

The method of claim 1, wherein the partial shutdown is implemented by shutting down one or more multiple input multiple output, MIMO, antenna branches in cells of the sector or base station.

### Claim 3 (depends on 1)

The method of claim 1, further comprising periodically repeating the method.

### Claim 4 (depends on 1)

The method of claim 1, wherein evaluation of the energy savings achievable by using partial shutdown is based on linear interpolation over the third time period.

### Claim 5 (depends on 1)

The method of claim 1, wherein evaluation of the energy savings achievable by using partial shutdown is based on measurements of energy consumption with a 0-10% load in the cells of the sector or base station.

### Claim 6 (depends on 1)

The method of claim 1, wherein duration of the first time period is static.

### Claim 7 (depends on 1)

The method of claim 1, wherein duration of the first time period varies dynamically.

### Claim 8 (depends on 1)

The method of claim 1, wherein choosing to use partial shutdown in the cells of the sector or base station comprises choosing to use partial shutdown in the cells of the sector or base station at least for the duration of the third time period.

### Claim 9 (depends on 1)

The method of claim 1, wherein choosing to use partial shutdown in the cells of the sector or base station comprises choosing to use partial shutdown in at least one of the cells of the sector or base station for a fourth time period, wherein duration of the fourth time period is between the duration of the second time period and the duration of the third time period.

### Claim 10 (depends on 1)

The method of claim 1, wherein choosing to use partial shutdown in the cells of the sector or base station comprises choosing to use partial shutdown in at least one of the cells of the sector or base station for the duration of the third time period.

### Claim 11

An apparatus comprising
a processor, and
a memory including computer program code; the memory and the computer program code configured to, with the processor, cause the apparatus to perform
obtaining default energy savings plan, wherein the default energy savings plan calls for fully shutting down at least one of cells of a sector or base station of a communication network for a first time period and provides a first amount of energy savings, wherein the sector or base station comprises at least two co-located cells that operate on different frequency bands;
evaluating energy savings achievable by using partial shutdown in cells of the sector or base station and determining a second time period of partial shutdown that is needed for achieving the first amount of energy savings;
obtaining a third time period that is usable for energy savings actions; and
choosing to use partial shutdown in the cells of the sector or base station, if the second time period is shorter than the third time period, and else choosing to use the default energy savings plan.

### Claim 12

A non-transitory memory medium storing a computer program comprising computer executable program code which when executed by a processor causes an apparatus to perform
obtaining default energy savings plan, wherein the default energy savings plan calls for fully shutting down at least one of cells of a sector or base station of a communication network for a first time period and provides a first amount of energy savings, wherein the sector or base station comprises at least two co-located cells that operate on different frequency bands;
evaluating energy savings achievable by using partial shutdown in cells of the sector or base station and determining a second time period of partial shutdown that is needed for achieving the first amount of energy savings;
obtaining a third time period that is usable for energy savings actions; and
choosing to use partial shutdown in the cells of the sector or base station, if the second time period is shorter than the third time period, and else choosing to use the default energy savings plan.