# US 2023/0275801 A1 · User equipment, base station and methods in a radio communications network

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0275801 A1
- Document ID: US20230275801A1
- Status: Published application
- Kind: A1
- Application number: 18/111,936
- Filed: 2023-02-21
- Published: 2023-08-31
- Earliest claimed: 2017-05-05
- Assignees: Telefonaktiebolaget LM Ericsson (publ)
- Applicants: Telefonaktiebolaget LM Ericsson (publ)
- Inventors: Icaro L. J. Da Silva; Claes Tidestav
- Web page: https://patentgrep.com/patent/US20230275801A1

## CPC

- H04L 41/0654: using network fault recovery (ring fault isolation or reconfiguration in loop networks without recovery actions by a network management system H04L12/437)
- H04B 7/0617: {for beam forming}
- H04B 7/0619: {using feedback from receiving side (feedback signaling for adaptive modulation/coding H04L1/0001)}
- H04B 7/06964: {Re-selection of one or more beams after beam failure}
- H04L 5/0048: {Allocation of pilot signals, i.e. of signals known to the receiver (allocation of control signalling H04L5/0053; use of control signalling H04L5/0091)}
- H04L 7/0008: {Synchronisation information channels, e.g. clock distribution lines}
- H04L 43/16: Threshold monitoring
- H04L 69/28: Timers or timing mechanisms used in protocols
- H04B 7/0413: MIMO systems
- H04B 7/088: {using beam selection}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04B: TRANSMISSION

## Abstract

According to a first aspect of embodiments herein, the object is achieved by a method performed by a User Equipment (UE) for monitoring a beam transmitted by a base station in a radio communications network. The base station is serving the UE. The UE monitors a reference signal related to the beam, from the base station. Each time a quality of the reference signal is below a first threshold, the UE generates an Out-Of-Synchronization (OOS) event. When the number of OOS events reaches an OOS Beam Failure Detection (BFD) threshold, the UE triggers a beam recovery preparation procedure, and when the number of OOS events reaches an OOS Radio Link Monitoring (RLM), threshold, the UE starts an RLF timer.

## Claims

### Claim 1

A method performed by a User Equipment (UE), the method comprising:
generating an Out-Of-Synchronization (OOS) event each time a quality of a reference signal monitored by the UE is below a first threshold;
triggering a beam recovery preparation procedure when the number of OOS events reaches an OOS Beam Failure Detection (BFD) threshold, the OOS BFD threshold being lower than an OOS Radio Link Monitoring (RLM) threshold used by the UE for starting a radio link failure (RLF) timer.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
receiving, from the base station, a configuration comprising at least one reference signal related to the beam, which reference signal is to be monitored by the UE for BFD and cell-level RLM.

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
each time a quality of the reference signal is above a second threshold, generating an In-Synchronization (IS) event.

### Claim 4 (depends on 1)

The method of claim 1, wherein:
triggering the beam recovery preparation procedure is performed when furthermore, the number of IS events is below an IS BFD threshold.

### Claim 5

A method performed by a base station, the method comprising:
configuring the UE with an OOS Beam Failure Detection (BFD) threshold to be used by the UE to trigger a beam recovery preparation procedure when a number of out-of-synchronization (OOS) events generated by the UE while monitoring a reference signal reaches the OOS BFD threshold, the OOS BFD threshold being lower than an OOS Radio Link Monitoring (RLM) threshold used by the UE for starting a radio link failure (RLF) timer.

### Claim 6 (depends on 5)

The method of claim 5, further comprising:
configuring the UE with a second threshold to be used by the UE to, each time a quality of the reference signal is above a second threshold, generate an In-Synchronization (IS) event.

### Claim 7 (depends on 5)

The method of claim 5, further comprising:
configuring the UE with an in-sync (IS) BFD threshold to be used by the UE to trigger the beam recovery preparation procedure when, furthermore, the number of IS events is below the IS BFD threshold.

### Claim 8 (depends on 7)

The method of claim 7, further comprising:
configuring the UE with an IS RLM threshold to be used by the UE to start the RLF timer when, furthermore, the number of IS events is below the IS RLM threshold.

### Claim 9

A User Equipment (UE), comprising:
radio interface circuitry; and
processing circuitry operatively coupled to the radio circuitry and configured to:
generate an Out-Of-Synchronization (OOS) event each time a quality of a reference signal monitored by the UE is below a first threshold;
trigger a beam recovery preparation procedure when the number of OOS events reaches an OOS Beam Failure Detection (BFD) threshold, the OOS BFD threshold being lower than an OOS Radio Link Monitoring (RLM) threshold used by the UE for starting a radio link failure (RLF) timer.

### Claim 10 (depends on 9)

The UE of claim 9, wherein the processing circuitry is further configured to:
receive from the base station a configuration comprising at least one reference signal related to the beam, which reference signal is to be monitored by the UE for BFD, and cell-level RLM.

### Claim 11 (depends on 9)

The UE of claim 9, wherein the processing circuitry is further configured to:
each time a quality of the reference signal is above a second threshold, generate an In-Synchronization (IS) event.

### Claim 12 (depends on 9)

The UE of claim 9, wherein the processing circuitry is further configured to:
trigger the beam recovery preparation procedure when, furthermore, the number of IS events is below an IS BFD threshold.

### Claim 13 (depends on 9)

The UE of claim 9, wherein the processing circuitry is further configured to start the RLF timer when, furthermore, the number of IS events is below an IS RLM threshold.

### Claim 14

A base station, comprising:
radio interface circuitry; and
processing circuitry operatively coupled to the radio circuitry and configured to use the radio interface circuitry to:
configure the UE with an OOS Beam Failure Detection (BFD) threshold to be used by the UE to trigger a beam recovery preparation procedure when a number of out-of-synchronization (OOS) events generated by the UE while monitoring a reference signal reaches the OOS BFD threshold, the OOS BFD threshold being lower than an OOS Radio Link Monitoring (RLM) threshold used by the UE for starting a radio link failure (RLF) timer.

### Claim 15

A non-transitory computer-readable medium comprising, stored thereupon, computer program code for execution by a processing circuit of a user equipment (UE), the computer program code being configured to, upon execution by the processing circuit, cause the UE to:
generate an Out-Of-Synchronization (OOS) event each time a quality of a reference signal monitored by the UE is below a first threshold;
trigger a beam recovery preparation procedure when the number of OOS events reaches an OOS Beam Failure Detection (BFD) threshold, the OOS BFD threshold being lower than an OOS Radio Link Monitoring (RLM) threshold used by the UE for starting a radio link failure (RLF) timer.
