# US 2023/0274074 A1 · Generation of layout including power delivery network

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0274074 A1
- Document ID: US20230274074A1
- Status: Published application
- Kind: A1
- Application number: 18/312,835
- Filed: 2023-05-05
- Published: 2023-08-31
- Earliest claimed: 2020-05-28
- Assignees: Taiwan Semiconductor Manufacturing Company, Ltd.
- Applicants: Taiwan Semiconductor Manufacturing Co., Ltd.
- Inventors: Chung-Chieh YANG; Tai-Yi CHEN; Yun-Ru CHEN; Yung-Chow PENG
- Web page: https://patentgrep.com/patent/US20230274074A1

## CPC

- G06F 30/398: Design verification or optimisation, e.g. using design rule check [DRC], layout versus schematics [LVS] or finite element methods [FEM] (optical proximity correction [OPC] design processes G03F1/36)
- G06F 30/367: Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
- G06F 30/392: Floor-planning or layout, e.g. partitioning or placement
- G06F 30/3953: detailed
- G06F 30/373: Design optimisation
- G06F 2119/06: Power analysis or power optimisation
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A method is disclosed including: generating, based on design information for an integrated circuit, a circuit design that includes an initial power delivery network (PDN) for the integrated circuit; performing a pre-layout simulation to the circuit design that includes the initial power delivery network, to determine whether the circuit design meets a predetermined specification; generating a circuit layout of the integrated circuit when the circuit design meets the predetermined specification; modifying a pillar density of the initial power delivery network repeatedly when the circuit design does not meet the predetermined specification until the circuit design meets the predetermined specification to generate a circuit layout of the integrated circuit; and performing a post-layout simulation to the circuit layout.

## Claims

### Claim 1

A method, comprising:
generating, based on design information for an integrated circuit, a circuit design that includes an initial power delivery network (PDN) for the integrated circuit;
performing a pre-layout simulation to the circuit design that includes the initial power delivery network, to determine whether the circuit design meets a predetermined specification;
generating a circuit layout of the integrated circuit when the circuit design meets the predetermined specification;
modifying a pillar density of the initial power delivery network repeatedly when the circuit design does not meet the predetermined specification until the circuit design meets the predetermined specification to generate a circuit layout of the integrated circuit; and
performing a post-layout simulation to the circuit layout.

### Claim 2 (depends on 1)

The method of claim 1, wherein performing the post-layout simulation to the circuit layout comprises:
performing a voltage drop and electromigration verification process to the circuit layout.

### Claim 3 (depends on 1)

The method of claim 1, wherein performing the pre-layout simulation to the circuit design that includes the initial power delivery network comprises:
performing at least one of a voltage drop pre-check process or an electromigration pre-check process to the initial power delivery network.

### Claim 4 (depends on 3)

The method of claim 3, wherein performing the voltage drop pre-check process comprises:
performing a calculation of a voltage drop across power rails and conductive pillars that are coupled to the power rails of the initial power delivery network.

### Claim 5 (depends on 3)

The method of claim 3, wherein performing the electromigration pre-check process comprises:
performing a calculation of an electromigration current flowing through power rails and conductive pillars that are coupled to the power rails of the initial power delivery network.

### Claim 6 (depends on 1)

The method of claim 1, further comprising:
performing at least one of a voltage drop pre-check process or an electromigration pre-check process to a modified power delivery network.

### Claim 7 (depends on 1)

The method of claim 1, wherein modifying the pillar density of the initial power delivery network comprises:
adding at least one additional conductive pillar in the initial power delivery network when the pillar density of the initial power delivery network is not a maximum pillar density.

### Claim 8 (depends on 1)

The method of claim 1, wherein modifying the pillar density of the initial power delivery network comprises:
adding at least one additional power rail in the initial power delivery network when the pillar density of the initial power delivery network is a maximum pillar density.

### Claim 9 (depends on 1)

The method of claim 1, further comprising:
based on a power delivery network layout and the circuit layout of the integrated circuit, fabricating at least one component in the integrated circuit.

### Claim 10

A method, comprising:
performing at least one of a voltage drop pre-check process or an electromigration pre-check process to a circuit design that includes a power delivery network (PDN), wherein the power delivery network comprises a plurality of intra pillars and a plurality of major pillars;
generating, when the circuit design meets a predetermined specification during the at least one of the voltage drop pre-check process or the electromigration pre-check process, a circuit layout of a design layout for an integrated circuit to perform a voltage drop and electromigration verification process to the design layout; and
increasing a first number of the plurality of intra pillars and maintaining a second number of the plurality of major pillars when the circuit design does not meet the predetermined specification during the at least one of the voltage drop pre-check process or the electromigration pre-check process.

### Claim 11 (depends on 10)

The method of claim 10, wherein performing the voltage drop pre-check process comprises:
performing a calculation of a voltage drop across power rails and conductive pillars that are coupled to the power rails of the power delivery network, to determine whether the circuit design meets the predetermined specification,
wherein the conductive pillars comprise the plurality of intra pillars and the plurality of major pillars.

### Claim 12 (depends on 10)

The method of claim 10, wherein the plurality of intra pillars are coupled to a first power rail in a first layer.

### Claim 13 (depends on 12)

The method of claim 12, wherein the plurality of major pillars are coupled through the first power rail in the first layer to a second power rail in a second layer above the first layer.

### Claim 14 (depends on 10)

The method of claim 10, wherein performing the electromigration pre-check process comprises:
performing a calculation of an electromigration current flowing through power rails and conductive pillars that are coupled to the power rails of the power delivery network, to determine whether the circuit design meets the predetermined specification,
wherein the conductive pillars comprise the plurality of intra pillars and the plurality of major pillars.

### Claim 15 (depends on 14)

The method of claim 14, wherein performing the electromigration pre-check process further comprises:
when the circuit design does not meet the predetermined specification and a pillar density of the power delivery network is not a maximum pillar density,
increasing the pillar density of the power delivery network.

### Claim 16 (depends on 15)

The method of claim 15, wherein performing the electromigration pre-check process further comprises:
when the circuit design does not meet the predetermined specification and the pillar density of the power delivery network is the maximum pillar density,
modifying the power delivery network by adding at least one additional power rail in the power delivery network.

### Claim 17 (depends on 15)

The method of claim 15, wherein increasing the pillar density of the power delivery network comprises:
adding at least one additional conductive pillar in the power delivery network.

### Claim 18

A system, comprising:
a memory configured to store design information, for an integrated circuit, that includes parameters associated with power rails and conductive pillars that are coupled to the power rails; and
at least one processor in communication with the memory and configured to perform operations comprising:
performing a pre-layout simulation to a circuit design that includes a power delivery network, to determine whether the circuit design meets a predetermined specification;
generating, when voltage drop and electromigration requirements are met during a voltage drop and electromigration verification process, a final design layout for the integrated circuit;
when the circuit design does not meet the predetermined specification and a pillar density of the power delivery network is a maximum pillar density, adding at least one additional power rail in the power delivery network; and
after the at least one additional power rail is added, adding at least one additional conductive pillar in the power delivery network.

### Claim 19 (depends on 18)

The system of claim 18, wherein to perform the pre-layout simulation,
the at least one processor is configured to perform a calculation of a voltage drop across the power rails and the conductive pillars that are coupled to the power rails of the power delivery network.

### Claim 20 (depends on 18)

The system of claim 18, wherein to perform the pre-layout simulation,
the at least one processor is configured to perform a calculation of an electromigration current flowing through the power rails and the conductive pillars that are coupled to the power rails of the power delivery network.
