# US 2023/0273595 A1 · Application with flexible control loops for programming a building controller

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0273595 A1
- Document ID: US20230273595A1
- Status: Published application
- Kind: A1
- Application number: 18/313,175
- Filed: 2023-05-05
- Published: 2023-08-31
- Earliest claimed: 2020-06-22
- Assignees: Honeywell International Inc.
- Applicants: Honeywell International Inc.
- Inventors: Nagasree Poluri; Gutha Stalin Sanghamitra; Shriram Sankaran; Shreya Ratakonda
- Web page: https://patentgrep.com/patent/US20230273595A1

## CPC

- G05B 15/02: electric
- G05B 19/4155: characterised by program execution, i.e. part program or machine function execution, e.g. selection of a program
- G05B 2219/25011: Domotique, I-O bus, home automation, building automation
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A first building equipment to be controlled by a building controller is selected via a user interface from a plurality of predefined building equipment options and a first control loop for controlling the first building equipment is defined via the user interface by selecting from a plurality of predefined first control loop parameter options and one or more terminals of the building controller are assigned to the first control loop. A second building equipment to be controlled by the building controller is selected via the user interface from the plurality of predefined building equipment options and a second control loop for controlling the second building equipment is defined via the user interface by selecting from a plurality of predefined second control loop parameter options. One or more terminals of the building controller are assigned to the second control loop.

## Claims

### Claim 1

A method of programming a building controller to control building equipment of a building, the building controller having a plurality of terminals, the method comprising:
selecting via a user interface a first building equipment to be controlled by the building controller from a plurality of predefined building equipment options;
defining via the user interface a first control loop for controlling the first building equipment by selecting from a plurality of predefined first control loop parameter options, wherein one or more of the plurality of predefined first control loop parameter options includes an option to define a control parameter of the first control loop, wherein the control parameter of the first control loop includes one or more of: a throttle range, an integral time, a derivative time, an occupancy sensor offset delay and one or more schedule set points;
selecting via the user interface a second building equipment to be controlled by the building controller from the plurality of predefined building equipment options; and
defining via the user interface a second control loop for controlling the second building equipment by selecting from a plurality of predefined second control loop parameter options includes an option to define a control parameter of the second control loop.

### Claim 2 (depends on 1)

The method of claim 1, wherein the control parameter of the second control loop includes one or more of: a throttle range, an integral time, a derivative time, an occupancy sensor offset delay and one or more schedule set points.

### Claim 3 (depends on 2)

The method of claim 2, further comprising downloading the control parameter of the first control loop and the control parameter of the second control loop to the building controller.

### Claim 4 (depends on 1)

The method of claim 1, wherein the user interface is part of a mobile device.

### Claim 5 (depends on 1)

The method of claim 1, further comprises:
assigning one or more of the plurality of terminals of the building controller to the first control loop; and
assigning one or more of the plurality of terminals of the building controller to the second control loop.

### Claim 6 (depends on 5)

The method of claim 5, wherein the one or more of the plurality of terminals assigned to the second control loop include at least one terminal that is different from the one or more of the plurality of terminals assigned to the first control loop.

### Claim 7 (depends on 1)

The method of claim 1, wherein each of the plurality of terminals are a terminal type, wherein the terminal type is one or more of:
a universal IO (UIO) terminal type that is configurable to be two or more of an analog input terminal, a digital input terminal, analog output terminal and a digital output terminal;
a digital input (DI) terminal type; and
a digital output (DO) terminal type.

### Claim 8 (depends on 7)

The method of claim 7, wherein:
one or more of the plurality of predefined first control loop parameter options specifies the terminal type of an input terminal and/or the terminal type of an output terminal for use by the first control loop; and
one or more of the plurality of predefined second control loop parameter options specifies the terminal type of an input terminal and/or the terminal type of an output terminal for use by the second control loop.

### Claim 9 (depends on 5)

The method of claim 5, wherein the first control loop shares at least one terminal with the second control loop.

### Claim 10 (depends on 1)

The method of claim 1, wherein the plurality of predefined first control loop parameter options include a control loop type option, wherein the control loop type option is selectable from two or more of:
modulating control;
floating control;
pulse width modulating control;
digital control;
staging control; and
monitoring.

### Claim 11 (depends on 10)

The method of claim 10, wherein at least some of the plurality of predefined first control loop parameter options are dependent on the control loop type option that is selected.

### Claim 12 (depends on 1)

The method of claim 1, further comprising defining via the user interface a first schedule for the first control loop and a second schedule for the second control loop.

### Claim 13

A method of programming a building controller to control building equipment of a building, the building controller having a plurality of terminals, the method comprising:
selecting via a user interface a first building equipment to be controlled by the building controller from a plurality of predefined building equipment options;
defining via the user interface a first control loop for controlling the first building equipment by selecting from a plurality of predefined first control loop parameter options, wherein one or more of the plurality of predefined first control loop parameter options include a control loop type option, wherein the control loop type option includes one or more of floating control, pulse width modulating control, digital control and staging control;
selecting via the user interface a second building equipment to be controlled by the building controller from the plurality of predefined building equipment options; and
defining via the user interface a second control loop for controlling the second building equipment by selecting from a plurality of predefined second control loop parameter options.

### Claim 14 (depends on 13)

The method of claim 13, wherein the control loop type option is selected from two or more of modulating control, floating control, pulse width modulating control, digital control, staging control and monitoring only.

### Claim 15 (depends on 13)

The method of claim 13, wherein one or more of the plurality of predefined first control loop parameter options includes an option to define a control parameter of the first control loop, wherein the control parameter of the first control loop includes one or more of: a throttle range, an integral time, a derivative time, an occupancy sensor offset delay and one or more schedule set points.

### Claim 16 (depends on 13)

The method of claim 13, further comprises:
assigning one or more of the plurality of terminals of the building controller to the first control loop; and
assigning one or more of the plurality of terminals of the building controller to the second control loop.

### Claim 17 (depends on 16)

The method of claim 16, wherein the one or more of the plurality of terminals assigned to the second control loop include at least one terminal that is different from the one or more of the plurality of terminals assigned to the first control loop.

### Claim 18

A non-transient, computer-readable storage medium having stored thereon instructions that when executed by one or more processors of a mobile device, cause the one or more processors of the mobile device to:
accept a selection via a user interface of the mobile device a first building equipment to be controlled by a building controller from a plurality of predefined building equipment options;
accept input via the user interface of the mobile device that defines at least in part a first control loop for controlling the first building equipment by selecting from a plurality of predefined first control loop parameter options, wherein one or more of the plurality of predefined first control loop parameter options include a function type of the first control loop, wherein the function type is selected from two or more of an on/off control option, a dimming control option and a monitoring only option;
accept a selection via the user interface of the mobile device a second building equipment to be controlled by the building controller from the plurality of predefined building equipment options;
accept input via the user interface of the mobile device that defines a second control loop for controlling the second building equipment by selecting from a plurality of predefined second control loop parameter options; and
output the defined first control loop and the defined second control loop for execution on the building controller, such that the building controller controls the first building equipment in accordance with the first control loop and the second building equipment in accordance with the second control loop.

### Claim 19 (depends on 18)

The non-transient, computer-readable storage medium of claim 18, including instructions that when executed by one or more processors of the mobile device, cause the one or more processors of the mobile device to:
assign one or more of a plurality of terminals of the building controller to the first control loop; and
assign one or more of the plurality of terminals of the building controller to the second control loop.

### Claim 20 (depends on 18)

The non-transient, computer-readable storage medium of claim 18, wherein one or more of the plurality of predefined second control loop parameter options include a function type of the first control loop, wherein the function type is selected from two or more of an on/off control option, a dimming control option and a monitoring only option.