# US 2023/0273262 A1 · Battery capacity estimation apparatus and method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0273262 A1
- Document ID: US20230273262A1
- Status: Published application
- Kind: A1
- Application number: 18/018,019
- Filed: 2021-08-09
- Published: 2023-08-31
- Earliest claimed: 2020-08-13
- Assignees: LG Energy Solution, Ltd.
- Applicants: LG Energy Solution, Ltd.
- Inventors: Bo Mi LIM
- Web page: https://patentgrep.com/patent/US20230273262A1

## CPC

- G01R 31/388: involving voltage measurements
- G01R 31/392: Determining battery ageing or deterioration, e.g. state of health
- G01R 31/367: Software therefor, e.g. for battery testing using modelling or look-up tables
- G01R 31/3835: involving only voltage measurements
- G01R 31/396: Acquisition or processing of data for testing or for monitoring individual cells or groups of cells within a battery
- H01M 10/48: Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte (constructional details of current conducting connections for detecting conditions inside cells or batteries, e.g. details of voltage sensing terminals, H01M50/569)
- Y02E 60/10: Energy storage using batteries
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- H01M: PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A battery capacity estimation apparatus including a voltage measuring unit measuring a voltage of a battery cell, a filtering unit determining voltage data as first data when a logging pattern of the voltage data of the battery cell deviates from a preset reference range, a statistical analyzing unit determining second data through statistical analysis on the voltage data of the battery cell, and a capacity estimating unit estimating a capacity by applying data, classified by the filtering unit or the statistical analyzing unit for a battery cell that is a measurement target, to capacity estimation models generated separately for the first data and the second data.

## Claims

### Claim 1

A battery capacity estimation apparatus comprising:
a voltage measuring unit measuring a voltage of a battery cell;
a filtering unit determining voltage data as first data when a logging pattern of the voltage data of the battery cell deviates from a preset reference range;
a statistical analyzing unit determining second data through statistical analysis on the voltage data of the battery cell; and
a capacity estimating unit estimating a capacity of the battery cell by applying data, classified by the filtering unit or the statistical analyzing unit for the battery cell that is a measurement target, to capacity estimation models generated separately for the first data and the second data.

### Claim 2 (depends on 1)

The battery capacity estimation apparatus of claim 1, wherein the statistical analyzing unit performs statistical analysis on data other than data determined as the first data by the filtering unit.

### Claim 3 (depends on 1)

The battery capacity estimation apparatus of claim 1, wherein the statistical analyzing unit calculates differential data of the voltage of the battery cell with respect to a time.

### Claim 4 (depends on 3)

The battery capacity estimation apparatus of claim 3, wherein the statistical analyzing unit extracts a plurality of differential data as one principal component data by performing principal component analysis (PCA) on the plurality of differential data.

### Claim 5 (depends on 4)

The battery capacity estimation apparatus of claim 4, wherein the statistical analyzing unit calculates a plurality of clusters through k-means clustering on the principal component data and determines the differential data as the second data when the differential data is included in a preset cluster.

### Claim 6 (depends on 5)

The battery capacity estimation apparatus of claim 5, wherein the statistical analyzing unit determines differential data not included in the cluster as the first data.

### Claim 7 (depends on 1)

The battery capacity estimation apparatus of claim 1, wherein the capacity estimation model is a long short-term memory networks (LSTM) model.

### Claim 8 (depends on 1)

The battery capacity estimation apparatus of claim 1, wherein the voltage measuring unit measures a voltage for a rest period after charging or discharging of the battery cell.

### Claim 9 (depends on 1)

The battery capacity estimation apparatus of claim 1, wherein when at least one of a logging time and a number of voltage data of the battery cell deviates from the reference range, the filtering unit determines the voltage data as the first data.

### Claim 10 (depends on 1)

The battery capacity estimation apparatus of claim 1, wherein the first data is data in which the voltage data of the battery cell is in a discontinuous form, and the second data is data in which the voltage data of the battery cell is in a continuous form.

### Claim 11

A battery capacity estimation method comprising:
measuring a voltage of a battery cell;
determining voltage data as first data when a logging pattern of the voltage data of the battery cell deviates from a preset reference range;
determining second data through statistical analysis on the voltage data of the battery cell; and
estimating a capacity of the battery cell by applying the first data and the second data to capacity estimation models, respectively.

### Claim 12 (depends on 11)

The battery capacity estimation method of claim 11, further comprising calculating differential data of the voltage with respect to a time for the battery cell.

### Claim 13 (depends on 12)

The battery capacity estimation method of claim 12, further comprising extracting a plurality of differential data as one principal component data by performing principal component analysis (PCA) on the plurality of differential data.

### Claim 14 (depends on 13)

The battery capacity estimation method of claim 13, wherein the determining of the second data comprises calculating a plurality of clusters through k-means clustering on the principal component data and determining the differential data as the second data when the differential data is included in a preset cluster.

### Claim 15 (depends on 14)

The battery capacity estimation method of claim 14, further comprising determining differential data not included in the cluster as the first data.
