# US 2023/0272931 A1 · Systems and Methods for Controlling Rate of Change of Air Temperature in a Building

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0272931 A1
- Document ID: US20230272931A1
- Status: Published application
- Kind: A1
- Application number: 18/314,955
- Filed: 2023-05-10
- Published: 2023-08-31
- Earliest claimed: 2016-02-12
- Assignees: Goodman Manufacturing Company, L.P.
- Applicants: Goodman Manufacturing Company LP
- Inventors: Douglas Notaro; Adway Dogra
- Web page: https://patentgrep.com/patent/US20230272931A1

## CPC

- F24F 11/30: for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F 11/62: characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
- F24F 11/61: using timers
- F24F 2110/10: Temperature
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)

## Abstract

A system and method for controlling the air temperature in a building. The system includes one or more equipment of a heating ventilation and air-conditioning (HVAC) system, at least one of one or more thermostats or one or more temperature sensors, and a controller. The controller includes a communication module to exchange data with one or more devices and an equipment interface configured to communicate control signals to the one or more equipment. The controller is configured to obtain as user input a target rate of change (ROC) of air temperature in the building and operate the one or more equipment of the HVAC system to achieve the target ROC. The controller operates the one or more equipment at an initial capacity and adjusts the capacity of the one or more equipment to achieve the target ROC of the air temperature in the building.

## Claims

### Claim 1

A method for controlling air temperature in a building, comprising:
obtaining as user input a target rate of change (ROC) of air temperature to be achieved in the building; and
operating one or more equipment of a heating ventilation and air-conditioning (HVAC) system to achieve the target ROC, wherein operating the one or more equipment comprises:
operating the one or more equipment of the HVAC system at an initial capacity; and
adjusting the capacity at which the one or more equipment of the HVAC system operates to achieve the target ROC of the air temperature in the building.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
sampling the air temperature in the building at a plurality of sampling events according to a schedule; and
adjusting the capacity of the one or more equipment by:
increasing the capacity at which the one or more equipment operates by a first amount in response to detecting no change in the air temperature in a desired direction between two sampling events;
calculating a current ROC in the air temperature between the two sampling events in response to detecting a change in the air temperature in the desired direction; and
in response to calculating the current ROC:
increasing the capacity at which the one or more equipment operates by a second amount when the current ROC is less the target ROC; or
decreasing the capacity at which the one or more equipment operates by a third amount when the current ROC is same as or exceeds the target ROC.

### Claim 3 (depends on 2)

The method of claim 2, further comprising:
receiving a heating call or a cooling call from one or more thermostats configured to record the air temperature in the building; and
operating the one or more equipment of the HVAC system to achieve the target ROC, in response to the heating call or the cooling call.

### Claim 4 (depends on 3)

The method of claim 3, further comprising repeating the sampling and the adjusting steps until a heating call or a cooling call is removed.

### Claim 5 (depends on 4)

The method of claim 4, further comprising:
initializing a stabilization period in response to receiving the heating call or the cooling call; and
initialize the sampling after expiration of the stabilization period.

### Claim 6 (depends on 2)

The method of claim 2, wherein at least one of the first amount, the second amount or the third amount is a fixed percentage of a maximum capacity of the one or more equipment.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
operating the one or more equipment of the HVAC system by initializing a first equipment of the one or more equipment;
detecting that the capacity of the first equipment is set to equal or exceed a selected maximum capacity of the first equipment;
in response to the detecting, switching from operating the first equipment to operating a second equipment of the one or more equipment; and
adjusting the capacity at which the second equipment operates to achieve the target ROC of the air temperature in the building.

### Claim 8 (depends on 7)

The method of claim 7, further comprising:
detecting that the capacity of the second equipment is set to equal or less than a selected minimum capacity of the second equipment; and
in response, switching back to operating the first equipment.

### Claim 9 (depends on 1)

The method of claim 1, wherein the one or more equipment comprises at least one heating equipment capable of operating at a first plurality of capacities and at least one cooling equipment capable of operating at a second plurality of capacities.

### Claim 10

A system for controlling air temperature in a building, comprising:
one or more equipment associated with a heating ventilation and air-conditioning (HVAC) system; and
a controller communicatively coupled to the one or more equipment and configured to:
obtain as user input a target rate of change (ROC) of air temperature in the building; and
operate the one or more equipment of the HVAC system to achieve the target ROC.

### Claim 11 (depends on 10)

The system of claim 10, wherein the controller is configured to operate the one or more equipment by:
operating the one or more equipment of the HVAC system at an initial capacity; and
adjusting the capacity at which the one or more equipment of the HVAC system operates to achieve the target ROC of the air temperature in the building.

### Claim 12 (depends on 11)

The system of claim 11, wherein the controller is further configured to:
sample the air temperature in the building at a plurality of sampling events according to a schedule; and
adjust the capacity of the one or more equipment by:
increasing the capacity at which the one or more equipment operates by a first amount in response to detecting no change in the air temperature in a desired direction between two sampling events;
calculating a current ROC in the air temperature between the two sampling events in response to detecting a change in the air temperature in the desired direction; and
in response to calculating the current ROC:
increasing the capacity at which the one or more equipment operates by a second amount when the current ROC is less than the target ROC; or
decreasing the capacity at which the one or more equipment operates by a third amount when the current ROC is same as or exceeds the target ROC.

### Claim 13 (depends on 12)

The system of claim 12, wherein the controller is further configured to:
receive a heating call or a cooling call from one or more thermostats configured to record the air temperature in the building; and
operate the one or more equipment of the HVAC system to achieve the target ROC, in response to the heating call or the cooling call.

### Claim 14 (depends on 13)

The system of claim 13, wherein the controller is configured to repeat the sampling and the adjusting steps until the heating call or the cooling call is removed.

### Claim 15 (depends on 14)

The system of claim 14, wherein the controller is further configured to:
initialize a stabilization period in response to receiving the heating call or the cooling call; and
initialize the sampling after expiration of the stabilization period.

### Claim 16

A controller for controlling air temperature in a building, comprising:
an equipment interface configured to communicate control signals to one or more equipment of a heating ventilation and air-conditioning (HVAC) system to control operation of the one or more equipment;
a processor communicatively coupled to the equipment interface and configured to:
obtain as user input a target rate of change (ROC) of air temperature in the building; and
operate the one or more equipment of the HVAC system to achieve the target ROC.

### Claim 17 (depends on 16)

The controller of claim 16, wherein the processor is configured to operate the one or more equipment by:
operating the one or more equipment of the HVAC system at an initial capacity; and
adjusting the capacity at which the one or more equipment of the HVAC system operates to achieve the target ROC of the air temperature in the building.

### Claim 18 (depends on 17)

The controller of claim 17, wherein the processor is further configured to:
sample the air temperature in the building at a plurality of sampling events according to a schedule; and
adjust the capacity of the one or more equipment by:
increasing the capacity at which the one or more equipment operates by a first amount in response to detecting no change in the air temperature in a desired direction between two sampling events;
calculating a current ROC in the air temperature between the two sampling events in response to detecting a change in the air temperature in the desired direction; and
in response to calculating the current ROC:
increasing the capacity at which the one or more equipment operates by a second amount when the current ROC is less than the target ROC; or
decreasing the capacity at which the one or more equipment operates by a third amount when the current ROC is same as or exceeds the target ROC.

### Claim 19 (depends on 18)

The controller of claim 18, wherein the processor is further configured to:
receive a heating call or a cooling call from one or more thermostats configured to record the air temperature in the building; and
operate the one or more equipment of the HVAC system to achieve the target ROC, in response to the heating call or the cooling call.

### Claim 20 (depends on 19)

The controller of claim 19, wherein the processor is configured to repeat the sampling and the adjusting steps until the heating call or the cooling call is removed.
