# US 2023/0272707 A1 · Method for improving well integrity management for gas lift oil wells

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0272707 A1
- Document ID: US20230272707A1
- Status: Published application
- Kind: A1
- Application number: 17/682,719
- Filed: 2022-02-28
- Published: 2023-08-31
- Earliest claimed: 2022-02-28
- Assignees: Saudi Arabian Oil Company
- Applicants: Saudi Arabian Oil Company
- Inventors: Abdullah M. Al-Dhafeeri; Shebl Fouad Abo Zkry
- Web page: https://patentgrep.com/patent/US20230272707A1

## CPC

- E21B 47/117: Detecting leaks, e.g. from tubing, by pressure testing
- E21B 34/02: in well heads
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method for well integrity management on a well having at least one surface valve and a surface controlled sub-surface safety valve includes closing the at least one surface valve, applying a predetermined pressure to the at least one surface valve, analyzing a pressure loss across the at least one surface valve, and testing the surface controlled sub-surface safety valve for functionality. Functionality testing of the surface controlled sub-surface safety valve includes opening and closing the surface controlled sub-surface safety valve using a control panel. The method further includes classifying the well as operable or inoperable based on the pressure loss across the at least one surface valve and the functionality of the surface controlled sub-surface safety valve.

## Claims

### Claim 1

A method for well integrity management on a well having at least one surface valve and a surface controlled sub-surface safety valve, the method comprising:
closing the at least one surface valve;
applying a predetermined pressure to the at least one surface valve;
analyzing a pressure loss across the at least one surface valve;
testing the surface controlled sub-surface safety valve for functionality wherein the functionality comprises opening and closing the surface controlled sub-surface safety valve using a control panel; and
classifying the well as operable or inoperable based on the pressure loss across the at least one surface valve and the functionality of the surface controlled sub-surface safety valve.

### Claim 2 (depends on 1)

The method of claim 1,
wherein the well is operable when the pressure loss is equal to zero across every surface valve, and when the well is under full functionality of the surface controlled sub-surface safety valve.

### Claim 3 (depends on 1)

The method of claim 1,
wherein analyzing the pressure loss across the at least one surface valve further comprises detecting at least one failed surface valve and injecting the at least one failed surface valve with sealant.

### Claim 4 (depends on 3)

The method of claim 3,
wherein analyzing the pressure loss across the at least one surface valve further comprises applying the predetermined pressure to the at least one failed surface valve to analyze a subsequent pressure loss.

### Claim 5 (depends on 4)

The method of claim 4,
wherein the well is inoperable when the subsequent pressure loss is greater than zero across the at least one failed surface valve or when there is a loss in the functionality of the surface controlled sub-surface safety valve.

### Claim 6

A method for well integrity management on a well having at least one casing annulus, the method comprising:
analyzing an annulus pressure in the at least one casing annulus;
running a bleed down build up test on the at least one casing annulus;
analyzing a subsequent annulus pressure after the bleed down build up test;
determining a presence of fluid returns after the bleed down build up test; and
classifying the well as operable or inoperable based on the annulus pressure, the subsequent annulus pressure, and the fluid returns.

### Claim 7 (depends on 6)

The method of claim 6,
wherein the well is classified as inoperable when the annulus pressure of the at least one casing annulus is greater than a maximum allowable working operating pressure.

### Claim 8 (depends on 6)

The method of claim 6,
wherein the well is classified as operable when the annulus pressure of every casing annulus is less than an error pressure.

### Claim 9 (depends on 6)

The method of claim 6,
wherein running the bleed down build up test occurs on the at least one casing annulus having the annulus pressure between an error pressure and a maximum allowable working operating pressure.

### Claim 10 (depends on 9)

The method of claim 9,
wherein the well is classified as inoperable when the subsequent annulus pressure of the at least one casing annulus is greater than the error pressure.

### Claim 11 (depends on 9)

The method of claim 9,
wherein the well is classified as inoperable when the subsequent annulus pressure of the at least one casing annulus is less than the error pressure, and the at least one casing annulus has fluid returns.

### Claim 12 (depends on 9)

The method of claim 9,
wherein the well is classified as operable when the annulus pressure or the subsequent annulus pressure of every casing annulus is less than the error pressure, and every casing annulus does not have fluid returns.

### Claim 13

A method for well integrity management on a well having a tubing annulus, the method comprising:
analyzing an annulus pressure in the tubing annulus;
running a bleed down build up test on the tubing annulus;
analyzing a subsequent annulus pressure after the bleed down build up test;
determining a presence of fluid returns after the bleed down build up test;
running a communication test between the tubing annulus and a casing annulus; and
classifying the well as operable or inoperable based on the annulus pressure, the subsequent annulus pressure, the fluid returns, and the communication test.

### Claim 14 (depends on 13)

The method of claim 13,
wherein the well is classified as inoperable when the annulus pressure of the tubing annulus is greater than a maximum allowable working operating pressure.

### Claim 15 (depends on 13)

The method of claim 13,
wherein running the bleed down build up test occurs on the tubing annulus having the annulus pressure less than a maximum allowable working operating pressure.

### Claim 16 (depends on 15)

The method of claim 15,
wherein the communication test is run on the well with the tubing annulus having the subsequent annulus pressure greater than an error pressure.

### Claim 17 (depends on 15)

The method of claim 15,
wherein the communication test is run on the well with the tubing annulus having the subsequent annulus pressure less than an error pressure and having fluid returns.

### Claim 18 (depends on 15)

The method of claim 15,
wherein the well is classified as operable when the subsequent annulus pressure is less than an error pressure and there are no fluid returns.

### Claim 19 (depends on 13)

The method of claim 13,
wherein the well is classified as operable when the communication test is negative.

### Claim 20 (depends on 13)

The method of claim 13,
wherein the well is classified as inoperable when the communication test is positive.
