# US 2023/0267622 A1 · Object trail analytics

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0267622 A1
- Document ID: US20230267622A1
- Status: Published application
- Kind: A1
- Application number: 17/651,818
- Filed: 2022-02-21
- Published: 2023-08-24
- Earliest claimed: 2022-02-21
- Assignees: International Business Machines Corporation
- Applicants: International Business Machines Corporation
- Inventors: Jun Wang; Jing Xu; Wen Pei Yu; Lei Gao; Jin Wang; A PENG ZHANG
- Web page: https://patentgrep.com/patent/US20230267622A1

## CPC

- G06T 7/20: Analysis of motion (motion estimation for coding, decoding, compressing or decompressing digital video signals H04N19/43, H04N19/51)
- G06T 7/246: using feature-based methods, e.g. the tracking of corners or segments
- G08G 1/0133: {for classifying traffic situation}
- G08G 1/0141: {for traffic information dissemination}
- G06T 2207/10016: Video; Image sequence
- G06T 2207/10028: Range image; Depth image; 3D point clouds
- G06T 2207/30236: Traffic on road, railway or crossing
- G08G 1/0129: {for creating historical data or processing based on historical data}
- G06T: IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G08G: TRAFFIC CONTROL SYSTEMS (guiding railway traffic, ensuring the safety of railway traffic B61L; arrangement of road signs or traffic signals E01F9/00; radar or analogous systems, sonar systems, lidar systems specially adapted for traffic control G01S13/91, G01S15/88, G01S17/88; {radar or analogous systems, sonar systems, lidar systems specially adapted for anti-collision purposes G01S13/93, G01S15/93, G01S17/93})

## Abstract

A method, a structure, and a computer system for object trail analytics. The exemplary embodiments may include obtaining time series data detailing an average speed of one or more roads within a traffic network at one or more times. The exemplary embodiments may further include extracting one or more features corresponding to the time series data, and generating one or more time series forecasting models based on the time series data and the one or more features. Additionally, the exemplary embodiments may include identifying a current location of a moving object within the traffic network, and predicting a speed of the moving object based on applying the one or more time series forecasting models to the current location.

## Claims

### Claim 1

A computer-implemented method for object trail analytics, the method comprising:
obtaining time series data detailing an average speed of one or more roads within a traffic network at one or more times;
extracting one or more features corresponding to the time series data;
generating one or more time series forecasting models based on the time series data and the one or more features;
identifying a current location of a moving object within the traffic network; and
predicting a speed of the moving object based on applying the one or more time series forecasting models to the current location.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, further comprising:
estimating a time of arrival of the moving object at a next point of interest within the traffic network based on the speed of the moving object.

### Claim 3 (depends on 2)

The computer-implemented method of claim 2, further comprising:
determining whether an elapsed time is greater than a difference between a current time and the time of arrival; and
based on determining that the elapsed time is greater than the difference between the current time and the time of arrival, identifying the moving object in one or more adjacent roads to the current location within a specified timeframe.

### Claim 4 (depends on 3)

The computer-implemented method of claim 3,
based on determining that the elapsed time is not greater than the difference between the current time and the time of arrival, determining that the moving object has not yet reached the point of interest.

### Claim 5 (depends on 1)

The computer-implemented method of claim 1, wherein the one or more time series forecasting models correlate the average speed of the one or more roads at the one or more times with the one or more features detailing one or more road traffic impact factors.

### Claim 6 (depends on 1)

The computer-implemented method of claim 1, wherein the one or more features are selected from a group consisting of day, season, time, weather, and events.

### Claim 7 (depends on 6)

The computer-implemented method of claim 6, wherein the events are selected from a group consisting of road work, traffic accidents, and shows.

### Claim 8

A computer program product for object trail analytics, the computer program product comprising:
one or more non-transitory computer-readable storage media and program instructions stored on the one or more non-transitory computer-readable storage media capable of performing a method, the method comprising:
obtaining time series data detailing an average speed of one or more roads within a traffic network at one or more times;
extracting one or more features corresponding to the time series data;
generating one or more time series forecasting models based on the time series data and the one or more features;
identifying a current location of a moving object within the traffic network; and
predicting a speed of the moving object based on applying the one or more time series forecasting models to the current location.

### Claim 9 (depends on 8)

The computer program product of claim 8, further comprising:
estimating a time of arrival of the moving object at a next point of interest within the traffic network based on the speed of the moving object.

### Claim 10 (depends on 9)

The computer program product of claim 9, further comprising:
determining whether an elapsed time is greater than a difference between a current time and the time of arrival; and
based on determining that the elapsed time is greater than the difference between the current time and the time of arrival, identifying the moving object in one or more adjacent roads to the current location within a specified timeframe.

### Claim 11 (depends on 10)

The computer program product of claim 10,
based on determining that the elapsed time is not greater than the difference between the current time and the time of arrival, determining that the moving object has not yet reached the point of interest.

### Claim 12 (depends on 8)

The computer program product of claim 8, wherein the one or more time series forecasting models correlate the average speed of the one or more roads at the one or more times with the one or more features detailing one or more road traffic impact factors.

### Claim 13 (depends on 8)

The computer program product of claim 8, wherein the one or more features are selected from a group consisting of day, season, time, weather, and events.

### Claim 14 (depends on 13)

The computer program product of claim 13, wherein the events are selected from a group consisting of road work, traffic accidents, and shows.

### Claim 15

A computer system for object trail analytics, the system comprising:
one or more computer processors, one or more computer-readable storage media, and program instructions stored on the one or more of the computer-readable storage media for execution by at least one of the one or more processors capable of performing a method, the method comprising:
obtaining time series data detailing an average speed of one or more roads within a traffic network at one or more times;
extracting one or more features corresponding to the time series data;
generating one or more time series forecasting models based on the time series data and the one or more features;
identifying a current location of a moving object within the traffic network; and
predicting a speed of the moving object based on applying the one or more time series forecasting models to the current location.

### Claim 16 (depends on 15)

The computer system of claim 15, further comprising:
estimating a time of arrival of the moving object at a next point of interest within the traffic network based on the speed of the moving object.

### Claim 17 (depends on 16)

The computer system of claim 16, further comprising:
determining whether an elapsed time is greater than a difference between a current time and the time of arrival; and
based on determining that the elapsed time is greater than the difference between the current time and the time of arrival, identifying the moving object in one or more adjacent roads to the current location within a specified timeframe.

### Claim 18 (depends on 17)

The computer system of claim 17,
based on determining that the elapsed time is not greater than the difference between the current time and the time of arrival, determining that the moving object has not yet reached the point of interest.

### Claim 19 (depends on 15)

The computer system of claim 15, wherein the one or more time series forecasting models correlate the average speed of the one or more roads at the one or more times with the one or more features detailing one or more road traffic impact factors.

### Claim 20 (depends on 15)

The computer system of claim 15, wherein the one or more features are selected from a group consisting of day, season, time, weather, and events.
