# US 2023/0267594 A1 · Process of providing an interpreted borehole image

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0267594 A1
- Document ID: US20230267594A1
- Status: Published application
- Kind: A1
- Application number: 18/173,484
- Filed: 2023-02-23
- Published: 2023-08-24
- Earliest claimed: 2022-02-23
- Assignees: Schlumberger Technology Corporation
- Applicants: Schlumberger Technology Corporation
- Inventors: Alexis He; Bashar Qamhiyeh; Martin Carles; Laetitia Comparon; Nadege Bize-Forest; Isabelle Le Nir
- Web page: https://patentgrep.com/patent/US20230267594A1

## CPC

- G01V 3/38: Processing data, e.g. for analysis, for interpretation, for correction
- G06T 7/0004: {Industrial image inspection}
- E21B 47/0025: {generating an image of the borehole wall using down-hole measurements, e.g. acoustic or electric}
- E21B 7/04: Directional drilling
- E21B 2200/20: Computer models or simulations, e.g. for reservoirs under production, drill bits
- G01V 1/50: Analysing data
- G06T 2207/20081: Training; Learning
- G06T 2207/30181: Earth observation
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)
- G06T: IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

Process for interpreting one or more borehole images for use in drilling operations. In some embodiments, the process can include providing an input borehole image obtained from a downhole measurement provided by one or more downhole sensors. The process can also include collecting contextual information relative to the borehole image and the user. The process can also include using the collected contextual information and a mathematical model to infer one or more processing arguments. The mathematical model can be defined by using previously collected arguments and previously collected contextual information. The process can also include processing the input borehole image with the one or more inferred processing arguments to generate one or more interpreted borehole images. The process can also include adjusting one or more drilling operation based, at least in part, on the one or more interpreted borehole images.

## Claims

### Claim 1

A process, comprising:
providing an input borehole image obtained from a downhole measurement provided by one or more downhole sensors located within a borehole formed in a formation to a user;
collecting contextual information relative to the borehole image and the user;
using the collected contextual information and a mathematical model to infer one or more processing arguments, wherein the mathematical model is defined by using previously collected arguments and previously collected contextual information;
processing the input borehole image with the one or more inferred processing arguments to generate an interpreted borehole image; and
adjusting one or more drilling operations based at least in part on the interpreted borehole image.

### Claim 2 (depends on 1)

The process of claim 1, wherein the mathematical model includes a machine learning model.

### Claim 3 (depends on 1)

The process of claim 1, wherein the contextual information comprises a location of the borehole, a type of geological formation the borehole is located within, an orientation of the borehole, a feature of interest of the geological formation the borehole is located within, a user profile, or a combination thereof

### Claim 4 (depends on 1)

The process of claim 1, wherein the collected contextual information is obtained from the user.

### Claim 5 (depends on 4)

The process of claim 4, further comprising collecting arguments from the user.

### Claim 6 (depends on 5)

The process of claim 5, further comprising outputting the collected arguments when the contextual information is input by the user.

### Claim 7 (depends on 1)

The process of claim 1, wherein processing the input borehole image comprises performing a workflow comprising at least a first processing operation and a second processing operation, wherein the output of the first processing operation is used as an input of the second processing operation.

### Claim 8 (depends on 7)

The process of claim 7, wherein at least one of the one or more inferred processing arguments is used as an input to the second processing operation.

### Claim 9 (depends on 1)

The process of claim 1, wherein the one or more interpreted borehole images are obtained from the input downhole image without any user intervention.

### Claim 10 (depends on 1)

The process of claim 1, wherein the one or more downhole sensors include an acoustic sensor, a radiation sensor, a seismic sensor, an electromagnetic sensor, or a combination thereof.

### Claim 11 (depends on 1)

The process of claim 1, wherein the downhole sensor is lowered into the borehole with a logging while drilling tool, a wireline tool, or a slickline tool.

### Claim 12 (depends on 1)

The process of claim 1, further comprising determining one or more dips surrounding the borehole from the interpreted borehole image.

### Claim 13 (depends on 12)

The process of claim 12, wherein the determination of one or more dips surrounding the borehole infers a geological formation model to be used by the user to provide contextual information relative to the user.

### Claim 14 (depends on 1)

The process of claim 1, wherein the input borehole image is displayed on a display for the user to see and interpret.

### Claim 15 (depends on 14)

The process of claim 14, wherein at least a portion of the collected contextual information is provided by the user after viewing the input borehole image on the display.

### Claim 16 (depends on 1)

The process of claim 1, wherein the one or more drilling operations include complete and incomplete boreholes.

### Claim 17 (depends on 1)

The process of claim 1, wherein adjusting the one or more drilling operations comprises adjusting a drill path of the borehole to maintain the borehole within a topmost geological layer of the formation.

### Claim 18 (depends on 1)

The process of claim 1, wherein adjusting the one or more drilling operations comprises adjusting a drill path of the borehole to cause the borehole to intersect a naturally occurring fracture within the formation.

### Claim 19 (depends on 1)

The process of claim 1, wherein adjusting the one or more drilling operations comprises slowing down drilling, reducing a mud pressure, increasing a quantity of cement introduced into the borehole, and/or installing tubing within the borehole to prevent collapse.
