# US 2023/0267390 A1 · Systems and methods for optimizing the management of worksites

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0267390 A1
- Document ID: US20230267390A1
- Status: Published application
- Kind: A1
- Application number: 18/113,472
- Filed: 2023-02-23
- Published: 2023-08-24
- Earliest claimed: 2022-02-23
- Assignees: The Texas A&M University System
- Applicants: The Texas A&M University System
- Inventors: Xingyong Song; Abhishek Paramasivan
- Web page: https://patentgrep.com/patent/US20230267390A1

## CPC

- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G06Q 10/0633: Workflow analysis
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A computer implemented method for managing a worksite includes dividing by a worksite optimizer the worksite into a plurality of separate initial operating regions based on a set of input criteria, determining by the worksite optimizer a process chain to be performed by a plurality of machines located at the worksite, adjusting by the worksite optimizer the plurality of initial operating regions based on the process chain to define a plurality of separate final operating regions, and generating by the worksite optimizer a vehicle sequence for at least some of the machines located at the worksite using the plurality of final operating regions.

## Claims

### Claim 1

A computer implemented method for managing a worksite, the method comprising:
(a) dividing by a worksite optimizer the worksite into a plurality of separate initial operating regions based on a set of input criteria;
(b) determining by the worksite optimizer a process chain to be performed by a plurality of machines located at the worksite;
(c) adjusting by the worksite optimizer the plurality of initial operating regions based on the process chain to define a plurality of separate final operating regions; and
(d) generating by the worksite optimizer a vehicle sequence for at least some of the machines located at the worksite using the plurality of final operating regions.

### Claim 2 (depends on 1)

The method of claim 1, wherein the set of input criteria comprises a terrain map of the worksite, and a resource map of the worksite.

### Claim 3 (depends on 2)

The method of claim 2, further comprising:
(e) identifying by the worksite optimizer the identity and location of one or more target resources present at the worksite based on the resource map, and the location of drivable regions present at the worksite based on the terrain map.

### Claim 4 (depends on 1)

The method of claim 1, wherein (b) comprises temporarily ordering a plurality of separate processes accomplishable by the plurality of machines to produce a finished product of the worksite.

### Claim 5 (depends on 1)

The method of claim 1, wherein (c) comprises adjusting the plurality of initial operating regions based on the distribution of target resources present at the worksite.

### Claim 6 (depends on 1)

The method of claim 1, further comprising:
(e) executing by the worksite optimizer the vehicle sequence for at least some of the machines located at the worksite to produce a finished product of the worksite.

### Claim 7 (depends on 1)

The method of claim 1, wherein (d) comprises:
(d1) determining by the worksite optimizer both a specific cycle starting position and a specific cycle ending position at the worksite defining a cyclical trajectory therebetween for at least some of the plurality of machines.

### Claim 8 (depends on 7)

The method of claim 7, wherein (d) further comprises:
(d2) determining by the worksite optimizer a starting time corresponding to the cycle starting position and an ending time corresponding to the cycle ending position for at least some of the plurality of machines.

### Claim 9 (depends on 1)

The method of claim 1, further comprising:
(e) detecting by the worksite optimizer any potential collisions between the plurality of machines in response to executing the vehicle sequence; and
(f) adjusting by the worksite optimizer the vehicle sequence in response to detecting at least one potential collision between the plurality of machines in response to executing the vehicle sequence.

### Claim 10

A system for managing a worksite, the system comprising:
a processor;
a non-transitory memory; and
an application stored in the non-transitory memory that, when executed by the processor: <divides the worksite into a plurality of separate initial operating regions based on a set of input criteria;
determines a process chain to be performed by a plurality of machines located at the worksite;
adjusts the plurality of initial operating regions based on the process chain to define a plurality of separate final operating regions; and
generates a vehicle sequence for at least some of the machines located at the worksite using the plurality of final operating regions.

### Claim 11 (depends on 10)

The system of claim 10, wherein the application, when executed by the processor:
identifies the identity and location of one or more target resources present at the worksite based on a resource map of the worksite, and the location of drivable regions present at the worksite based on a terrain map of the worksite.

### Claim 12 (depends on 10)

The system of claim 10, wherein the application, when executed by the processor:
executes the vehicle sequence for at least some of the machines located at the worksite to produce a finished product of the worksite.

### Claim 13 (depends on 10)

The system of claim 10, wherein the application, when executed by the processor:
determines both a specific cycle starting position and a specific cycle ending position at the worksite defining a cyclical trajectory therebetween for at least some of the plurality of machines.

### Claim 14 (depends on 13)

The system of claim 13, wherein the application, when executed by the processor:
determines a starting time corresponding to the cycle starting position and an ending time corresponding to the cycle ending position for at least some of the plurality of machines.

### Claim 15 (depends on 13)

The system of claim 13, wherein the application, when executed by the processor:
detects any potential collisions between the plurality of machines in response to executing the vehicle sequence; and
adjusts the vehicle sequence in response to detecting at least one potential collision between the plurality of machines in response to executing the vehicle sequence.

### Claim 16

An automated worksite system, comprising:
a plurality of machines located at a worksite, each of the plurality of machines comprising a machine controller;
a worksite optimizer in signal communication with the machine controllers of the plurality of machines, wherein the worksite optimizer is configured to:
divide the worksite into a plurality of separate initial operating regions based on a set of input criteria;
determine a process chain to be performed by the plurality of machines located at the worksite;
adjust the plurality of initial operating regions based on the process chain to define a plurality of separate final operating regions;
generate a vehicle sequence for at least some of the machines located at the worksite using the plurality of final operating regions; and
instruct the machine controllers of the plurality of machines to execute the vehicle sequence.

### Claim 17 (depends on 16)

The system of claim 16, wherein at least one of the plurality of machines is configured to extract target resources present at the worksite and to transport the target resources across the worksite.

### Claim 18 (depends on 17)

The system of claim 17, wherein the execution of the vehicle sequence produces a finished product of the worksite from the target resources of the worksite.

### Claim 19 (depends on 16)

The system of claim 16, wherein the worksite optimizer is configured to identify the identity and location of one or more target resources present at the worksite based on a resource map of the worksite, and the location of drivable regions present at the worksite based on a terrain map of the worksite.

### Claim 20 (depends on 16)

The system of claim 16, wherein the worksite optimizer is configured to determine both a specific cycle starting position and a specific cycle ending position at the worksite defining a cyclical trajectory therebetween for at least some of the plurality of machines.