# US 2023/0267016 A1 · Synch manager for high availability controller

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0267016 A1
- Document ID: US20230267016A1
- Status: Published application
- Kind: A1
- Application number: 17/679,744
- Filed: 2022-02-24
- Published: 2023-08-24
- Earliest claimed: 2022-02-24
- Assignees: Schneider Electric Systems USA, Inc.
- Applicants: Schneider Electric Systems, USA Inc.
- Inventors: Subodh MUJUMDAR; Vishnuvardhan Rao DASARI; Vishal SAWARKAR; Krishnamohan BOTSA; Shahid ANSARI
- Web page: https://patentgrep.com/patent/US20230267016A1

## CPC

- G06F 9/52: Program synchronisation; Mutual exclusion, e.g. by means of semaphores
- G06F 9/4881: {Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues}
- G06F 9/54: Interprogram communication
- G06F 9/546: {Message passing systems or structures, e.g. queues}
- G06F 11/1658: {Data re-synchronization of a redundant component, or initial sync of replacement, additional or spare unit}
- G06F 11/2005: {using redundant communication controllers}
- G06F 11/2038: {with a single idle spare processing component}
- G06F 11/2097: {maintaining the standby controller/processing unit updated (initialisation or re-synchronisation thereof G06F11/1658 and subgroups)}
- G05B 9/03: with multiple-channel loop, i.e. redundant control systems
- G06F 2209/522: Manager
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A synchronization manager interface determines a first state of execution of an application task executing on a first controller at defined synchronization points and further determines a second state of execution of the application task executing on a second controller at the defined synchronization points. The synchronization manager interface, when executed, configures the first controller to transmit the first state from the first controller to the second controller via a communications channel established between the controllers for verifying a successful synchronization of the application task on the controllers based on a comparison of the first state with the second state.

## Claims

### Claim 1

A method of synchronizing corresponding application tasks executing on an active controller and on a standby controller, the active controller and the standby controller each configurable for use in an electrical substation, the method comprising:
identifying an application task executing on the active controller and the standby controller capable of synchronization;
defining, for the application task, one or more synchronization points at which execution of the application task is to be synchronized;
synchronizing execution of the application task on the active controller and the standby controller at each of the synchronization points;
determining a first state of execution of the application task executing on the active controller at the synchronization points;
transmitting the first state from the active controller to the standby controller via a communications channel established therebetween; and
verifying a successful synchronization of the application task on the active controller and the standby controller based on a comparison of the first state with a second state of execution of the application task executing on the standby controller at the synchronization points.

### Claim 2 (depends on 1)

The method of claim 1, further comprising executing an application programming interface for performing the determining, transmitting, and verifying.

### Claim 3 (depends on 1)

The method of claim 1, wherein executing the application programming interface initiates automatically at start-up.

### Claim 4 (depends on 1)

The method of claim 1, wherein executing the application programming interface initiates periodically at an interval defined by the application task.

### Claim 5 (depends on 1)

The method of claim 1, further comprising storing the first state in a transmit state table on the active controller and storing the second state in a receive state table on the standby controller.

### Claim 6 (depends on 5)

The method of claim 5, wherein verifying the successful synchronization comprises comparing the transmit state table and the receive state table and determining the transmit state table and the receive state table match each other.

### Claim 7 (depends on 1)

The method of claim 1, further comprising performing a synchronization of the application task on the active controller and the standby controller when the comparison of the first state and the second state indicate a need for synchronization.

### Claim 8 (depends on 7)

The method of claim 7, wherein performing the synchronization comprises transmitting one or more synchronization messages between the active controller and the standby controller via the communications channel.

### Claim 9 (depends on 8)

The method of claim 8, further comprising sharing minimal data between the active controller and the standby controller in response to the one or more synchronization messages.

### Claim 10 (depends on 8)

The method of claim 8, further comprising communicating a result of the synchronization, the result comprising at least one of Synch Success, Synch Failure, and Synch Timeout.

### Claim 11 (depends on 8)

The method of claim 8, wherein the communication channel comprises a low bandwidth communication channel on which the one or more synchronization messages are transmitted to achieve the synchronization and provide high availability capabilities.

### Claim 12 (depends on 1)

The method of claim 1, wherein the active controller and the standby controller integrate a process domain and a power domain of the industrial operation.

### Claim 13

A system comprising:
a first controller executing an application task having one or more defined synchronization points at which execution of the application task is to be synchronized, the first controller further executing a synchronization manager interface for determining a first state of execution of the application task executing on the first controller at the synchronization points;
a second controller executing the application task having the same one or more defined synchronization points as the application task executing on the first controller, the second controller further executing the synchronization manager interface for determining a second state of execution of the application task executing on the second controller at the synchronization points;
wherein the synchronization manager interface, when executed, configures the first controller to transmit the first state from the first controller to the second controller via a communications channel established therebetween for verifying a successful synchronization of the application task on the first controller and the second controller based on a comparison of the first state with the second state.

### Claim 14 (depends on 13)

The system of claim 13, wherein the synchronization manager interface initiates automatically at start-up.

### Claim 15 (depends on 13)

The system of claim 13, wherein the synchronization manager interface initiates periodically at an interval defined by the application task.

### Claim 16 (depends on 13)

The system of claim 13, wherein the first state is stored in a transmit state table on the first controller and the second state is stored in a receive state table on the second controller.

### Claim 17 (depends on 16)

The system of claim 16, wherein the synchronization manager interface verifies a successful synchronization when the transmit state table matches the receive state table.

### Claim 18 (depends on 13)

The system of claim 13, wherein one or more synchronization messages transmitted between the first controller and the second controller via the communications channel perform a synchronization.

### Claim 19 (depends on 18)

The system of claim 18, wherein the synchronization manager interface communicates a result of the synchronization, the result comprising at least one of Synch Success, Synch Failure, and Synch Timeout.

### Claim 20 (depends on 13)

The system of claim 13, wherein the communication channel comprises a low bandwidth communication channel on which one or more synchronization messages are transmitted to achieve the synchronization and provide high availability capabilities.