# US 2023/0267009 A1 · Machine-learning (ml)-based resource utilization prediction and management engine

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0267009 A1
- Document ID: US20230267009A1
- Status: Published application
- Kind: A1
- Application number: 17/676,362
- Filed: 2022-02-21
- Published: 2023-08-24
- Earliest claimed: 2022-02-21
- Assignees: Bank of America Corporation
- Applicants: Bank of America Corporation
- Inventors: Gopal Narayanan; Paparayudu Anaparti; Vishnu Vardhan Sarva; Sai Karthik Nanduri; Saikiran Gunti
- Web page: https://patentgrep.com/patent/US20230267009A1

## CPC

- G06F 9/5044: {considering hardware capabilities}
- G06F 9/4881: {Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues}
- G06F 9/5016: {the resource being the memory}
- G06F 18/214: Generating training patterns; Bootstrap methods, e.g. bagging or boosting
- G06N 20/00: Machine learning
- H04L 67/133: Protocols for remote procedure calls [RPC]
- G06F 2209/501: Performance criteria
- G06F 2209/5019: Workload prediction
- G06F 2209/503: Resource availability
- G06F 2209/508: Monitor
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

Systems and methods for optimizing resource utilization in a computing system are provided. Methods include compiling training data, running a machine-learning (ML) model using the training data to determine a set of resource parameters, receiving a request to schedule the computing job on the computing system, computing, for each of a plurality of potential runtimes, an amalgam distance value, selecting the potential runtime with the optimal distance value for scheduling the computing job, and generating a job execution schedule based on the selected potential runtime.

## Claims

### Claim 1

A machine-learning (ML)-based engine for optimizing resource utilization in a computing system, said engine comprising:
a processor;
a non-transitory memory storing computer executable instructions that, when run on the processor, are configured to:
compile training data, the training data comprising historical resource utilization information;
run an ML model using the training data to determine a set of resource parameters that are useful in predicting future resource utilization by a computing job on the computing system;
receive a request to schedule the computing job on the computing system;
compute, for each of a plurality of potential runtimes, a distance value, wherein the distance value:
represents a measurement of predicted resource utilization by the computing job on the computing system at the potential runtime; and
is an amalgam measurement across the set of resource parameters;
select the potential runtime with the optimal distance value for scheduling the computing job; and
generate a job execution schedule based on the selected potential runtime.

### Claim 2 (depends on 1)

The engine of claim 1 wherein the set of resource parameters are selected from a list comprising execution time, memory, processing power, remote procedure call (RPC) connection, number of files, and data volume.

### Claim 3 (depends on 1)

The engine of claim 1 further configured to run the ML model using the training data to determine a weighting multiplier for each resource parameter in the set of resource parameters for use in the computing of the distance values.

### Claim 4 (depends on 1)

The engine of claim 1 wherein each resource parameter in the set of resource parameters is associated with a dimension, and, to compute each distance value, the engine is further configured to:
assign each dimension a length; and
calculate a multidimensional Euclidean distance based on the lengths of the dimensions.

### Claim 5 (depends on 4)

The engine of claim 4 wherein, to assign each dimension a length, the engine is further configured to:
receive a first input representing previous resource utilizations of the resource parameter associated with the dimension;
receive a second input representing a resource utilization requirement at the potential runtime for the resource parameter associated with the dimension; and
calculate a difference between the first input and the second input, wherein the difference is the length.

### Claim 6 (depends on 4)

The engine of claim 4 wherein, to calculate the multidimensional Euclidean distance based on the lengths of the dimensions, the engine is further configured to take a square root of a sum of the lengths of the dimensions.

### Claim 7 (depends on 1)

The engine of claim 1 wherein the training data comprises historical information about resource utilization across the set of resource parameters for computing jobs analogous to the computing job that were run on the computing system over a predetermined period of time.

### Claim 8 (depends on 1)

The engine of claim 1 further configured to:
present the plurality of potential runtimes along with the distance values of the potential runtimes on a display of a computing device associated with a system administrator;
receive a selection of a potential runtime from the system administrator via the computing device; and
modify the job execution schedule based on the received selection.

### Claim 9 (depends on 1)

The engine of claim 1 further configured to compute distance values for a plurality of computing platforms within the computing system.

### Claim 10

A method for optimizing resource utilization in a computing system, the method comprising:
compiling training data, the training data comprising historical resource utilization information;
running a machine-learning (ML) model using the training data to determine a set of resource parameters that are useful in predicting future resource utilization by a computing job on the computing system;
receiving a request to schedule the computing job on the computing system;
computing, for each of a plurality of potential runtimes, a distance value, wherein the distance value:
represents a measurement of predicted resource utilization by the computing job on the computing system at the potential runtime; and
is an amalgam measurement across the set of resource parameters;
selecting the potential runtime with the optimal distance value for scheduling the computing job; and
generating a job execution schedule based on the selected potential runtime.

### Claim 11 (depends on 10)

The method of claim 10 wherein the set of resource parameters are selected from a list comprising execution time, memory, processing power, remote procedure call (RPC) connection, number of files, and data volume.

### Claim 12 (depends on 10)

The method of claim 10 further comprising running the ML model using the training data to determine a weighting multiplier for each resource parameter in the set of resource parameters for use in the computing of the distance values.

### Claim 13 (depends on 10)

The method of claim 10 wherein each resource parameter in the set of resource parameters is associated with a dimension, and the computing of each distance value comprises:
assigning each dimension a length; and
calculating a multidimensional Euclidean distance based on the lengths of the dimensions.

### Claim 14 (depends on 13)

The method of claim 13 wherein the assigning each dimension a length comprises:
receiving a first input representing previous resource utilizations of the resource parameter associated with the dimension;
receiving a second input representing a resource utilization requirement at the potential runtime for the resource parameter associated with the dimension; and
calculating a difference between the first input and the second input, wherein the difference is the length.

### Claim 15 (depends on 13)

The method of claim 13 wherein the calculating the multidimensional Euclidean distance based on the lengths of the dimensions comprises taking a square root of a sum of the lengths of the dimensions.

### Claim 16 (depends on 10)

The method of claim 10 wherein the training data comprises historical information about resource utilization across the set of resource parameters for computing jobs analogous to the computing job that were run on the computing system over a predetermined period of time.

### Claim 17 (depends on 10)

The method of claim 10 further comprising:
presenting the plurality of potential runtimes along with the distance values of the potential runtimes on a display of a computing device associated with a system administrator;
receiving a selection of a potential runtime from the system administrator via the computing device; and
modifying the job execution schedule based on the received selection.

### Claim 18 (depends on 10)

The method of claim 10 further comprising computing distance values for a plurality of computing platforms within the computing system.

### Claim 19

A machine-learning (ML) system with optimized resource utilization, said system comprising:
an ML model;
a processor;
a non-transitory memory storing computer executable instructions that, when run on the processor, are configured to:
compile training data, the training data comprising historical resource utilization information;
run the ML model using the training data to determine:
a set of resource parameters that are useful in predicting future resource utilization by a computing job on the system, wherein the set of resource parameters are selected from a list comprising execution time, memory, processing power, remote procedure call (RPC) connection, number of files, and data volume; and
a weighting multiplier for each resource parameter in the set of resource parameters;
receive a request to schedule the computing job on the system;
compute, for each of a plurality of potential runtimes, a distance value, wherein the distance value:
represents a measurement of predicted resource utilization by the computing job on the system at the potential runtime; and
is an amalgam measurement across the set of resource parameters, wherein the amalgam measurement is computed using the weighting multipliers;
select the potential runtime with the optimal distance value for scheduling the computing job; and
generate a job execution schedule based on the selected potential runtime.

### Claim 20 (depends on 19)

The system of claim 19 wherein each resource parameter in the set of resource parameters is associated with a dimension, and, to compute each distance value, the system is further configured to:
assign each dimension a length; and
calculate a multidimensional Euclidean distance based on the lengths of the dimensions;
wherein:
to assign each dimension a length, the system is further configured to:
receive a first input representing previous resource utilizations of the resource parameter associated with the dimension;
receive a second input representing a resource utilization requirement at the potential runtime for the resource parameter associated with the dimension; and
calculate a difference between the first input and the second input, wherein the difference is the length; and
to calculate the multidimensional Euclidean distance based on the lengths of the dimensions, the system is further configured to take a square root of a sum of the lengths of the dimensions.
