# US 2023/0264987 A1 · Ultrapure water production facility and method of replacing ion exchange resin

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0264987 A1
- Document ID: US20230264987A1
- Status: Published application
- Kind: A1
- Application number: 18/171,757
- Filed: 2023-02-21
- Published: 2023-08-24
- Earliest claimed: 2022-02-21
- Assignees: Samsung Electronics Co., Ltd.
- Applicants: Samsung Electronics Co., Ltd.
- Inventors: Yongjai LEE; Sanghoon Yoon; Huchul Lee; Byungchan Choi; Jieun Jang
- Web page: https://patentgrep.com/patent/US20230264987A1

## CPC

- C02F 1/42: by ion-exchange (ion-exchange in general B01J)
- C02F 9/00: Multistage treatment of water, waste water or sewage
- C02F 1/20: by degassing, i.e. liberation of dissolved gases (degasification of liquids in general B01D19/00; arrangement of degassing apparatus in boiler feed supply F22D)
- C02F 1/32: with ultraviolet light
- C02F 1/444: {by ultrafiltration or microfiltration}
- C02F 2001/427: {using mixed beds}
- C02F 2103/04: for obtaining ultra-pure water
- C02F 2201/005: Valves
- C02F 2209/20: Total organic carbon [TOC]
- C02F 2209/22: O2
- C02F 2209/44: Time
- C02F 2303/16: Regeneration of sorbents, filters
- C02F: TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE (separation in general B01D; special arrangements on waterborne vessels of installations for treating water, waste water or sewage, e.g. for producing fresh water, B63J; adding materials to water to prevent corrosion C23F; treating radioactively-contaminated liquids G21F9/04; regeneration of reactants for recirculation into processes, see the relevant places for the processes)

## Abstract

An ultrapure water (UPW) production facility includes a polisher filled with an ion exchange resin, an inflow line, an inflow valve connected to the inflow line and upstream of the polisher, an outflow line, an outflow valve connected to the outflow line and downstream of the polisher, a first drain line connected to the polisher, a first drain valve connected to the first drain line and downstream of the polisher, a second drain line branched from the outflow line, a second drain valve connected to the second drain line, a discharge line branched from the second drain line, a discharge valve connected to the discharge line, wherein the inflow valve, the outflow valve, the first drain valve, the second drain valve, and the outflow valve are automatic valves.

## Claims

### Claim 1

An ultrapure water (UPW) production facility comprising:
a polisher filled with an ion exchange resin;
an inflow line configured to allow water to be treated to flow into the polisher;
an inflow valve connected to the inflow line and upstream of the polisher;
an outflow line configured to allow water to be treated to flow out from the polisher;
an outflow valve connected to the outflow line and downstream of the polisher;
a first drain line connected to the polisher;
a first drain valve connected to the first drain line and downstream of the polisher;
a second drain line branched from the outflow line;
a second drain valve connected to the second drain line;
a discharge line branched from the second drain line;
a discharge valve connected to the discharge line,
wherein the inflow valve, the outflow valve, the first drain valve, the second drain valve, and the discharge valve are automatic valves.

### Claim 2 (depends on 1)

The UPW production facility of claim 1, further comprising: a connection line configured to connect the inflow line and the outflow line to a connection valve connected to the connection line.

### Claim 3 (depends on 2)

The UPW production facility of claim 2, wherein the connection valve is a manual valve.

### Claim 4 (depends on 1)

The UPW production facility of claim 1, further comprising: a sub-drain line branched from the outflow line and a sub-drain valve connected to the sub-drain line.

### Claim 5 (depends on 4)

The UPW production facility of claim 4, wherein the sub-drain valve is an automatic valve.

### Claim 6 (depends on 4)

The UPW production facility of claim 4, wherein the sub-drain line comprises a first sub-drain line branched from upstream of the outflow valve, a first sub-drain valve connected to the first sub-drain line, a second sub-drain line branched from downstream of the outflow valve, and a second sub-drain valve connected to the second sub-drain line, wherein the first sub-drain valve and the second sub-drain valve are automatic valves.

### Claim 7 (depends on 6)

The UPW production facility of claim 6, wherein the sub-drain line further comprises a third sub-drain line branched from upstream of the outflow valve and a third sub-drain valve connected to the third sub-drain line, wherein the third sub-drain valve is an automatic valve.

### Claim 8 (depends on 1)

The UPW production facility of claim 1, wherein the inflow valve and the outflow valve are control valves.

### Claim 9 (depends on 1)

The UPW production facility of claim 1, wherein a diameter of the first drain line has a smaller value than a value of a diameter of the second drain line.

### Claim 10

An ultrapure water (UPW) production facility comprising:
a polisher filled with an ion exchange resin;
an inflow line configured to allow water to be treated to flow into the polisher;
an inflow valve connected to the inflow line and upstream of the polisher;
an outflow line configured to allow the water to be treated to flow out from the polisher;
an outflow valve connected to the outflow line and downstream of the polisher;
a connection line configured to connect the inflow line and the outflow line;
a connection valve connected to the connection line;
a first drain line connected to the polisher and at a higher vertical level than a vertical level of the inflow line;
a first drain valve connected to the first drain line and downstream of the polisher;
a plurality of sub-drain lines branched from the outflow line and connected to the first drain line;
a plurality of sub-drain valves, connected to the plurality of sub-drain lines, respectively;
a second drain line branched from the outflow line;
a plurality of second drain valves connected to the second drain line;
a third drain line branched from the second drain line and at a higher vertical level than a vertical level of the second drain line;
a first discharge line branched from the second drain line and connected to the third drain line and a second discharge line branched from the first discharge line; and
a first discharge valve and a second discharge valve, connected to the first discharge line and the second discharge line, respectively,
wherein the inflow valve, the outflow valve, the first drain valve, the plurality of sub-drain valves, the plurality of second drain valves, the first discharge valve, and the second discharge valve are automatic valves, and the connection valve is a manual valve.

### Claim 11 (depends on 10)

The UPW production facility of claim 10, wherein the plurality of sub-drain lines comprises a first sub-drain line branched downstream of the outflow valve and a second sub-drain line branched from upstream of the outflow valve, and the plurality of sub-drain valves comprises a first sub-drain valve connected to the first sub-drain line and a second sub-drain valve connected to the second sub-drain line.

### Claim 12 (depends on 11)

The UPW production facility of claim 11, wherein the first sub-drain line is at a higher vertical level than a vertical level of the second sub-drain.

### Claim 13 (depends on 11)

The UPW production facility of claim 11, wherein the plurality of sub-drain lines further comprises a third sub-drain line branched from upstream of the outflow valve, at a lower vertical level than a vertical level of the first sub-drain line, and at a higher vertical level than a vertical level of the second sub-drain line.

### Claim 14

A method of replacing an ion exchange resin, the method comprising:
closing valves for preparing for replacement of the ion exchange resin filled in a polisher;
draining materials inside the polisher;
replacing the ion exchange resin;
cleaning the replaced ion exchange resin; and
preparing for an operation of the polisher,
wherein the cleaning of the replaced ion exchange resin comprises filling the polisher with water, performing a first cleaning process of cleaning the replaced ion exchange resin, and performing a second cleaning process of cleaning the ion exchange resin, and
wherein the draining, the cleaning, and the preparing are performed by an operation of an automatic valve.

### Claim 15 (depends on 14)

The method of claim 14, wherein the draining is performed for a period of time selected in a range of about 25 minutes to about 35 minutes.

### Claim 16 (depends on 14)

The method of claim 14, wherein the filling the polisher with water is performed for a period of time selected in a range of about 30 minutes to about 40 minutes.

### Claim 17 (depends on 14)

The method of claim 14, further comprising: measuring a concentration of total organic carbon (TOC) of the first cleaning water downstream of a second drain valve after the performing of the first cleaning process.

### Claim 18 (depends on 14)

The method of claim 14, wherein the first cleaning process is performed for a period of time selected in a range of about 5 minutes to about 10 minutes.

### Claim 19 (depends on 14)

The method of claim 14, further comprising: measuring concentrations of TOC and dissolved oxygen in the second cleaning water downstream of a second drain valve after the performing of the second cleaning process.

### Claim 20 (depends on 14)

The method of claim 14, wherein the preparing for the operation of the polisher comprises a first preparation operation, a second preparation operation, and a third preparation operation, and is performed for a period of time selected in a range of about 5 minutes to about 10 minutes.