Machine Learning Based Predictive P-F Curve Maintenance Optimization Platform and Associated Method
OwnerGary Josebeck, Arun Gowthaminventors
Life of this patent
Estimating the term…
Loading patent…
OwnerGary Josebeck, Arun Gowthaminventors
Estimating the term…
A reliability engineering software tool and associated method for scheduling maintenance events of at least one industrial asset comprises at least one identified physical mechanism of failure for the at least one asset and at least one identified precise evidence for each identified physical mechanism of failure for the at least one asset; a monitor for each identified precise evidence for each identified physical mechanism of failure for the at least one asset over time to obtain multiple inputs for each identified precise evidence for each identified physical mechanism of failure for the at least one asset; a machine learning based tool dynamically plotting a P-F curve based upon the monitoring of each identified precise evidence for each identified physical mechanism of failure for the at least one asset over time; and a schedule of maintenance events created based upon the dynamically plotted P-F curve of at least one asset.
A reliability engineering software tool for scheduling maintenance events of at least one industrial asset comprising:
A reliability engineering software method for scheduling maintenance events of at least one industrial asset comprising:
Dependencies are inferred from the claim text.