# US 2023/0156705 A1 · Method and device for quasi-static scheduling in wireless communication system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0156705 A1
- Document ID: US20230156705A1
- Status: Published application
- Kind: A1
- Application number: 18/154,420
- Filed: 2023-01-13
- Published: 2023-05-18
- Earliest claimed: 2020-08-06
- Assignees: Samsung Electronics Co., Ltd.
- Applicants: Samsung Electronics Co., Ltd.
- Inventors: Suha YOON; Seho MYUNG; Jeongho YEO; Euichang JUNG
- Web page: https://patentgrep.com/patent/US20230156705A1

## CPC

- H04W 72/0453: Resources in frequency domain, e.g. a carrier in FDMA
- H04W 72/1273: of downlink data flows
- H04L 1/18: Automatic repetition systems, e.g. Van Duuren systems
- H04L 5/00: Arrangements affording multiple use of the transmission path
- H04W 72/11: Semi-persistent scheduling
- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- H04W 72/232: the control data signalling from the physical layer, e.g. DCI signalling
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

The present disclosure relates to a 5th generation (5G) or pre-5G communication system for supporting higher data transmission rates than 4th generation (4G) communication systems such as Long Term Evolution (LTE). According to an embodiment according to the present disclosure, provided is a method performed in a communication system by a terminal. The method performed by the terminal operation may include receiving configuration information about semi-static scheduling; receiving downlink control information (DCI) through a physical downlink control channel (PDCCH); checking whether the DCI activates the semi-static scheduling; checking whether the semi-static scheduling is configured in a bandwidth part (BWP), indicated by a BWP indicator included in the DCI, when the semi-static scheduling is activated; and discarding the DCI when the semi-static scheduling is not configured in the BWP.

## Claims

### Claim 1

A method performed by a terminal in a communication system, the method comprising:
receiving configuration information on semi-static scheduling;
receiving downlink control information (DCI) through a physical downlink control channel (PDCCH);
determining whether the DCI activates semi-static scheduling;
based on determining that the semi-static scheduling is activated, determining whether the semi-static scheduling is configured to a bandwidth part (BWP) indicated by a BWP indicator included in the DCI; and
based on determining that the semi-static scheduling is not configured to the BWP, discarding the DCI.

### Claim 2 (depends on 1)

The method of claim 1, wherein determining whether the semi-static scheduling is configured to the BWP indicated by the BWP indicator included in the DCI comprises:
switching to the BWP indicated by the BWP indicator; and
determining whether the semi-static scheduling is configured to the switched BWP.

### Claim 3 (depends on 1)

The method of claim 1, further comprising activating the semi-static scheduling based on a cyclic redundancy check (CRC) of the DCI being scrambled based on a configured scheduling (CS)-radio network temporary identifier (RNTI), a value of a new data indicator (NDI) field included in the DCI being 0, and a hybrid automatic repeat request (HARD) process number field and a redundancy version field included in the DCI satisfying a predetermined condition.

### Claim 4 (depends on 1)

The method of claim 1, wherein the configuration information on the semi-static scheduling comprises at least one of semi-persistent scheduling (SPS) configuration information or ConfiguredGrant configuration information.

### Claim 5

A method performed by a base station in a communication system, the method comprising:
transmitting configuration information on semi-static scheduling;
transmitting downlink control information (DCI) through a physical downlink control channel (PDCCH);
determining, when the semi-static scheduling is activated, whether the semi-static scheduling is configured to a bandwidth part (BWP) indicated by a BWP indicator included in the DCI; and
skipping, based on determining that the semi-static scheduling is not configured to the BWP, an operation for the semi-static scheduling.

### Claim 6 (depends on 5)

The method of claim 5, wherein determining whether the semi-static scheduling is configured to the BWP indicated by the BWP indicator included in the DCI comprises:
switching to the BWP indicated by the BWP indicator; and
determining whether the semi-static scheduling is configured to the switched BWP.

### Claim 7 (depends on 5)

The method of claim 5, further comprising activating the semi-static scheduling based on a cyclic redundancy check (CRC) of the DCI being scrambled based on a configured scheduling (CS)-radio network temporary identifier (RNTI), a value of a new data indicator (NDI) field included in the DCI being 0, and a hybrid automatic repeat request (HARQ) process number field and a redundancy version field included in the DCI satisfying a predetermined condition, and
wherein the configuration information on the semi-static scheduling comprises at least one of semi-persistent scheduling (SPS) configuration information or ConfiguredGrant configuration information.

### Claim 8

A terminal of a communication system, the terminal comprising:
a transceiver; and
a controller configured to:
receive configuration information on semi-static scheduling through the transceiver,
receive downlink control information (DCI) through a physical downlink control channel (PDCCH) through the transceiver,
determine whether the DCI activates semi-static scheduling,
determine whether the semi-static scheduling is configured to a bandwidth part (BWP) indicated by a BWP indicator included in the DCI when the semi-static scheduling is activated, and
discard the DCI when the semi-static scheduling is not configured to the BWP.

### Claim 9 (depends on 8)

The terminal of claim 8, wherein the controller is configured to:
switch to the BWP indicated by the BWP indicator, and
determine whether the semi-static scheduling is configured to the switched BWP.

### Claim 10 (depends on 8)

The terminal of claim 8, wherein the semi-static scheduling is activated based on a cyclic redundancy check (CRC) of the DCI being scrambled based on a configured scheduling (CS)-radio network temporary identifier (RNTI), a value of a new data indicator (NDI) field included in the DCI being 0, and a hybrid automatic repeat request (HARQ) process number field and a redundancy version field included in the DCI satisfying a predetermined condition.

### Claim 11 (depends on 8)

The terminal of claim 8, wherein the configuration information on the semi-static scheduling comprises at least one of semi-persistent scheduling (SPS) configuration information or ConfiguredGrant configuration information.

### Claim 12

A base station of a communication system, the base station comprising:
a transceiver; and
a controller configured to:
transmit configuration information on semi-static scheduling through the transceiver,
transmit downlink control information (DCI) through a physical downlink control channel (PDCCH) through the transceiver,
determine whether the semi-static scheduling is configured to a bandwidth part (BWP) indicated by a BWP indicator included in the DCI based on the semi-static scheduling being activated, and
skip an operation for the semi-static scheduling based on the semi-static scheduling not being configured to the BWP.

### Claim 13 (depends on 12)

The base station of claim 12, wherein the controller is configured to:
switch to the BWP indicated by the BWP indicator, and
determine whether the semi-static scheduling is configured to the switched BWP.

### Claim 14 (depends on 12)

The base station of claim 12, wherein the semi-static scheduling is activated based on a cyclic redundancy check (CRC) of the DCI being scrambled based on a configured scheduling (CS)-radio network temporary identifier (RNTI), a value of a new data indicator (NDI) field included in the DCI being 0, and a hybrid automatic repeat request (HARQ) process number field and a redundancy version field included in the DCI satisfying a predetermined condition.

### Claim 15 (depends on 12)

The base station of claim 12, wherein the configuration information on the semi-static scheduling comprises at least one of semi-persistent scheduling (SPS) configuration information or ConfiguredGrant configuration information.
