# US 2023/0155414 A1 · Network for Distributing Electrical Energy

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0155414 A1
- Document ID: US20230155414A1
- Status: Published application
- Kind: A1
- Application number: 17/911,266
- Filed: 2021-04-27
- Published: 2023-05-18
- Earliest claimed: 2020-07-03
- Assignees: BKW Energie AG
- Applicants: BKW Energie AG
- Inventors: Monika FREUNEK
- Web page: https://patentgrep.com/patent/US20230155414A1

## CPC

- H02J 13/14: the power network being locally controlled, e.g. home energy management systems [HEMS]
- H02J 3/17: Demand-responsive operation of AC power transmission or distribution networks
- H02J 3/381: {Dispersed generators}
- H02J 3/0014: for preventing or reducing power oscillations in networks
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- Y02E 40/70: Smart grids as climate change mitigation technology in the energy generation sector
- Y04S 10/12: Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A network (1) for distributing electrical energy comprises a first network area (10) consisting of a plurality of local, self-regulating functional groups (11.1 . . . 8) having first sources, loads, lines and/or sensor, switching or converter components, wherein each of the functional groups (11.1 . . . 8) is designed for complying with assigned regulation limits for voltage quality variables in the network (1), and wherein the first network area (10) has a first size, and a second network area (20) having second sources, loads, lines and/or sensor, switching or converter components, wherein an estimated total variance of the voltage quality variables is assigned to the second network area (20), and wherein the second network area (20) has a second size. The regulation limits of the functional groups (11.1 . . . 8) and the first size are chosen such that, taking account of the second size and the estimated total variance, predefined target operating range limits for the entire network (1) are complied with.

## Claims

### Claim 1

A network for distributing electrical energy, comprising
a) a first network area, consisting of a plurality of local, self-regulating functional groups having first sources, loads, lines and/or sensor, switching or converter components, wherein each of the functional groups is designed for complying with assigned regulation limits for voltage quality variables in the network, and wherein the first network area has a first size;
b) a second network area having second sources, loads, lines and/or sensor, switching or converter components, wherein an estimated total variance of the voltage quality variables is assigned to the second network area, and wherein the second network area has a second size;
wherein the size of the first network area and the size of the second network area (20) are characterized on the basis of one of the following variables:
an average total amount of current in the network area;
a total power of the devices in the network area;
a total capacity of the devices in the network area;
a number of network components in the network area;
a covered area of the network area; and
wherein the regulation limits of the functional groups and the first size are chosen such that, taking account of the second size and the estimated total variance, predefined target operating range limits for the entire network are complied with.

### Claim 2 (depends on 1)

The network as claimed in claim 1, wherein the estimated total variance covers expected network operation during a time duration of at least one year.

### Claim 3 (depends on 1)

The network as claimed in claim 1, wherein at least one switching device in order to decouple the network from superordinate and/or coordinate further networks for distributing electrical energy.

### Claim 4 (depends on 1)

The network as claimed claim 1, characterized in that wherein a maximum extent of the functional groups is chosen such that a maximum signal propagation time within the functional groups is complied with.

### Claim 5 (depends on 1)

A computer-implemented method for structuring an existing network for distributing electrical energy, comprising as network components at least sources, loads, lines, sensor, switching and converter components, which are interconnected with one another in an initial topology, for creating a network as claimed in claim 1, comprising the following steps:
a) capturing the existing network within predefined system limits;
b) capturing regulation limits for local, self-regulating functional groups;
c) capturing target operating range limits for the structured network to be created;
d) carrying out an optimization of a target function by varying network properties, wherein
e) the variable network properties comprise at least one assignment of network components to one of a plurality of local functional groups of a first network area or an assignment of network components to a second network area,
f) a total variance of voltage quality variables is estimated for the second network area;
g) wherein what is predefined as boundary condition for the optimization is compliance with the target operating range limits, the checking of which is effected taking account of the regulation limits of the functional groups, a first size of the first network area and a second size of the second network area and the total variance of the second network area, wherein the size of the first network area and the size of the second network area are characterized on the basis of one of the following variables:
an average total amount of current in the network area;
a total power of the devices in the network area;
a total capacity of the devices in the network area;
a number of network components in the network area;
a covered area of the network area.

### Claim 6 (depends on 5)

The method as claimed in claim 5, wherein the total variance of the voltage quality variables for the second network area is estimated on the basis of historical operating data.

### Claim 7 (depends on 5)

The method as claimed in claim 5, wherein the variable network properties comprise a presence and/or a positioning of an additional switching device for selectively decoupling a part of the second network area and/or an additional device for power and/or voltage limiting.

### Claim 8 (depends on 5)

The method as claimed in claim 5, wherein the variable network properties comprise a presence and/or a positioning of an additional storage installation and/or an additional production installation.

### Claim 9 (depends on 5)

The method as claimed in claim 5, wherein the variable network properties comprise an extension of the predefined system limits.

### Claim 10 (depends on 9)

The method as claimed in claim 9, wherein during the process of capturing the existing network, the predefined system limits are chosen such that the network encompassed already complies with the target operating range limits, after which the system limits are iteratively extended until compliance is no longer possible or other boundary conditions are contravened.

### Claim 11 (depends on 5)

The method as claimed in claim 5, wherein maximum communication times between a plurality of functional groups are predefined as further boundary condition for the optimization.

### Claim 12 (depends on 5)

The method as claimed in claim 5, wherein the target function is dependent on a volume of data transferred between the network components for regulating the network, and in that the optimization fosters a minimization of said volume of data.

### Claim 13 (depends on 5)

The method as claimed in claim 5, wherein the target function is dependent on costs of an adaptation between the existing network and the structured network to be created, and in that the numerical optimization fosters a minimization of said costs.

### Claim 14

A computer-implemented method for operating a network for distributing electrical energy, comprising the following steps:
a) in a first network area, operating a plurality of local, self-regulating functional groups having first sources, loads, lines and/or sensor, switching or converter components, such that each of the functional groups complies with assigned regulation limits for voltage quality variables in the network;
b) operating second sources, loads, lines and/or sensor, switching or converter components of a second network area, such that a total variance of voltage quality variables in the second network area is complied with;
wherein
c) the first network area has a first size and the second network area has a second size, wherein the size of the first network area and the size of the second network area are characterized on the basis of one of the following variables:
an average total amount of current in the network area;
a total power of the devices in the network area;
a total capacity of the devices in the network area;
a number of network components in the network area;
a covered area of the network area; and wherein
e) the regulation limits of the functional groups and the first size are chosen such that, taking account of the second size and the total variance, predefined target operating range limits for the entire network comprising first and second network area are complied with.

### Claim 15 (depends on 14)

The method as claimed in claim 14, wherein compliance with the predefined target operating range limits is monitored and at least one device for limiting a power fed to the functional groups is actuated in the case of non-compliance with the target operating range limits.

### Claim 16 (depends on 15)

The method as claimed in claim 15, wherein at least one switching device for decoupling the network from superordinate and/or coordinate further networks for distributing electrical energy and/or at least one switching device for decoupling a part of the second network area are/is actuated in the case of non-compliance with the target operating range limits.

### Claim 17 (depends on 5)

A computer program for carrying out the method as claimed in claim 5.

### Claim 18 (depends on 14)

A computer program for carrying out the method as claimed in claim 14.