# US 2023/0144462 A1 · Battery bank unit, remaining charge time calculation method, and remaining charge time calculation program

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0144462 A1
- Document ID: US20230144462A1
- Status: Published application
- Kind: A1
- Application number: 18/051,617
- Filed: 2022-11-01
- Published: 2023-05-11
- Earliest claimed: 2021-11-05
- Assignees: Fdk Corporation
- Applicants: Fdk Corporation
- Inventors: Shun MOCHIZUKI; Kenji KITAMURA; Yasuyuki KATSUBE
- Web page: https://patentgrep.com/patent/US20230144462A1

## CPC

- H01M 10/443: {in response to temperature}
- G01R 31/3648: {comprising digital calculation means, e.g. for performing an algorithm}
- G01R 31/367: Software therefor, e.g. for battery testing using modelling or look-up tables
- H01M 10/441: {for several batteries or cells simultaneously or sequentially}
- H01M 10/482: {for several batteries or cells simultaneously or sequentially}
- H01M 10/486: {for measuring temperature}
- H02J 7/50: acting upon multiple batteries simultaneously or sequentially
- H02J 7/585: {Sequential battery discharge in systems with a plurality of batteries}
- H02J 7/92: with prioritisation of loads or sources
- H02J 7/96: in response to battery voltage
- H02J 7/977: {of the battery}
- G01R 31/396: Acquisition or processing of data for testing or for monitoring individual cells or groups of cells within a battery
- H01M 10/0445: {Multimode batteries, e.g. containing auxiliary cells or electrodes switchable in parallel or series connections}
- H01M 10/44: Methods for charging or discharging (circuits for charging H02J7/00)
- H01M 10/48: Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte (constructional details of current conducting connections for detecting conditions inside cells or batteries, e.g. details of voltage sensing terminals, H01M50/569)
- H01M 50/512: Connection only in parallel
- H01M 2010/4271: {Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing}
- H02J 7/80: including monitoring or indicating arrangements
- H02J 7/82: Control of state of charge [SOC]
- H02J 7/825: {Detection of fully charged condition}
- H02J 7/855: {with circuits adapted for supplying loads from the battery}
- H02J 2207/20: Charging or discharging characterised by the power electronics converter
- Y02E 60/10: Energy storage using batteries
- H01M: PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A battery bank unit includes: a first battery bank and a second battery bank that are connected in parallel to each other; and a control apparatus that performs collective charge for collectively charging the first battery bank and the second battery bank, performs first bank charge for charging only the first battery bank after the collective charge, and performs second bank charge for charging only the second battery bank after the first bank charge. The control apparatus calculates remaining time to complete charge of the battery bank unit based on a temperature of the battery bank unit at a start of the collective charge.

## Claims

### Claim 1

A battery bank unit, comprising:
a first battery bank and a second battery bank that are connected in parallel to each other; and
a control apparatus that performs collective charge for collectively charging the first battery bank and the second battery bank, performs first bank charge for charging only the first battery bank after the collective charge, and performs second bank charge for charging only the second battery bank after the first bank charge, wherein,
the control apparatus calculates remaining time to complete charge of the battery bank unit based on a temperature of the battery bank unit at a start of the collective charge.

### Claim 2 (depends on 1)

The battery bank unit according to claim 1, wherein,
the control apparatus:
is configured to acquire information from a table in which a temperature, collective charge time, first bank charge time, and second bank charge time are associated with each other, the collective charge time being time required for the collective charge, the first bank charge time being time required from a start of the first bank charge to a start of the second bank charge, the second bank charge time being time required from the start of the second bank charge to completion of the charge of the battery bank unit, and
calculates the remaining time based on the collective charge time, the first bank charge time, and the second bank charge time that are associated with a temperature of the battery bank unit at the start of the collective charge, and on the temperature of the battery bank unit at the start of the collective charge.

### Claim 3 (depends on 2)

The battery bank unit according to claim 2, wherein the control apparatus updates the table based on actual collective charge time, actual first bank charge time, and actual second bank charge time, the actual collective charge time being time actually spent from the start of the collective charge to the start of the first bank charge, the actual first bank charge time being time actually spent from the start of the first bank charge to the start of the second bank charge, the actual second bank charge time being time actually spent from the start of the second bank charge to the completion of the charge of the battery bank unit.

### Claim 4 (depends on 3)

The battery bank unit according to claim 3, wherein the control apparatus corrects the remaining time during the charge of the battery bank unit based on at least one of the actual collective charge time and/or the actual first bank charge time.

### Claim 5 (depends on 2)

The battery bank unit according to claim 2, wherein,
the table stores a voltage drop amount in association with the temperature, the voltage drop amount being an amount of voltage drop while charge of the first battery bank is stopped, and
the control apparatus:
stops the charge of the first battery bank until the second bank charge is started after the first battery bank is fully charged in the first bank charge,
calculates first charge stop time, when a temperature of the first battery bank becomes equal to or lower than a predetermined determination temperature, based on the voltage drop amount associated with the temperature of the battery bank unit when the temperature of the first battery bank becomes equal to or lower than the determination temperature, the first charge stop time being time required from when the temperature of the first battery bank becomes equal to or lower than the determination temperature to when the second bank charge is started, and
corrects the remaining time based on the first charge stop time.

### Claim 6 (depends on 2)

The battery bank unit according to claim 2, wherein,
the control apparatus:
stops charge of the first battery bank until the second bank charge is started after the first battery bank is fully charged in the first bank charge,
calculates an actual drop amount of a voltage value of the first battery bank while the charge of the first battery bank is stopped in the first bank charge,
calculates second charge stop time based on the actual drop amount when the actual drop amount becomes equal to or less than a predetermined amount, the second charge stop time being time required from when the actual drop amount becomes equal to or less than the predetermined amount to when the second bank charge is started, and
corrects the remaining time based on the second charge stop time.

### Claim 7

A remaining charge time calculation method for a computer to calculate remaining time to complete charge of a battery bank unit, the charge including collective charge for collectively charging a first battery bank and a second battery bank connected in parallel to the first battery bank, first bank charge for charging only the first battery bank after the collective charge, and second bank charge for charging only the second battery bank after the first bank charge, the method comprising:
acquiring a temperature of the battery bank unit at a start of the collective charge; and
calculating the remaining time based on the temperature of the battery bank unit.

### Claim 8

A remaining charge time calculation program stored in a non-transitory storage medium, wherein, when the program is executed by a computer that controls a battery bank unit for which collective charge for collectively charging a first battery bank and a second battery bank connected in parallel to the first battery bank is performed, first bank charge for charging only the first battery bank is performed after the collective charge, and second bank charge for charging only the second battery bank is performed after the first bank charge, the program is configured to cause the computer to perform operations comprising:
acquiring a temperature of the battery bank unit at a start of the collective charge; and
calculating remaining time to complete charge of the battery bank unit based on the temperature of the battery bank unit.