# US 2023/0099182 A1 · Structural engineering dominated geotechnical structured permanent supporting system and design method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0099182 A1
- Document ID: US20230099182A1
- Status: Published application
- Kind: A1
- Application number: 17/815,060
- Filed: 2022-07-26
- Published: 2023-03-30
- Earliest claimed: 2021-09-30
- Assignees: Shandong University
- Applicants: Shandong University
- Inventors: Lianxiang LI; Shengqun LI; Yupo PAN; Jianxin ZHU; Wen LI; Fengbin SU; Rui ZHANG; Zhaohui ZHANG; Zhanxian LI
- Web page: https://patentgrep.com/patent/US20230099182A1

## CPC

- E02D 17/04: Bordering {surfacing} or stiffening the sides of foundation pits
- E02D 17/12: Back-filling of foundation trenches or ditches {(apparatus therefor E02F5/12, E02F5/22)}
- E02D 29/05: at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}

## Abstract

The present disclosure provides a structural engineering dominated geotechnical structured permanent supporting system and a design method, and belongs to the technical field of underground structures. Through the technical solutions, the structural engineering dominated geotechnical structured permanent supporting system comprises a supporting structure designed on the basis of the partial coefficient of a permanent load, the supporting structure is connected to frame columns of a main structure through a plurality of connecting members arranged at intervals, and a partition wall for blocking soil mass is arranged between every two adjacent frame columns to form a permanent supporting system only bearing soil pressure in the horizontal direction of the supporting structure. When the system is designed, the combined action generated after the main structure and the supporting structure are connected is considered, so that the use of materials is reduced, and the cost is reduced.

## Claims

### Claim 1

A structural engineering dominated geotechnical structured permanent supporting system, comprising a supporting structure designed on the basis of the partial coefficient of a permanent load, wherein the supporting structure is connected to frame columns of a main structure through a plurality of connecting members arranged at intervals, and a partition wall for blocking soil mass is arranged between every two adjacent frame columns to form a permanent supporting system only bearing soil pressure in the horizontal direction of the supporting structure.

### Claim 2 (depends on 1)

The structural engineering dominated geotechnical structured permanent supporting system according to claim 1, wherein backfilled soil is filled between the partition wall and the supporting structure.

### Claim 3 (depends on 1)

The structural engineering dominated geotechnical structured permanent supporting system according to claim 1, wherein the material strength of the supporting structure is the same as or higher than that of the main structure.

### Claim 4 (depends on 1)

The structural engineering dominated geotechnical structured permanent supporting system according to claim 1, wherein the backfilled soil is rammed backfilled soil, and the side, away from the backfilled soil, of the supporting structure is natural soil.

### Claim 5 (depends on 1)

A design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 1, comprising the following steps:
designing the supporting structure according to the partial coefficient of the permanent load in advance; designing the main structure without a basement exterior wall, and designing the connecting members;
constructing the supporting structure, excavating the soil inside a foundation pit and treating a substrate;
constructing the main structure, and connecting the main structure with the supporting structure through the connecting members; and
constructing the partition walls in grooves, and then backfilling soil mass in the grooves.

### Claim 6 (depends on 5)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 5, wherein when the supporting structure is designed, considering the influence of the combined action of the main structure and the supporting structure in later period, the main structure can bear the soil pressure permanently.

### Claim 7 (depends on 6)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 6, wherein based on the design of the main structure, the supporting structure is designed in cooperation with the main structure.

### Claim 8 (depends on 5)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 5, wherein the inner side of the supporting structure, the outer side of the partition wall and the connecting member are all subjected to waterproof and antiseptic treatment.

### Claim 9 (depends on 5)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 5, wherein after the soil mass in the grooves is backfilled, the backfilled soil is compacted in layers.

### Claim 10 (depends on 5)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 5, wherein the supporting members of the supporting structure are supporting piles or underground continuous walls.

### Claim 11 (depends on 2)

The structural engineering dominated geotechnical structured permanent supporting system according to claim 2, wherein the material strength of the supporting structure is the same as or higher than that of the main structure.

### Claim 12 (depends on 4)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 4, wherein backfilled soil is filled between the partition wall and the supporting structure.

### Claim 13 (depends on 4)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 4, wherein the material strength of the supporting structure is the same as or higher than that of the main structure.

### Claim 14 (depends on 5)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 5, wherein the material strength of the supporting structure is the same as or higher than that of the main structure.

### Claim 15 (depends on 4)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 4, wherein the backfilled soil is rammed backfilled soil, and the side, away from the backfilled soil, of the supporting structure is natural soil.

### Claim 16 (depends on 12)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 12, wherein when the supporting structure is designed, considering the influence of the combined action of the main structure and the supporting structure in later period, the main structure can bear the soil pressure permanently.

### Claim 17 (depends on 13)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 13, wherein when the supporting structure is designed, considering the influence of the combined action of the main structure and the supporting structure in later period, the main structure can bear the soil pressure permanently.

### Claim 18 (depends on 14)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 14, wherein when the supporting structure is designed, considering the influence of the combined action of the main structure and the supporting structure in later period, the main structure can bear the soil pressure permanently.

### Claim 19 (depends on 15)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 15, wherein when the supporting structure is designed, considering the influence of the combined action of the main structure and the supporting structure in later period, the main structure can bear the soil pressure permanently.

### Claim 20 (depends on 16)

The design method of the structural engineering dominated geotechnical structured permanent supporting system according to claim 16, wherein based on the design of the main structure, the supporting structure is designed in cooperation with the main structure.