# US 2023/0097893 A1 · Collective vehicle power management

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0097893 A1
- Document ID: US20230097893A1
- Status: Published application
- Kind: A1
- Application number: 17/477,834
- Filed: 2021-09-17
- Published: 2023-03-30
- Earliest claimed: 2021-09-17
- Assignees: Ford Global Technologies, LLC
- Applicants: Ford Global Technologies, LLC
- Inventors: Stuart C. Salter; William H. Wurz; Ryan O'Gorman; Zeljko Deljevic; Peter Phung
- Web page: https://patentgrep.com/patent/US20230097893A1

## CPC

- B60L 53/62: in response to charging parameters, e.g. current, voltage or electrical charge
- B60L 53/14: Conductive energy transfer
- B60L 53/35: Means for automatic or assisted adjustment of the relative position of charging devices and vehicles
- B60L 53/68: Off-site monitoring or control, e.g. remote control
- B60L 58/12: responding to state of charge [SoC]
- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G06Q 10/06313: {Resource planning in a project environment}
- G06Q 10/06317: {Resource planning based on arrival predictions or arrival tracking}
- G07C 3/00: Registering or indicating the condition or the working of machines or other apparatus, other than vehicles
- G07C 5/008: {communicating information to a remotely located station (transmission systems for measured values G08C)}
- B60K 6/28: characterised by the electric energy storing means, e.g. batteries or capacitors
- B60Y 2200/91: Electric vehicles
- B60Y 2200/92: Hybrid vehicles
- B60Y 2300/91: Battery charging
- G05B 2219/21109: Field programmable gate array, fpga as I-O module
- G05B 2219/2637: Vehicle, car, auto, wheelchair
- Y02T 10/70: Energy storage systems for electromobility, e.g. batteries
- Y02T 10/7072: Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
- Y02T 90/12: Electric charging stations
- B60L: PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES (arrangements or mounting of electrical propulsion units or of plural diverse prime-movers for mutual or common propulsion in vehicles B60K1/00, B60K6/20; arrangements or mounting of electrical gearing in vehicles B60K17/12, B60K17/14; preventing wheel slip by reducing power in rail vehicles B61C15/08; dynamo-electric machines H02K; control or regulation of electric motors H02P); SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES (electric coupling devices combined with mechanical couplings of vehicles B60D1/64; electric heating for vehicles B60H1/00); ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL (control or regulation of electric motors H02P); MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G07C: TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- B60K: ARRANGEMENT OR MOUNTING OF PROPULSION UNITS OR OF TRANSMISSIONS IN VEHICLES; ARRANGEMENT OR MOUNTING OF PLURAL DIVERSE PRIME-MOVERS IN VEHICLES; AUXILIARY DRIVES FOR VEHICLES; INSTRUMENTATION OR DASHBOARDS FOR VEHICLES; ARRANGEMENTS IN CONNECTION WITH COOLING, AIR INTAKE, GAS EXHAUST OR FUEL SUPPLY OF PROPULSION UNITS IN VEHICLES
- B60Y: INDEXING SCHEME RELATING TO ASPECTS CROSS-CUTTING VEHICLE TECHNOLOGY
- Y02T: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION

## Abstract

A computer includes a processor and a memory storing instructions executable by the processor to receive data indicating a plurality of tasks to be performed at a site by a plurality of electric machines, receive charge statuses of the electric machines and of a plurality of first electric vehicles at the site, and generate an ordered allocation of a plurality of charging operations for the electric machines and first electric vehicles based on the plurality of tasks and on the charge statuses. The charging operations include charging at least one of the electric machines or first electric vehicles from a second electric vehicle with charge ports that is scheduled to visit the site from offsite.

## Claims

### Claim 1

A computer comprising a processor and a memory storing instructions executable by the processor to:
receive data indicating a plurality of tasks to be performed at a site by a plurality of electric machines;
receive charge statuses of the electric machines and of a plurality of first electric vehicles at the site; and
generate an ordered allocation of a plurality of charging operations for the electric machines and first electric vehicles based on the plurality of tasks and on the charge statuses, the charging operations including charging at least one of the electric machines or first electric vehicles from a second electric vehicle with charge ports that is scheduled to visit the site from offsite.

### Claim 2 (depends on 1)

The computer of claim 1, wherein the site is a bounded geographic area over which the first electric vehicles are authorized to travel.

### Claim 3 (depends on 1)

The computer of claim 1, wherein the second electric vehicle is scheduled to visit the site from offsite for a noncharging purpose before generating the ordered allocation of the charging operations.

### Claim 4 (depends on 1)

The computer of claim 1, wherein the charging operations include scheduling the second electric vehicle to visit the site from offsite for charging the at least one of the electric machines or first electric vehicles.

### Claim 5 (depends on 1)

The computer of claim 1, wherein the charging operations include charging the electric machines from the first electric vehicles.

### Claim 6 (depends on 1)

The computer of claim 1, wherein the charging operations include instructing one of the first electric vehicles to travel to a location offsite and recharge at the location.

### Claim 7 (depends on 6)

The computer of claim 6, wherein instructing the one of the first electric vehicles to travel to the location offsite includes instructing the one of the first electric vehicles to remain at the location overnight.

### Claim 8 (depends on 1)

The computer of claim 1, wherein the charging operations include drawing charge from one of the electric machines that is not scheduled to perform any of the tasks.

### Claim 9 (depends on 1)

The computer of claim 1, wherein receiving the charge statuses occurs in real time, and the instructions further include instructions to modify the ordered allocation of the charging operations in response to the charge statuses indicating insufficient charge for performing at least one of the tasks.

### Claim 10 (depends on 9)

The computer of claim 9, wherein the instructions further include instructions to receive a prioritization of the tasks, and modifying the ordered allocation of the charging operations includes instructing at least one of the electric machines to turn off according to the prioritization.

### Claim 11 (depends on 9)

The computer of claim 9, wherein the first electric vehicles include respective pluralities of the charge ports, and modifying the ordered allocation of the charging operations includes instructing at least one of the first electric vehicles to disconnect the charge ports of that first electric vehicle.

### Claim 12 (depends on 9)

The computer of claim 9, wherein the first electric vehicles include respective pluralities of the charge ports, and modifying the ordered allocation of the charging operations includes instructing at least one of a first one or a second one of the first electric vehicles to switch one of the electric machines from charging from one of the charge ports of the first one of the first electric vehicles to charging from one of the charge ports of the second one of the first electric vehicles.

### Claim 13 (depends on 12)

The computer of claim 12, wherein instructing the at least one of the first one or the second one of the first electric vehicles to switch one of the electric machines includes instructing the at least one of the first one or the second one of the electric vehicles to output a message indicating to switch the one of the electric machines from charging from the one of the charge ports of the first one of the first electric vehicles to charging from the one of the charge ports of the second one of the first electric vehicles.

### Claim 14 (depends on 12)

The computer of claim 12, wherein instructing the at least one of the first one or the second one of the first electric vehicles to switch one of the electric machines includes instructing the at least one of the first one or the second one of the electric vehicles to actuate a robotic arm to move a power cord of the one of the electric machines from the one of the charge ports of the first one of the first electric vehicles to the one of the charge ports of the second one of the first electric vehicles.

### Claim 15 (depends on 9)

The computer of claim 9, wherein modifying the ordered allocation of the charging operations includes instructing one of the first electric vehicles to travel from a current location at the site to a new location at the site.

### Claim 16 (depends on 9)

The computer of claim 9, wherein modifying the ordered allocation of the charging operations includes instructing one of the first electric vehicles to turn off an operation of that first electric vehicle.

### Claim 17 (depends on 1)

The computer of claim 1, wherein the instructions further include instructions to instruct at least one of the first electric vehicles to disconnect a charge port of that first electric vehicle in response to an unscheduled charging of one of the electric machines from that charge port.

### Claim 18 (depends on 1)

The computer of claim 1, wherein the tasks include a plurality of types of the tasks.

### Claim 19 (depends on 18)

The computer of claim 18, wherein the electric machines include a plurality of types of the electric machines associated with the respective types of the tasks.

### Claim 20

A method comprising:
receiving data indicating a plurality of tasks to be performed at a site by a plurality of electric machines;
receiving charge statuses of the electric machines and of a plurality of first electric vehicles at the site; and
generating an ordered allocation of a plurality of charging operations for the electric machines and first electric vehicles based on the plurality of tasks and on the charge statuses, the charging operations including charging at least one of the electric machines or first electric vehicles from a second electric vehicle with charge ports that is scheduled to visit the site from offsite.
