# US 2023/0075122 A1 · Thermal control of data center

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0075122 A1
- Document ID: US20230075122A1
- Status: Published application
- Kind: A1
- Application number: 17/980,833
- Filed: 2022-11-04
- Published: 2023-03-09
- Earliest claimed: 2018-09-21
- Assignees: Johnson Controls Tyco IP Holdings LLP
- Applicants: Johnson Controls Tyco IP Holdings LLP
- Inventors: Donald R. Albinger; Karl F. Reichenberger; Sudhi R. Sinha
- Web page: https://patentgrep.com/patent/US20230075122A1

## CPC

- H05K 7/20718: {Forced ventilation of a gaseous coolant (in closed loop H05K7/20754)}
- F24F 11/30: for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F 11/47: Responding to energy costs
- G06F 3/1224: {Client or server resources management}
- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- H05K 7/20136: {Forced ventilation, e.g. by fans (H05K7/202 takes precedence)}
- H05K 7/20209: {Thermal management, e.g. fan control}
- H05K 7/20836: {Thermal management, e.g. server temperature control}
- F24F 2110/10: Temperature
- G05B 2219/32255: Required time for work temperature control
- G06F 2119/08: Thermal analysis or thermal optimisation
- H05K: PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A method includes measuring a plurality of temperatures corresponding to a plurality of servers located in a data center, determining a subset of the plurality of servers as high-temperature servers based on the plurality of temperatures, and reassigning tasks from at least a portion of the subset of the plurality of servers to one or more other servers of the plurality of servers.

## Claims

### Claim 1

A method for operating a heating, ventilation, or air conditioning (HVAC) system in a data center, comprising:
removing heat from air in the data center utilizing the HVAC system, the HVAC system comprising at least one of a central plant, an airside system, a waterside system, rack cooling equipment, a computer-room air conditioner, a rooftop unit, a floor cooling system, or a liquid cooling system;
detecting a hot spot within the data center, the hot spot being caused by operations of one or more servers in the data center; and
directly providing cooling to the hot spot in response to detecting the hot spot.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
using space temperature data, server temperature data, and a model of performance for the HVAC system and the data center to predict changes to the HVAC system and the data center, the changes predicted to conserve energy while complying with temperature constraints for the data center and meeting a processing demand on the data center; and
electronically controlling the HVAC system and the data center in accordance with the changes for both the HVAC system and the data center.

### Claim 3 (depends on 2)

The method of claim 2, wherein the model of performance of the HVAC system and the data center models an operational efficiency of servers of the data center as a function of at least one of the space temperature data or the server temperature data.

### Claim 4 (depends on 1)

The method of claim 1, wherein the hot spot is detected using one or more thermal cameras in the data center.

### Claim 5 (depends on 1)

The method of claim 1, wherein more than one hot spot is detected and the cooling is provided to the more than one hot spot and the method uses artificial intelligence.

### Claim 6 (depends on 1)

The method of claim 1, further comprising:
shifting operations performed by the one or more servers in the hot spot to other servers outside of the hot spot.

### Claim 7 (depends on 6)

The method of claim 6, wherein the other servers are in a cooler location of the data center.

### Claim 8 (depends on 1)

The method of claim 1, further comprising:
providing load information for the data center to a user interface.

### Claim 9

A system comprising:
servers located at a data center;
equipment configured to cool the servers, the equipment comprising at least one of a central plant, an airside system, a waterside system, rack cooling equipment, a computer-room air conditioner, a rooftop unit, a floor cooling system, or a liquid cooling system;
a controller configured to control the equipment based on estimates of an amount of thermal energy output by each of the servers and energy cost.

### Claim 10 (depends on 9)

The system of claim 9, wherein the controller is configured to apply the estimates of the amount of thermal energy output by the servers in a feedforward control approach to generate setpoints for the equipment or is configured to use artificial intelligence.

### Claim 11 (depends on 10)

The system of claim 10, wherein the estimates of the amount of thermal energy output by the servers comprise predictions of the amount of thermal energy output by the servers for a plurality of time steps; and
wherein the controller is configured to generate the setpoints for the equipment for the plurality of time steps based on the predictions.

### Claim 12 (depends on 11)

The system of claim 11, wherein the controller is configured to generate the setpoints by performing an optimization process that minimizes an overall resource usage of the servers and the equipment over a time horizon.

### Claim 13 (depends on 9)

The system of claim 9, wherein the controller is configured to reschedule operations of the servers based on a time-variant cost of operating the equipment.

### Claim 14 (depends on 9)

The system of claim 9, wherein the servers comprise fans and the controller is configured to control the fans.

### Claim 15 (depends on 14)

The system of claim 14, wherein the controller is configured to coordinate control of the waterside system, the airside system, the rack-cooling system, and the fans.

### Claim 16

A method comprising:
controlling operations of servers at a data center;
controlling building equipment to cool the servers;
determining a high-cost period for operating the building equipment and a low-cost period for operating the building equipment;
identifying a time-insensitive task scheduled to occur during the high-cost period; and
causing the time-insensitive task to be executed during the low-cost period.

### Claim 17 (depends on 16)

The method of claim 16, comprising:
predicting a high-activity period for the servers; and
operating the building equipment to reduce a temperature at the servers before the high-activity period.

### Claim 18 (depends on 16)

The method of claim 16, comprising shifting the time-insensitive task from a first server to a second server based on a temperature differential between the first server and the second server.

### Claim 19 (depends on 16)

The method of claim 16, wherein determining the high-cost period comprises predicting weather-based loads on the building equipment.

### Claim 20 (depends on 16)

The method of claim 16, wherein determining the high-cost period and the low-cost period comprises determining utility rates over a time horizon and wherein the building equipment comprises at least one of a central plant, an airside system, a waterside system, rack cooling equipment, a computer-room air conditioner, a rooftop unit, a floor cooling system, or a liquid cooling system.