# US 2023/0069611 A1 · Simulation device and simulation method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0069611 A1
- Document ID: US20230069611A1
- Status: Published application
- Kind: A1
- Application number: 17/762,218
- Filed: 2019-09-27
- Published: 2023-03-02
- Earliest claimed: 2019-09-27
- Assignees: Fuji Corporation
- Applicants: Fuji Corporation
- Inventors: Shota TAKAGI; Kohei ISHIKAWA
- Web page: https://patentgrep.com/patent/US20230069611A1

## CPC

- H05K 13/085: {Production planning, e.g. of allocation of products to machines, of mounting sequences at machine or facility level}
- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- H05K 13/02: Feeding of components
- H05K 13/021: {Loading or unloading of containers (H05K13/028 takes precedence)}
- H05K 13/086: {Supply management, e.g. supply of components or of substrates}
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- H05K: PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

The simulation device includes a simulation section and an output section. The simulation section is configured to simulate an operating status of a board work machine configured to perform predetermined board work on a board and produce a board product, and an operating status of an article moving device configured to supply an article needed for production of the board product to the board work machine based on a production plan of the board product. The output section is configured to output time series information indicating a temporal change of the operating status of the board work machine and a temporal change of the operating status of the article moving device, which are results of simulation by the simulation section.

## Claims

### Claim 1

A simulation device comprising:
a simulation section configured to simulate an operating status of a board work machine configured to perform predetermined board work on a board and produce a board product, and an operating status of an article moving device configured to supply an article needed for production of the board product to the board work machine based on a production plan of the board product; and
an output section configured to output time series information indicating a temporal change of the operating status of the board work machine and a temporal change of the operating status of the article moving device, which are results of simulation by the simulation section.

### Claim 2 (depends on 1)

The simulation device according to claim 1, further comprising:
a display section configured to, based on the time series information output by the output section, display a first operating time zone in which the board work machine is operated and a first stop time zone in which the board work machine is stopped, and a second operating time zone in which the article moving device is operated and a second stop time zone in which the article moving device is stopped on a display device in a timeline in a comparative manner.

### Claim 3 (depends on 2)

The simulation device according to claim 2,
wherein the display section is configured to display a production time zone from a start of production to a termination of production of the board product in a timeline for each production plan.

### Claim 4 (depends on 2, 3)

The simulation device according to claim 2 or 3,
wherein the display section is configured to display a recovery production time zone, in the first operating time zone, in which a scheduled production plan is changed due to a shortage of the article in the board work machine and the board work machine performs the board work based on the changed production plan to be distinguishable from other operating time zones of the board work machine.

### Claim 5 (depends on 2, 3, 4)

The simulation device according to any one of claims 2 to 4,
wherein the display section is configured to display a first supply time zone, in the second operating time zone, in which the article moving device is operated to supply the article, which is needed due to a shortage of the article or a changeover in the board work machine, to be distinguishable from other operating time zones of the article moving device.

### Claim 6 (depends on 2, 3, 4, 5)

The simulation device according to any one of claims 2 to 5,
wherein the display section is configured to display a second supply time zone, in the second operating time zone, in which the article moving device is operated to preliminarily supply the article to the board work machine to be distinguishable from other operating time zones of the article moving device.

### Claim 7 (depends on 2, 3, 4, 5, 6)

The simulation device according to any one of claims 2 to 6,
wherein the display section is configured to display a collection time zone, in the second operating time zone, in which the article moving device is operated to collect the article, which is no longer needed in the board work machine, to be distinguishable from other operating time zones of the article moving device.

### Claim 8 (depends on 2, 3, 4, 5, 6, 7)

The simulation device according to any one of claims 2 to 7,
wherein the display section is configured to display a board production line in which the board work machine and the article moving device are provided in a virtual space by a simulation, and sterically display the temporal change of the operating status of the board work machine and the temporal change of the operating status of the article moving device depending on a time elapse of a timeline.

### Claim 9 (depends on 8)

The simulation device according to claim 8,
wherein the display section is configured to sterically display a supply operation of conveying and supplying the article stored in a storage device to the board work machine to which the article is to be supplied by the article moving device, and a collection operation of conveying and collecting the article, which is no longer needed in the board work machine, to the storage device by the article moving device.

### Claim 10 (depends on 8, 9)

The simulation device according to claim 8 or 9,
wherein the board work machine includes a first slot configured to hold the article used for production of the board product in an exchangeable manner, and a second slot configured to preliminarily hold the article or temporarily hold the article to be collected,
the article moving device is configured to perform an exchange operation of the article between the first slot and the second slot, and
the display section is configured to sterically display an occupation region of the article in the first slot and an occupation region of the article in the second slot.

### Claim 11 (depends on 8, 9, 10)

The simulation device according to any one of claims 8 to 10,
wherein the article moving device includes a holding section configured to hold the article and carry the article in and out the board work machine, and
the display section is configured to display a carrying-in state and a carrying-out state of the article by the holding section.

### Claim 12 (depends on 8, 9, 10, 11)

The simulation device according to any one of claims 8 to 11,
wherein the display section is configured to display a recovery production machine, which is the board work machine that performs the board work, after a scheduled production plan is changed due to a shortage of the article in the board work machine, based on the changed production plan, the board work machine that performs the board work based on the scheduled production plan, and the board work machine that is stopped without performing the board work to be distinguishable from each other.

### Claim 13

A simulation method comprising:
a simulation step of simulating an operating status of a board work machine configured to perform predetermined board work on a board and produce a board product, and an operating status of an article moving device configured to supply an article needed for production of the board product to the board work machine based on a production plan of the board product; and
an output step of outputting time series information indicating a temporal change of the operating status of the board work machine and a temporal change of the operating status of the article moving device, which are results of simulation in the simulation step.