# US 2023/0068901 A1 · Advanced available-to-promise supply creation-based confirmation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0068901 A1
- Document ID: US20230068901A1
- Status: Published application
- Kind: A1
- Application number: 17/410,970
- Filed: 2021-08-24
- Published: 2023-03-02
- Earliest claimed: 2021-08-24
- Assignees: Sap SE
- Applicants: Sap SE
- Inventors: Andras Kovacs; Thomas Werth; Grzegorz Falinski; Dominik Herrmann; Jan Peter Ohst; Stefan Merker; Pranit Bankar; Yaswanth Datta Saikumar Vathumilli; Christian Mohr; Jibi Joseph Vadakayil
- Web page: https://patentgrep.com/patent/US20230068901A1

## CPC

- G06Q 10/06313: {Resource planning in a project environment}
- G06Q 10/06311: {Scheduling, planning or task assignment for a person or group}
- G06Q 10/06315: {Needs-based resource requirements planning or analysis}
- G06Q 10/087: Inventory or stock management, e.g. order filling, procurement or balancing against orders
- G06Q 10/0872: {using inventory planning}
- G06Q 10/08726: {for replenishment processing, procedures, or recommendations using forecasting or optimisation}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Certain embodiments of the disclosure concern a computer-implemented method. For a distributable product, the method can store a representation of a production process involving a plurality of prerequisites and input quality parameters, receive a request to promise availability of a first quantity of the product having specific instances of the input quality parameters, simulate production of a second quantity of the product having the specific instances of the input quality parameters, output one or more promised delivery terms, and reserve resources in a production system for production of the second quantity of the product. The second quantity is smaller than or equal to the first quantity.

## Claims

### Claim 1

A computer-implemented method comprising:
for a distributable product, storing a representation of a production process involving a plurality of prerequisites and input quality parameters;
receiving a request to promise availability of a first quantity of the product having specific instances of the input quality parameters;
simulating production of a second quantity of the product having the specific instances of the input quality parameters, wherein the second quantity is smaller than or equal to the first quantity;
outputting one or more promised delivery terms; and
reserving resources in a production system for production of the second quantity of the product.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
determining a third quantity of the product having the specific instances of the input quality parameters from an existing product supply source; and
calculating the second quantity by subtracting the third quantity from the first quantity.

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
responsive to acceptance of the promised delivery terms, committing production of the second quantity of the product to the production system using the reserved resources.

### Claim 4 (depends on 1)

The method of claim 1, further comprising:
responsive to decline of the promised delivery terms, releasing the reserved resources to the production system.

### Claim 5 (depends on 1)

The method of claim 1, wherein a time interval between receiving the request and outputting one or more promised delivery terms is less than a predefined duration.

### Claim 6 (depends on 5)

The method of claim 5, wherein the predefined duration ranges from 1 second to 10 seconds.

### Claim 7 (depends on 1)

The method of claim 1, wherein outputting one or more promised delivery terms is based on simulated production of the second quantity of the product having the specific instances of the input quality parameters.

### Claim 8 (depends on 1)

The method of claim 1, wherein outputting one or more promised delivery terms is based on time series of estimated product availability data pre-generated.

### Claim 9 (depends on 8)

The method of claim 8, wherein outputting one or more promised delivery terms is performed before completion of the simulated production of the second quantity of the product having the specific instances of the input quality parameters.

### Claim 10 (depends on 9)

The method of claim 9, further comprising confirming or modifying the one or more promised delivery terms after completion of the simulated production of the second quantity of the product having the specific instances of the input quality parameters.

### Claim 11

A computing system comprising:
memory;
one or more hardware processors coupled to the memory; and
one or more computer readable storage media storing instructions that, when loaded into the memory, cause the one or more hardware processors to perform operations comprising:
for a distributable product, storing a representation of a production process involving a plurality of prerequisites and input quality parameters;
receiving a request to promise availability of a first quantity of the product having specific instances of the input quality parameters;
simulating production of a second quantity of the product having the specific instances of the input quality parameters, wherein the second quantity is smaller than or equal to the first quantity;
outputting one or more promised delivery terms; and
reserving resources in a production system for production of the second quantity of the product.

### Claim 12 (depends on 11)

The system of claim 11, wherein the operations further comprise:
determining a third quantity of the product having the specific instances of the input quality parameters from an existing product supply source; and
calculating the second quantity by subtracting the third quantity from the first quantity.

### Claim 13 (depends on 11)

The system of claim 11, wherein the operations further comprise:
responsive to acceptance of the promised delivery terms, committing production of the second quantity of the product to the production system using the reserved resources.

### Claim 14 (depends on 11)

The system of claim 11, wherein the operations further comprise:
responsive to decline of the promised delivery terms, releasing the reserved resources to the production system.

### Claim 15 (depends on 11)

The system of claim 11, wherein a time interval between receiving the request and outputting one or more promised delivery terms is less than three seconds.

### Claim 16 (depends on 11)

The system of claim 11, wherein outputting one or more promised delivery terms is based on simulated production of the second quantity of the product having the specific instances of the input quality parameters.

### Claim 17 (depends on 11)

The system of claim 11, wherein outputting one or more promised delivery terms is based on time series of estimated product availability data pre-generated.

### Claim 18 (depends on 18)

The system of claim 18, wherein outputting one or more promised delivery terms is performed before completion of the simulated production of the second quantity of the product having the specific instances of the input quality parameters.

### Claim 19 (depends on 18)

The system of claim 18, wherein the operations further comprise confirming or modifying the one or more promised delivery terms after completion of the simulated production of the second quantity of the product having the specific instances of the input quality parameters.

### Claim 20

One or more computer-readable media having encoded thereon computer-executable instructions causing one or more processors to perform a method comprising:
for a distributable product, storing a representation of a production process involving a plurality of prerequisites and input quality parameters;
receiving a request to promise availability of a first quantity of the product having specific instances of the input quality parameters;
determining a second quantity of the product having the specific instances of the input quality parameters from an existing product supply source;
calculating a third quantity by subtracting the second quantity from the first quantity; and
simulating production of the third quantity of the product having the specific instances of the input quality parameters;
outputting one or more promised delivery terms;
reserving resources in a production system for production of the third quantity of the product; and
responsive to acceptance of the promised delivery terms, committing production of the third quantity of the product to the production system using the reserved resources;
wherein outputting one or more promised delivery terms is based on time series of estimated product availability data pre-generated;
wherein outputting one or more promised delivery terms is performed before completion of the simulated production of the third quantity of the product having the specific instances of the input quality parameters.