# US 2023/0068677 A1 · Methods for construction planning of charging piles in the smart cities and internet of things systems thereof

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0068677 A1
- Document ID: US20230068677A1
- Status: Published application
- Kind: A1
- Application number: 18/054,156
- Filed: 2022-11-10
- Published: 2023-03-02
- Earliest claimed: 2022-10-18
- Assignees: Chengdu Qinchuan Iot Technology Co., Ltd.
- Applicants: Chengdu Qinchuan Iot Technology Co., Ltd.
- Inventors: Zehua SHAO; Yong LI; Junyan ZHOU; Yaqiang QUAN; Yongzeng LIANG
- Web page: https://patentgrep.com/patent/US20230068677A1

## CPC

- G06F 30/27: using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
- G06Q 50/08: Construction
- B60L 53/67: Controlling two or more charging stations
- G06F 30/13: Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 10/047: Optimisation of routes or paths, e.g. travelling salesman problem
- G06Q 10/0631: Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q 50/06: Energy or water supply
- G16Y 20/10: relating to the environment, e.g. temperature; relating to location
- Y02T 10/70: Energy storage systems for electromobility, e.g. batteries
- Y02T 10/7072: Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
- Y02T 90/12: Electric charging stations
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- B60L: PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES (arrangements or mounting of electrical propulsion units or of plural diverse prime-movers for mutual or common propulsion in vehicles B60K1/00, B60K6/20; arrangements or mounting of electrical gearing in vehicles B60K17/12, B60K17/14; preventing wheel slip by reducing power in rail vehicles B61C15/08; dynamo-electric machines H02K; control or regulation of electric motors H02P); SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES (electric coupling devices combined with mechanical couplings of vehicles B60D1/64; electric heating for vehicles B60H1/00); ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL (control or regulation of electric motors H02P); MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- G16Y: INFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
- Y02T: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION

## Abstract

The embodiments of the present disclosure provide a method for construction planning of a charging pile in a smart city. The method is implemented based on a management platform of an Internet of Things system for construction planning of the charging pile in the smart city. The method comprises: obtaining a region feature of a region to be expanded; determining at least one candidate construction site based on the region feature; the region feature at least including distribution of people flow in the region to be expanded and distribution of existing charging piles in the region to be expanded; and determining at least one target construction site based on the at least one candidate construction site.

## Claims

### Claim 1

A method for construction planning of a charging pile in a smart city, implemented based on a management platform of an Internet of Things system for construction planning of the charging pile in the smart city, the method comprising:
obtaining a region feature of a region to be expanded;
determining at least one candidate construction site based on the region feature; wherein the region feature at least includes distribution of people flow in the region to be expanded and distribution of existing charging piles in the region to be expanded; and
determining at least one target construction site based on the at least one candidate construction site.

### Claim 2 (depends on 1)

The method of claim 1, wherein the region feature further includes distribution of economic level in the region to be expanded.

### Claim 3 (depends on 1)

The method of claim 1, wherein the region feature further includes traffic convenience in the region to be expanded.

### Claim 4 (depends on 1)

The method of claim 1, wherein the determining at least one target construction site based on the at least one candidate construction site comprises:
predicting an expected benefit of the candidate construction site through processing a site feature of each candidate construction site in the at least one candidate construction site based on a first prediction model, wherein the first prediction model is a machine learning model; and
determining the target construction site based on the expected benefit of the candidate construction site.

### Claim 5 (depends on 1)

The method of claim 1, wherein the determining at least one target construction site based on the at least one candidate construction site comprises:
constructing a first candidate feature map based on the at least one candidate construction site, wherein the first candidate feature map includes nodes and edges, the nodes correspond to preset facilities in the region to be expanded, and the edges represent roads between the preset facilities corresponding to the nodes; and
determining the at least one target construction site based on the first candidate feature map.

### Claim 6 (depends on 5)

The method of claim 5, wherein a feature of the edge includes a length and convenience of the road corresponding to the edge.

### Claim 7 (depends on 5)

The method of claim 5, wherein the determining at least one target construction site based on the first candidate feature map comprises:
determining at least one second candidate feature map based on the first candidate feature map; and
determining the at least one target construction site based on the at least one second candidate feature map.

### Claim 8 (depends on 7)

The method of claim 7, wherein the determining at least one target construction site based on the at least one second candidate feature map comprises:
determining a plurality of first candidate expansion maps based on the at least one second candidate feature map;
determining a target expansion map through performing a plurality of rounds of iteration updates on the plurality of first candidate expansion maps until a preset iterative condition is satisfied; and
determining the at least one target construction site based on the target expansion map.

### Claim 9 (depends on 8)

The method of claim 8, wherein at least one round of iteration in the plurality of iteration updates comprises:
determining an evaluation value of each first candidate expansion map in the plurality of first candidate expansion maps, wherein when a number of round of iteration is 1, the first candidate expansion map is the at least one second candidate feature map; when the number of round of iteration is larger than 1, the first candidate expansion map is a third candidate expansion map obtained from a previous round of iteration;
determining a second candidate expansion map from the plurality of first candidate expansion maps based on the evaluation value or evaluation parameter of the first candidate expansion map;
determining the third candidate expansion map through performing transformation processing on the second candidate expansion map; and
determining the first candidate expansion map of a next round of iteration or the target expansion map based on the third candidate expansion map.

### Claim 10 (depends on 9)

The method of claim 9, wherein the transformation processing includes a first transformation and a second transformation;
the first transformation includes: selecting at least two second candidate expansion maps from a plurality of the second candidate expansion maps, exchanging one or more nodes in the at least two second candidate expansion maps to generate at least two candidate maps, and determining the third candidate expansion map based on the at least two candidate maps; and
the second transformation includes: deleting or adding a node in a preliminary map to generate at least one third candidate expansion map, wherein the preliminary map is the second candidate expansion map or the candidate map.

### Claim 11 (depends on 9)

The method of claim 9, wherein the preset iterative condition includes at least one of
the number of round of iteration being not less than a preset round value;
the evaluation value of the first candidate expansion map being not less than a preset evaluation value; and
in at least two consecutive rounds of iteration, a change of the evaluation value of the first candidate expansion map being smaller than a preset change value.

### Claim 12 (depends on 1)

The method of claim 1, wherein the Internet of Things system for construction planning of the charging pile in the smart city further comprises a user platform, a service platform, a sensor network platform, and an object platform;
the management platform includes a general database of the management platform and a plurality of management sub-platforms;
the sensor network platform includes a plurality of sensor network sub-platforms; different regions to be expanded correspond to different sensor network sub-platforms; the different sensor network sub-platforms correspond to different management sub-platforms;
the region feature of the region to be expanded is obtained based on the object platform and uploaded to the corresponding management sub-platform based on the sensor network sub-platform corresponding to the region to be expanded;
the method further comprising:
transmitting the at least one target construction site to the service platform through the general database of management platform and uploading the at least one target construction site to the user platform based on the service platform.

### Claim 13

An Internet of Things system for construction planning of a charging pile in a smart city, including a user platform, a service platform, a management platform, a sensor network platform, and an object platform;
the sensor network platform includes a plurality of sensor network sub-platforms; different regions to be expanded correspond to different the sensor network sub-platforms;
the management platform includes a general database of the management platform and a plurality of management sub-platforms;
the object platform is configured to obtain region feature of a region to be expanded;
the sensor network sub-platform is configured to obtain the region feature of the corresponding region to be expanded based on the object platform, and upload the region feature to the corresponding management sub-platform;
the management sub-platform is configured to perform operations including:
determining at least one candidate construction site based on the region feature, wherein the region feature at least includes distribution of people flow in the region to be expanded and distribution of existing charging piles in the region to be expanded;
determining at least one target construction site based on the at least one candidate construction site;
transmitting at least one target construction site to the service platform through the general database of the management platform; and
the service platform is configured to upload the at least one target construction site to the user platform.

### Claim 14 (depends on 13)

The system of claim 13, the management sub-platform is further configured to perform operation including:
predicting an expected benefit of the candidate construction site through processing a site feature of each candidate construction site in the at least one candidate construction site by a first prediction model, wherein the first prediction model is a machine learning model; and
determining the target construction site according to the expected benefit of the candidate construction site.

### Claim 15 (depends on 13)

The system of claim 13, wherein the management sub-platform is further configured to perform operations including:
constructing a first candidate feature map based on the at least one candidate construction site; and
determining the at least one target construction site based on the first candidate feature map, wherein the first candidate feature map includes nodes and edges, the nodes correspond to preset facilities in the region to be expanded, and the edges represent roads between the preset facilities corresponding to the nodes.

### Claim 16 (depends on 15)

The system of claim 15, wherein the management sub-platform is further configured to perform operations including:
determining at least one second candidate feature map based on the first candidate feature map; and
determining at least one target construction site based on the at least one second candidate feature map.

### Claim 17 (depends on 16)

The system of claim 16, wherein the management sub-platform is further configured to perform operations including:
determining a plurality of first candidate expansion maps based on the at least one second candidate feature map;
determining a target expansion map through performing a plurality of rounds of iteration updates on the plurality of first candidate expansion maps until a preset iterative condition is satisfied, and
determining at least one target construction site based on the target expansion map.

### Claim 18 (depends on 17)

The system of claim 17, wherein at least one round of iteration in the plurality of iteration updates comprises:
determining an evaluation value of each first candidate expansion map in the plurality of first candidate expansion maps, wherein when a number of round of iteration is 1, the first candidate expansion map is the at least one second candidate feature map; when the number of round of iteration is larger than 1, the first candidate expansion map is a third candidate expansion map obtained from a previous round of iteration;
determining a second candidate expansion map from the plurality of first candidate expansion maps based on the evaluation value or evaluation parameters of the first candidate expansion map;
determining the third candidate expansion map through performing transformation processing on the second candidate expansion map; and
determining the first candidate expansion map of a next round of iteration or the target expansion map based on the third candidate expansion map.

### Claim 19 (depends on 18)

The system of claim 18, wherein the transformation includes a first transformation and a second transformation;
the first transformation includes: selecting at least two second candidate expansion maps from a plurality of the second candidate expansion maps, exchanging one or more nodes in the at least two second candidate expansion maps to generate at least two candidate maps, and determining the third candidate expansion map based on the at least two candidate maps; and
the second transformation includes: deleting or adding a node in a preliminary map to generate at least one third candidate expansion map, wherein the preliminary map is the second candidate expansion map or the candidate map.

### Claim 20 (depends on 1)

A non-transitory computer-readable storage medium storing computer instructions, when the computer instructions are executed by a processor, a method for construction planning of a charging pile in a smart city of claim 1 is implemented.