# US 2023/0068476 A1 · Process For the Reduction of Flaring/Venting Gases During Completions Operations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0068476 A1
- Document ID: US20230068476A1
- Status: Published application
- Kind: A1
- Application number: 17/846,527
- Filed: 2022-06-22
- Published: 2023-03-02
- Earliest claimed: 2021-06-25
- Assignees: Tara Energy Services Inc.
- Applicants: Tara Energy Services Inc.
- Inventors: Scott BISSELL; Randal MCNEILL; Braydon GARAGAN
- Web page: https://patentgrep.com/patent/US20230068476A1

## CPC

- E21B 43/34: Arrangements for separating materials produced by the well
- B01D 5/0069: {with degasification or deaeration}
- B01D 19/0063: {Regulation, control including valves and floats (for construction and details of valves F16K)}
- B01D 19/0068: {General arrangements, e.g. flowsheets (B01D19/0063 takes precedence)}
- F17C 1/00: Pressure vessels, e.g. gas cylinder, gas tank, replaceable cartridge (pressurised apparatus for purposes other than storage, see the relevant subclasses such as A62C, B05B; associated with vehicles, see the appropriate subclass of classes B60 - B64; pressure vessels in general F16J12/00 {; autoclaves B01J3/04; tank vehicles B60P3/22; railway tank wagons for carrying fluent materials B61D5/00; accumulators for supplying fluid under pressure F15B1/04; liquefied gas stoves F24C3/00})
- F17C 9/00: Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure
- B01D 17/0214: {with removal of one of the phases}
- C10L 3/101: {Removal of contaminants}
- F17C 2221/033: Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
- F17C 2223/033: Small pressure, e.g. for liquefied gas
- F17C 2227/0157: Compressors
- F17C 2250/043: Pressure
- F17C 2250/0636: Flow or movement of content
- F17C 2260/044: Avoiding pollution or contamination
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- B01D: SEPARATION (separating solids from solids by wet methods B03B, B03D; by pneumatic jigs or tables B03B; by other dry methods B07; magnetic or electrostatic separation of solid materials from solid materials or fluids, separation by high-voltage electric fields B03C; centrifuges, vortex apparatus B04; presses per se for squeezing-out liquid from liquid-containing material B30B9/02; treatment of water C02F, e.g. softening by ion-exchange C02F1/42; {arrangements of air intake cleaners in gas turbine plants F02C7/05} ; arrangements or mounting of filters in air-conditioning, air-humidification or ventilation F24F13/28)
- F17C: VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES (storing fluids in natural or artificial cavities or chambers in the earth B65G5/00; construction or assembling of bulk storage containers employing civil-engineering techniques E04H7/00; variable-capacity gas-holders F17B; liquefaction or refrigeration machines, plants, or systems F25)
- C10L: FUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G OR C10K; LIQUIFIED PETROLEUM GAS; USE OF ADDITIVES TO FUELS OR FIRES; FIRE-LIGHTERS

## Abstract

A process for the reduction of flaring/venting gases during completions operations on an oil/gas well, said process comprising providing a well in need of completion; providing a system to capture oil and gas generated by the well; the system including a primary separator to separate an incoming well stream into a plurality of streams wherein a first stream is sent to a pipeline and a second stream is sent for further processing. The process further includes flowing and collecting a third stream of gas in a gas pressure vessel; compressing the collected gas in the vessel until parameters of compressed gas are compressed to provide a constant feed to the pipeline; and transferring the compressed gas to the gas pipeline wherein the process reduces the amount of gas flared and/or vented during operation by over 80%.

## Claims

### Claim 1

A process for the reduction of flaring/venting gases during completions operations on an oil/gas well, said process comprising the steps of:
providing a well in need of completion;
providing a system to capture oil and gas generated by said well; wherein said system comprises:
a primary separator adapted to separate the incoming well stream into:
a first stream of pipeline-worthy gas;
a second stream of fluids;
a third stream of gas which is collected; and
a fourth stream of oil condensate which is collected;
wherein said first stream of pipeline-worthy gas is sent to a pipeline and said second stream is sent for further processing;
a low pressure stage separator adapted to remove water and sand from said second stream of fluids and generating a fifth stream of oil condensate which is collected;
a low stage condensate separator wherein said fourth stream of oil condensate and said fifth stream of oil condensate are collected, said low stage condensate separator generating a sixth stream of gas which is collected;
a compression unit;
flowing said third stream of gas and sixth stream of gas to a gas pressure vessel;
collecting said third stream of gas and sixth stream of gas into said gas pressure vessel;
performing compression of said collected gas in said gas pressure vessel until parameters of compressed gas are such that it can be compressed by said compression unit providing a constant feed to said pipeline; and
transferring said compressed gas to said gas pipeline;
wherein said process reduces the amount of gas flared and/or vented during a completions operation by over 80%.

### Claim 2 (depends on 1)

The process according to claim 1, wherein said compression is carried out using a compressor comprising a built-in system to monitor the pressure of the solution gas.

### Claim 3 (depends on 1)

The process according to claim 1, further comprising a flare stack only for use in an emergency case.

### Claim 4 (depends on 1)

The process according to claim 1, wherein said process reduces the amount of gas flared and/or vented during completions operations by over 90%.

### Claim 5 (depends on 1)

The process according to claim 1, wherein said process reduces the amount of gas flared and/or vented during completions operations by over 95%.

### Claim 6 (depends on 1)

The process according to claim 1, wherein said process reduces the amount of gas flared and/or vented during completions operations by over 97.5%.

### Claim 7 (depends on 1)

The process according to claim 1, wherein said compression is carried out in 2 stages, a first stage using two separate reciprocating compressor systems to pressurize the solution gas from approximately 40 psi (275.8 kPa) to approximately 400 psi (2,757.9 kPa) at a flow rate of 15.4 e3 m3/day, and flowing the resulting fluid to a second compression stage.

### Claim 8 (depends on 7)

The process according to claim 7, wherein said second stage of compression using a single reciprocating compressor system which can pressurize the solution gas from approximately 400 psi to approximately 700 psi to 800 psi at a flow rate of 15.0 e3 m3/day.

### Claim 9 (depends on 7)

The process according to claim 7, wherein said compression is carried a compressor system which is designed to handle a two-phase flow (liquids and gases).

### Claim 10 (depends on 1)

The process according to claim 1, wherein said system to capture oil and gas further comprises a metering unit adapted to measure the volume of at least one of said first, second, third, fourth, fifth, and sixth stream.

### Claim 11

A process for the reduction of flaring/venting gases during completions operations on an oil/gas well, said process comprising the steps of:
providing a well in need of completion;
providing a system to capture oil and gas generated by said well; wherein said system comprises:
a primary separator adapted to separate an incoming well stream into:
a first stream of pipeline-worthy gas;
a second stream of fluids;
a third stream of gas which is collected; and
a fourth stream of oil condensate which is collected;
wherein said first stream of pipeline-worthy gas is sent to a pipeline and said second stream is sent for further processing;
a compression unit;
flowing said third stream of gas to a gas pressure vessel;
collecting said third stream of gas into said gas pressure vessel;
performing compression of said collected gas in said gas pressure vessel until parameters of compressed gas are such that it can be compressed by said compression unit to provide a constant feed to said pipeline; and
transferring said compressed gas to said gas pipeline;
wherein said process reduces the amount of gas flared and/or vented during a completions operation by over 80%.

### Claim 12 (depends on 11)

The process according to claim 11, wherein said system further comprises a low pressure stage separator adapted to remove water and sand from said second stream of fluids and generating a fifth stream of oil condensate which is collected.

### Claim 13 (depends on 11)

The process according to claim 11, wherein said system further comprises a low stage condensate separator wherein said fourth stream of oil condensate and said fifth stream of oil condensate are collected, said low stage condensate separator generating a sixth stream of gas which is collected.

### Claim 14 (depends on 13)

The process according to claim 13, wherein said sixth stream of gas which is collected is sent to the gas pressure vessel.

### Claim 15 (depends on 11)

The process according to claim 11, wherein said process reduces the amount of gas flared and/or vented during completions operations by over 90%.

### Claim 16 (depends on 11)

The process according to claim 11, wherein said process reduces the amount of gas flared and/or vented during completions operations by over 95%.

### Claim 17 (depends on 11)

The process according to claim 11, wherein said process reduces the amount of gas flared and/or vented during completions operations by over 97.5%.
